Tender For Operation And Maintenance Of Pump House (No.1 & 2) And Ugr Water Pumping Station At Bawana Industrial Area Phase-Ii (Bhorgarh), Delhi.
Tender Value
20.41 Lakhs
Estimated cost
Bid Submission
30 Nov 2026
7 days left
EMD
40840
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation And Maintenance Of Pump House (No.1 & 2) And Ugr Water Pumping Station At Bawana Industrial Area Phase-Ii (Bhorgarh), Delhi.
BOQ
| Sl. No. | Item Description |
| 1 | Supplying, fixing, testing & commissioning of double flanged sluice valve of rating PN 1.6 with non-rising spindle, bronze/gun metal seat, ISI marked complete with nuts, bolts, washers, gaskets and conforming to IS 780 of following sizes as required : 300 mm dia. |
| 2 | Supplying, fixing, testing & commissioning of double flanged sluice valve of rating PN 1.6 with non-rising spindle, bronze/gun metal seat, ISI marked complete with nuts, bolts, washers, gaskets and conforming to IS 780 of following sizes as required : 200 mm dia. |
| 3 | Providing, installation, testing and commissioning of non-return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc.as required : 200 dia |
| 4 | Supplying and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200 mm in height with air release valve on top and flanged connection to riser, drain arrangement with 25 mm dia gun metal wheel valve with required accessories, pressure gauge and painting with synthetic enamel paint of approved shade as required. |
| 5 | Providing to Pump Operator for Pumps Sets, D.G. Set, O & M of Water Supply System, by providing services of qualified & experienced staff as reqd. at site and as per the direction of Engineer-In-Charge. Pump Operator/Semi Skilled (365 Days X 2 Nos. in General Shift) a) 1 No. Pump Operator for UGR b) 1 No. Pump Operator Pump House |
| 6 | Providing to Helper Un-Skilled (365 Days X 1 No. in General Shift) a) Helper for UGR and Pump House |
| 7 | Providing to Electrician/Skilled (7 Days X 12 Months =84 Days for UGR and Pump House) |
| 8 | Consumable Electrical items i.e. LED Tube Light, Wire, Cables, Switch & Sockets, Ceiling Fan, Wall Fan, Exhaust Fan, Fan Regulator, MCB, MCCB, Contractors, Relay, Fuse, Diesel for DG Set etc. as may be required for the daily Operation at the site. For UGR and 2 Nos. Pump House (Lump sump) |
| 9 | Annual Comprehensive Maintenance for Wireless water level indicator System controller unit of motor pump including components including repair/replacement of defective components/parts and quarterly basis by company technician to keep the parts/components functional etc. as per same terms and conditions of original warranty during period of 1 year. i) controller unit-2 Nos., ii) Sump Transmitter unit-2 Nos., iii) Top Transmitter unit-2 Nos., iv) Electromagnetic Flow Meter (65mm)-02 Nos, v) Fusion-5 Nos., vi) Web Subscription For controller, vii) Web Subscription for Flow Meter etc. (Pump house No.1 & 2) |
| 10 | Annual Comprehensive Maintenance for of 5 HP existing Submersible pump and chlorinator (100 Ltr.) including all the electrical, mechanical, instrumentation items /equipment’s installed /fixed the premises of pump house like submersible pump (5 HP), LT panel, internal/external fittings and fixtures, wiring, cabling, MS Pipe along with their accessories, pressure gauge, NRV valve, etc. All the equipment’s /items should be in perfect working condition for 24 hrs trouble free operation including watch & ward for duration one year (for Pump house No.1 & 2) |
| 11 | Annual comprehensive maintenance of 40 HP capacity existing UGR Water Motor of including rewinding with super enamelled copper winding with E' class insulation Varnishing, baking cutting and dismantling old brunt winding wire & Terminal plate, reassembling, Re-Installation and all the electrical mechanical, instrumentation items/ equipment’s installed/fixed in premises of water pumping station like motors pumps, dewatering pumps, LT panel, cabling along with their accessories, pressure gauge, NRV valve, sluice valve MS Pipe, welding and jointing etc. All the equipment’s /items should be in perfect working condition for 24 hrs trouble free operation for duration one year (for UGR). |
| 12 | Repairing and Servicing of existing 62.5 KVA DG Set i.e. oil Filter, Air Filter, Oil, New Battery 12 V, Terminal Plates, Leads, suitable capacity D.G. Set Charger, Voltmeter, Ammeter and Greasing etc. complete in all respect. |
| 13 | Supply, Installations, Testing and Commissioning of Retrofit type emission control device in the exhaust side of 62.5KVA DG Set Retrofit Emission Control Device on existing 62.5 KVA DG Sets of OEM Name make DG Set to reduce particulate matter, Hydrocarbon and Carbon Monoxide Emission by least 70%. Device should be “Type Approved” as per the system & Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) for Diesel Power Generating Set Engines, No extra Space to install RECD will be provided around DG Set considering the constraint of the space and its cost including testing, Commissioning of EDC etc as required. in all respect with specifications. |
| 14 | Annual comprehensive maintenance of existing 62.5 KVA DG Set i.e. oil Filter, Air Filter, Oil, Battery, Terminal Plates, Leads, Charger, Voltmeter, Ammeter and Greasing etc. complete in all respect. |
| 15 | Supply, Installations, Testing and Commissioning Single Phase 1 HP Sewage Submersible Pump 220 V, 50 Hz, Stainless Steel, 11500 LPH complete in all respect. |
| 16 | Cleaning, Repairing and Servicing of existing of NRV/Sluice Valve 300 mm, 200mm and 65 mm including greasing, rubber gasket and enamel paint complete in all respect. |
| 17 | Cleaning and repairing of existing UGR 300 mm MS pipe and Pump House to UGR 100mm MS Pipe by the Super sucker machine with pressure of jetting pump complete in all respect. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysNov 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents