Tender For Nctps-Ii - M-Ii Circle - Ahp Dn. -Fahs- Unit-I - Overhauling Of Pdfac System In Esp First Two Rows Of Md-Pumps, D-Pumps, Intermediate Silos, Cooling Towers, Cooling Water Pumps, Transport Air Compressor Service, Conveying Air Compressor &
Tender Overview
Project Description
Tender for Nctps-Ii - M-Ii Circle - Ahp Dn. -Fahs- Unit-I - Overhauling Of Pdfac System In Esp First Two Rows Of Md-Pumps, D-Pumps, Intermediate Silos, Cooling Towers, Cooling Water Pumps, Transport Air Compressor Service, Conveying Air Compressor & Instrument Air Compressor & Its Auxiliaries. Ht/Lt Transformers, Modules, All Other Switch Gears (11/3.3Kv) Equipments, Breakers And Electrical & Instrumental Equipments Including Cost Of Consumables.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling the ESP MD pumps 300NB Expansion Bellow, Dome Valve & 300NB Knife edge gate valve in PDFAC system, including electrical & instrumental equipments Cost of consumables. |
| 2 | Inspection and rectification /replacement of MD pumps 300NB Expansion Bellow, Dome Valve & 300NB Knife edge gate valve, including electrical & instrumental equipments Cost of consumables. |
| 3 | Reassembly the MD Pump 300NB Expansion Bellow, Dome Valve & 300NB Knife edge gate valve & auxiliaries, including electrical & instrumental equipments Cost of consumables etc. |
| 4 | Dismantling the Puppet Valve 50NB, 65NB, dome valve 80NB, 200NB, switch valve, NRVs, Flow pad in PDFAC system, including Cost of consumables. |
| 5 | Inspection and rectification /replacement of Puppet Valve 50NB, 65NB, dome valve 80NB, 200NB, switch valve, NRVs, Flow pad, including electrical & instrumental equipments Cost of consumables. |
| 6 | Reassembly the Puppet Valve 50NB, 65NB, dome valve 80NB, 200NB, switch valve, NRVs, Flow pad & auxiliaries, including electrical & instrumental equipments Cost of consumables etc. |
| 7 | Dismantling of D pump vessels 300NB/200 inlet dome valve seals, Expansion Bellow & Flow pad assembly in PDFAC system, including electrical & instrumental equipments Cost of consumables. |
| 8 | Inspection and rectification /replacement of D pump vessels 300NB/200 inlet dome valve seals, Expansion Bellow & Flow pad assembly, including electrical & instrumental equipments Cost of consumables. |
| 9 | Reassembly the D Pump expansion bellow and discharge valve & auxiliaries, including electrical & instrumental equipments Cost of consumables etc. |
| 10 | Dismantling the Puppet Valve 80NB, 200NB, switch valve, NRVs, Flow pad in PDFAC system, including electrical & instrumental equipments Cost of consumables. |
| 11 | Inspection and rectification /replacement of Puppet Valve 80NB, 200NB, switch valve, NRVs, Flow pad, including Cost of consumables. |
| 12 | Reassembly the Puppet Valve 80NB, 200NB, switch valve, NRVs, Flow pad & auxiliaries, including electrical & instrumental equipments Cost of consumables etc. |
| 13 | Dismantling the Intermediate Silo Vent Bag filters, Fluiddizing pad, NRVs, 200NB gate valve. in PDFAC system, including electrical & instrumental equipments Cost of consumables. |
| 14 | Inspection and rectification /replacement of Intermediate Silo Vent Bag filters, Fluidizing pad, NRVs, 200NB Dome valve., including electrical & instrumental equipments Cost of consumables |
| 15 | Reassembly the Intermediate Silo Vent Bag filters, Fluidizing pad, NRVs, 200NB gate valve. auxiliaries, including Cost of consumables etc. |
| 16 | Dismantling the Fly Ash Silo 250NB Dome, Dump valve and inspection, rectification works in Intermediate silo in PDFAC system, including Cost of consumables. |
| 17 | Dismantling the blowers and heaters & lines inspection, rectification works in Intermediate silo in PDFAC system, including Cost of consumables. |
| 18 | Overhauling of PDFAC Transport Air Compressor service C kit, inlet & outlet coolers and Coupling spider bush inspection, including electrical & instrumental equipments Cost of consumables. |
| 19 | Overhauling of PDFAC Conveying Air Compressor service C kit, inlet & outlet coolers Coupling spider bush inspection, including electrical & instrumental equipments Cost of consumables. |
| 20 | Overhauling of PDFAC Instrument Air Compressor, Coupling spider bush inspection, including electrical & instrumental equipments Cost of consumables. |
| 21 | Overhauling of PDFAC Instrument Air Compressor dryer and inlet and utlet valves, Coupling spider bush inspection, rectification, including electrical & instrumental equipments Cost of consumables. |
| 22 | Overhauling of PDFAC HT transformers, modules, all other switch gears (11/3.3kv) equipments, breakers, bus duct,panels, cables, cable trays ,earthing systems, Level measuring instruments,E&I equipments and Hoists etc., including T&Ps and consumables. |
| 23 | Overhauling of PDFAC LT transformers, modules, breakers, bus duct, UPS , battery charger with battery banks, attending and rectifying PLC system, computer, CPU, Printers ,Lighting systems, panels, cables, cable trays ,lighting transformers & light fittings, earthing systems, Level measuring instruments,E&I equipments and Hoists etc., including T&Ps and consumables. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender