Tender For Making Additional Temporary Illumination Arrangement Including Construction Of Temporary Structure At Ganga Sagar Main Mela Ground In Connection With Ganga Sagar Mela - 2027
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Dec 2026
6 days left
EMD
60000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Making Additional Temporary Illumination Arrangement Including Construction Of Temporary Structure At Ganga Sagar Main Mela Ground In Connection With Ganga Sagar Mela - 2027
BOQ
| Sl. No. | Item Description |
| 1 | Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. |
| 2 | Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 01.01.2027 including proper earthing arrangement complete as per direction of EIC. |
| 3 | Installation of following main switches and changeover switches as per direction of EIC (Main switches and change over switch will be supplied departmentally).a) 100 Amps. 415 volt TPN (Main switch)b) 100 Amps. 415 volt (change over switch) c) 63 Amps. 415 volt (do) d) 63 Amps. 415 volt TPN (Main switch)e) 32 Amps. 415 volt TPN (Main switch) |
| 4 | Maintenance of controlling station by engaging skilled labour for operation of the controlling switch from 01.01.2027 to 17.01.2027 as per direction. |
| 5 | Drawing the power line from substation to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. Accessories of the temporary Controlling station. |
| 6 | Supply on hire bases 4.88 M long 100 mm. Dia (AV) bottom and 50 mm. Dia (AV) top salbollah post and erecting the same at different places as per direction of EIC including excavation of earth and grouting the post as per I.E. rules average distance from post to post is 18 M. |
| 7 | Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.) |
| 8 | Providing Rotary signal lamp on hire basis (colour of lamp should be as per choice of the EIC) & to be fixed on 25 ft long salbollah / bamboo post (materials to be supplied by the agency) & making interconnection all complete as per direction of EIC & taken out the same after completion of Mela. From 05.01.2027 to 16.01.2027 i.e 12 days x 40 nos |
| 9 | Fixing of 18W/21W/36W CFL lamp at different places from the different feeder line to mela ground as per direction of EIC with supplying on hire basis 7/20 PVC insulated aluminum wire and plastic flexible wire for looping and all other necessary materials required to complete the work[damaged materials will have to be replaced by the agency at their own cost] as per direction of EIC from 06.01.2027 to 17.01.2027 = 12 days x 1200 Pts |
| 10 | Drawing of flood light points on PCC poles and salbollah post from different feeder line to roads, sea beach, latrine at different places in mela ground and outside mela ground as directed by EIC with the supply of 400 W. SON lamp and fixture and 400 watt. Sodium vapour lamp with shade including 7/20 PVC flexible wire for looping and all other required materials complete (damage materials will have to be replaced by the agency at their own cost from 03.01.2027 to 17.01.2027 = 15 days. |
| 11 | From 03-01-2027 to 09-01-2027=9days x 70 pts |
| 12 | From 10-01-2027 to 17-01-2027= 8days x 120 pts |
| 13 | Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 05.01.2027 to 17.01.2027 = 13 days x 700 pts. |
| 14 | Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis |
| 15 | Providing on hire basis including supplying, laying and transportation charges of 1.1 kv grade single core PVC insulated copper wires including dismantling the same after completion of the mela |
| 16 | Carrying charges of luminaries and accessories of fixed type High Mast from Ganga Sagar store to different site i.e. Kiosk cluster, K1 bus stand and K2 bustand by hiring of car and all other necessary arrangement as per requirement |
| 17 | Fitting fixing of the luminaries (9 Nos.) on the lighting tower by engaging skilled technician and laying of the departmental supplied PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. |
| 18 | Carrying back the luminaries and accessories of fixed type High Mast to Ganga Sagar PHE store after dismantling the luminaries, accessories, cable etc. at by hiring of car and all other necessary arrangement after completion of Mela |
| 19 | Fitting fixing the street light fixture on existing PCC pole/tower from different feeder line to different pole inside and outside Mela ground as per direction of EIC with supplying on hire basis 400 watt/250 watt/150 watt/70 watt./400 watt Sodium [Twin] vapour lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 01.01.2027 to 17.01.2027 = 17 days (Damaged materials will have to be replaced by the agency at their own cost, and all the fixture should be of Philips make). |
| 20 | 400 watt S.V. lamp = 70 pts. X 17 days |
| 21 | 250 watt S.V. lamp = 220 pts. X 17 days |
| 22 | 150 watt S.V. lamp = 100 pts. X 17 days |
| 23 | 400watt(single) SON T =150 pts x 17 days |
| 24 | Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different place of road,on hire basis from 01.01.2027 to17.01.2027 (17 days x 150 fittings per day) |
| 25 | Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. [For all CCTV arrangement] |
| 26 | Beautification arrangement of the Ganga Sagar PHE Mela office with different colour LED Par light, rice light, as per direction of EIC including supply on hire basis of LED display board [subject and design as per EIC] including fitting fixing of the same in front of mela office by suitable arrangement and dismantling of the all arrangement after completion of the mela |
| 27 | Carrying of all accessories of 9 meter long FRP pole i.e. luminaries, bracket and cable etc. FROM Ganga Sagar to site by suitable arrangement including fitting fixing of pole, luminaries and accessories with interconnection complete and dismantling the same after completion of mela with carrying back and storage to the departmental store as per direction of the EIC. |
| 28 | Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different place of road,on hire basis from 05.01.2027 to 16.01.2027 (12 days x 20 fittings per day) |
| 29 | Drawing ceiling light points from different feeder line to different shed at total latrine area of K1 & K2 bus stand, 1A Burning Ghat & 5 No Beach road as directed by EIC with supply on hire basis 40 watt bulb holder and controlling switch etc. on bamboo post making decorative LED Rope light lighting arrangemen where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 05.01.2027 to 17.01.2027 = 13 days |
| 30 | Guarding arrangement for the whole installation of the above items for the entire period round the clock with effect from 05-01-2027 to 17-01-2027 (1 personal / shift x 3 shift x 13 days) |
| 31 | Talking out the whole installation except PCC pole after mela period including salbollah post bamboo post and LT distribution line (which is drawn by PVC AL. wire as temporary basis) and arms brackets from the PCC poles and other places and storing the deptt. Materials properly in good condition at sagar store including testing when issue & return as per direction of EIC. |
| 32 | Add GST @ 18% |
| 33 | Add CESS @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysDec 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.