Tender For Nctps Ii - M-I Circle - Bm Division - Unit I 600 Mw Boiler - Renewal & Reconditioning Of The Existing Corroded, Eroded And Damaged Expansion Bellow (Style#06) Between Economizer Outlet To Air Preheater Inlet Flue Gas Duct Area In Boiler At
Tender Overview
Project Description
Tender for Nctps Ii - M-I Circle - Bm Division - Unit I 600 Mw Boiler - Renewal & Reconditioning Of The Existing Corroded, Eroded And Damaged Expansion Bellow (Style#06) Between Economizer Outlet To Air Preheater Inlet Flue Gas Duct Area In Boiler At 36Mtr Elevation During Annual Overhaul Of 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Charges for dismantling existing Expansion Bellow cover plate between Economizer outlet to Air Preheater inlet flue gas duct @ 34mtr EL to facillitate to attend Bellow renewel work . Charges including for T&P's and consumables. |
| 2 | Charges for drawl of new material from NCTPS II store and leading, lifting including transportation to Unit I Boiler area at 36 Mtr elevation. Charges inclusive of consumables & T&P's. |
| 3 | Scaffolding (Size 3m x 3m) : Charges for fixing and removing of scaffolding arrangements for cutting, grinding and removing the wornout expansion joint and positioning, aligning, welding the new expansion joints in between Economizer outlet to Air Preheater inlet flue gas duct work around the boiler area / duct of size 3m x 3m at 36 Mtr elevation, including consumables, scaffolding pipes & other arrangements and T&p's. |
| 4 | Renewal of metallic Expansion joints ( Style #06 ) between Economizer outlet to Air Preheater inlet FG duct @ 36 Mtr elevation: Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded metalic expansion joints and gauching, leading, positioning of new expansion joint, aligning with the duct channel and complete welding. Including cost of consumables, T&p's. |
| 5 | Reconditioning of metallic Expansion joints ( Style #06 ) between Economizer outlet to Air Preheater inlet FG duct @ 36 Mtr elevation: This work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and expansion joints and visual inspection of bellow and marking of wornout and eroded spots, checking of bellow pitch gaps, cutting, grinding and wornout & eroded eroded part of bellow, rectification of expansion joint by patch up work including consumables, scaffolding arrangement and T&p's. |
| 6 | Charges for transportation of retrieved materials from Economizer outlet to Air Preheater inlet flue gas duct area (from 36 mtr to 0 mtr) of boiler and to devolute to NCTPS II store, including all charges such as labour, transport, consumables and T&P’s etc.,. |
| 7 | Charges for fabrication and erection of Expansion Bellow cover plate (New / Retrived) between Economizer outlet to Air Preheater inlet flue gas duct @ 34mtr EL after completion of Expansion Bellow renewel work . Charges including for T&P's and consumables. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender