Tender For Shifting Of Existing Ht Line Cum Lt Line Towards Construction Of Major Storm Water Drainage Work At Nh-16, Iskcon Opposite & Renault Showroom, Paikanagar, Bhubaneswar
Tender Value
11 Lakhs
Estimated cost
Bid Submission
02 Dec 2026
10 days left
EMD
11100
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Existing Ht Line Cum Lt Line Towards Construction Of Major Storm Water Drainage Work At Nh-16, Iskcon Opposite & Renault Showroom, Paikanagar, Bhubaneswar
BOQ
| Sl. No. | Item Description |
| 1 | Materials for 11 KV Cut Point with 180 Degree Angle (Part-A)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.) (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 2 | Straight cross arm 100X50X6 mm, 9.56Kg/Mtr., each channel (GI) length 1.2 Mtr., 2 no's. channel (GI)required= (2X9.56X1.2) |
| 3 | Fish plate (GI) 50X6 mm, 2.36 Kg/ Mtr., each 0.280 Mtr. length, 8 no's required= (8X2.36X0.280) |
| 4 | Straight cross arm 100x50x6 mm, 9.56Kg/Mtr., each channel (GI) length 0.306 Mtr., 2 no's. channel (GI) required= (2X9.56X0.306) |
| 5 | Danger Plate, 1 no's |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting (B&S) 70 KN, 3 Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthig of support (Coil type) |
| 13 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 14 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 15 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 KV |
| 16 | Spike (GI) (using 50x6mm Flat (GI) welded with 8 mm square bar) 2 Nos of spike per set in each pole) |
| 17 | GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut pole) |
| 18 | Black Paint(GIS Numbering & Zebra Stripping) |
| 19 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 20 | Contingency@3% |
| 21 | Tools & Plants@2% |
| 22 | Transportation @ 7.5% |
| 23 | Erection charges @ 5% on Trf//Breaker/ WPB/ H-Pole |
| 24 | Erection charges @ 10% (except Trf/Breaker/WPB/H-Pole/HT stay set/GI Pipe/PSC pole/GI Pipe earthing) |
| 25 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 26 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 27 | MATERIALS FOR 11 KV Pin Points With 90 Degree Angle (Part-B)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.) (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 28 | Straight cross arm 100X50X6 mm, 9.56Kg/Mtr., each channel (GI) length 1.2 Mtr., 4 no's. channel (GI)required= (4X9.56X1.2) |
| 29 | Fish plate (GI) 50X6 mm, 2.36 Kg/ Mtr., each 0.280 Mtr. length, 16 no's required= (16X2.36X0.280) |
| 30 | Straight cross arm 100x50x6 mm, 9.56Kg/Mtr., each channel (GI) length 0.306 Mtr., 4 no's. channel (GI) required= (4X9.56X0.306) |
| 31 | Danger Plate, 1 no's |
| 32 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 33 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 34 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 35 | 11 KV pin insulator polymer |
| 36 | H W fitting (B&S) 70 KN, 3 Bolt |
| 37 | Disc insulator (B&S) 70 KN polymer |
| 38 | Earthig of support (Coil type) |
| 39 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 40 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 41 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 KV |
| 42 | Spike (GI) (using 50x6mm Flat (GI) welded with 8 mm square bar) 2 Nos of spike per set in each pole) |
| 43 | HT Stay clamp, 50X8 mm. flat 3.14Kg/ Mtr, 0.551 Mtr length 2 no's qty required (1 Pair) |
| 44 | HT Stay Set (Complete) |
| 45 | HT Stay Insulator Type-C |
| 46 | 7/10 SWG Stay Wire 15kg/ stay |
| 47 | GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut pole) |
| 48 | Black Paint(GIS Numbering & Zebra Stripping) |
| 49 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 50 | Contingency@3%= |
| 51 | Tools & Plants@2% (Except HT Stay Set) |
| 52 | Transportation @ 7.5% = |
| 53 | Erection charges @ 5% on Trf//Breaker/ WPB/ H-Pole |
| 54 | Erection charges @ 10% of (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI pipe earthing) |
| 55 | Fixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembły2) Stay Rod & Stay plate3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 56 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 57 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 58 | MATERIALS FOR 11 KV Pin Points With WPB (Part-C)100 SQ.MM. AAAC XLPE Covered Conductor-11 kV |
| 59 | Contingency@3% |
| 60 | Tools & Plants@2% |
| 61 | Transportation @ 7.5% |
| 62 | Erection charges @ 10% of H (except Trf/Breaker/WPB/H-Pole/HT stay set/ GI Pipe/ PSC pole/ GI pipe earthing) |
| 63 | Installation of 100 KVA, 11/0.4 KV DSS without transforme-1 no. (Part-D)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 64 | Top Channel Gl 100 X 50 X 6 mm. (3000 mm long) (9.56Kg/Mtr., 2 no's) (Each 2x3x9.56= 57.36 Kg) |
| 65 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 66 | M.U Channel GI 75x40x4.8 mm (3000 mm long)(7.14Kg./ Mtr., 2 no's) (Each 2x3x7.14 = 42.84 Kg) |
| 67 | AB Switch Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 nơ's) (Each 2x3x7.14 = 42.84 Kg) |
| 68 | AB Switch Side Şupport Channel 100X50X6 mm, 9.56 Kg/Mtr., each channel length 0.35 Mtr., 2 no's channel (GI) required =9.56x2x0.35) |
| 69 | Channel (GI) Support for down Pipe 75X40X4.8mm., 7.14Kg/Mtr., each channel length 0.8 Mtr., 1 no's channel required = (7.14x0.8x1) |
| 70 | HG/DO Fuse Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg/Mtr., 2 no's) (Each 2x3x7.14= 42.84 Kg) |
| 71 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (810 mm long, 2 no's) (7.14Kg./Mtr., 2 no's) (Each 2x0.810x7.14= 11.57Kg) |
| 72 | Cantilever Support Angle (GI) 50x50x6 mm GI (1282 mm long) (4.5Kg./Mtr., 2 no's) (Each 2x1.282x4.5= 11.54Kg) |
| 73 | Transformer Base GI Channel 100X50X6 mm (3000 mm long) (9.56Kg./Mtr, 2 no's.) (Each 2x3x9.56= 57.36 Kg) |
| 74 | Transformer Base Support GI Channel 100X50X6 mm (515 mm long) (9.56Kg./Mtr., 2 no's) (Each 2x0.515x9.56= 9.85 Kg) |
| 75 | Transformer Belting Angle 50x50x6 mm GI (3000 mm long)(4.5Kg./Mtr., 2 no's) (Each 2x3x4.5 Kg) |
| 76 | Transformer Belting Support Angle 50x50x6 mm GI (580 mm long) (4.5Kg./ Mtr.,2 No's) (Each 2x0.580x4.5= Kg) |
| 77 | LTDB Mounting Angle 50x50x6 mm GI (1000 mm long) (4.5Kg./Mtr, 2 no's) (Each 2x1x4.5 Kg) |
| 78 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11 Mtr. for AB switch, 2.8 Mtr. for HG Fuse, 5x2 Mtr. for DTR Neutral, (1.3+4.5) Mtr. for DTR Body, 0.500 Mtr. for LTDB & AB Switch operating handle, 3 Mtr. for Fencing) (Each 65.6x2.36= 154.81 Kg) |
| 79 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 80 | 55 mm² AAAC XLPE Covered Conductor |
| 81 | 4CX150 mm² LT XLPE Cable (Armoured)- For 100 KVA Trf |
| 82 | 1.1 kv 4core, 150 sqmm, XLPE insulation armoured-Aluminium UG cable from LTDB to Pole |
| 83 | AB Switch(11KV, 200A, 3pole, 50Hz) |
| 84 | H.G.Fuse( 11KV, 200A, 3Pole) |
| 85 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 86 | POLYCARBONATE BIRD GUARD |
| 87 | Disc insulator (B&S)70 KN polymer |
| 88 | HW fiting (B&S)70KN(3 Bolted) |
| 89 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 90 | 11KV pin insulator polymer |
| 91 | HT Stay set complete |
| 92 | HT stay Clamp (1.9Kg/ Pair) |
| 93 | HT stay insulator TYPE-C |
| 94 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 95 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 Mtr. long |
| 96 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 97 | GI Barbed wire/Anticlimbing device (3Kg/Pole) |
| 98 | Back Clamp for anticlimbing device 25x3 mm. flat (GI), 0.59Kg/ Mtr. Flat of 0.510 Mtr. length & 8 no's =(8x0.59x0.510) |
| 99 | Danger plate 11kv |
| 100 | Back Clamp for Danger plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510 Mtr. length 2 no's=(2x0.59x0.510) |
| 101 | Name plate |
| 102 | Structure Numbering and Marking(i)Yellow Colour Paint for Backaround (GIS Numbering & Zebra Stripping) for Background |
| 103 | (ii)Black Colour Paint for numbering (GIS Numbering & Zebra Stripping) for Background |
| 104 | Contigency @ 3% |
| 105 | Tools & Plants@2% (Except Stay/Earthing/Cable) |
| 106 | Transportation @ 7.5% |
| 107 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 108 | Erection charges @ 10%(except Trf/Breaker/WPB/H-Pole/HT stay set/GI pipe/PSC pole/GI pie earthing)) |
| 109 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) = 0.450Cum. (Per Pole) (For WPB Pole) |
| 110 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm) = 0.113 Cum. (Per Pole) |
| 111 | PCC ration 1:3:6 (M-10 Grade) For DSS Area (5x3x0.1)= 1.5 Cum |
| 112 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay nsulator. |
| 113 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 114 | Laying of 4 C x 150 mm² LT XLPE Cable |
| 115 | SITC and Erection of GI Fencing with Gate |
| 116 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 117 | Supply and erection of double Compression Flameproof Tyре Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 118 | Inspection Fee of Transformer (100 KVA to 1000 KVA) |
| 119 | Inspection Fee of LV Cable |
| 120 | Inspection Fee of Drawing Checking and Approval |
| 121 | MATERIALS FOR LT AB Cable Line (Part-E)LT Accessories with Eye hook and Clamp4Cx70 mm² (P)+1Cx70 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 122 | 4 WAY SERVICE Distb. box with kit kat fuse and Aluminium bus bar. |
| 123 | INSU. SHACKLE LT WITH METAL 100X115 MM |
| 124 | GI STRAP SHACKLE INSU (N+B) |
| 125 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm. |
| 126 | Contigency @ 3% |
| 127 | Tools & Plants@2% (Except LT Stay set/GI pipe Earthing) |
| 128 | Transportation @ 7.5%= |
| 129 | Erection Charges @ 10% (except Trf/Breaker/WPB/ H-Pole/HT Stay set/GI Pipe/ PSC Pole/GI Pipe earthing) = |
| 130 | Dismantling Material (Part-F)Dismantling of 09/11 Mtr. Joist/WPB Pole- 116X100 mm |
| 131 | Dismantling of 9/8 Mtr. PCCJoist Pole |
| 132 | Dismantling of 11 kV Pin insulator with pin |
| 133 | Dismantling of 11 kV Disc insulator with Hardware |
| 134 | Dismantling/ Removal of MS Channel from Double Pole Structure/ Pole |
| 135 | Dismantling of existing 11/0.4kV, 33/0.4KV, 500kVA ThreePhase Distribution Transformer including removal ofHT/LT leads, earth connections and unloading by crane ifrequired. |
| 136 | Dismantling of ACSR/AAAC 34/ 55 mm2 from overhead line |
| 137 | Dismantling of various size LT AB Cable |
| 138 | Dismantling of 11 kV /33KV GO/AB Switch/Isolator/DDfuse/fuse set |
| 139 | Dismantling of the GI wire 7/8, 7/10 SWG etc |
| 140 | Dismantling of coil earthing |
| 141 | Dismantling of stay set complete |
| 142 | Dismantling of stay insulator (Guy Insulator) |
| 143 | Dismantling of Danger Board |
| 144 | Dismantling of Lightening Arrester (LA) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysDec 02, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender