Tender For Upgradation Of 66Kv Substation Odakkali By Upgrading Kothamangalam-Odakkali Portion Of Old 6Kmal Dc Feeder To 110Kv Dc Feeder And Replacing 2X10mva Transformer With2x20mva Transformer
Tender Value
17.33 Lakhs
Estimated cost
Bid Submission
28 Nov 2026
7 days left
EMD
43400
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ernakulam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Upgradation Of 66Kv Substation Odakkali By Upgrading Kothamangalam-Odakkali Portion Of Old 6Kmal Dc Feeder To 110Kv Dc Feeder And Replacing 2X10mva Transformer With2x20mva Transformer
BOQ
| Sl. No. | Item Description |
| 1 | Please Enable Macros to View BoQ information |
| 2 | Erection of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCTon the already erected structure of above 1.5m height after opening of crates at the place of storage, leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 3 | Dismantling of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCT from the already erected structure of above 1.5m height , leading to storage place carefully keeping at vertically not allowing tilting from vertical position morethan the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 4 | Loading one 110/66KV CT / CVT / PT / CC from the place of its storage to department lorry using required lifting device without causing any damage to equipment and its parts. |
| 5 | Unloading one 110/66KV CT/PT/CVT/CC from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers. |
| 6 | Erection of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCTon the already erected structure of above 1.5m height after opening of crates at the place of storage, |
| 7 | Dismantling of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCT from the already erected structure of above 1.5m height , leading to storage place carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 8 | Loading one 110/66KV CT / CVT / PT / CC from the place of its storage to department lorry using required lifting device without causing any damage to equipment and its parts |
| 9 | Unloading one 110/66KV CT/PT/CVT/CC from department lorry to substation site using suitable lifting device and dragging to safeplace without causing any damage to CT as per the direction of the department officers. |
| 10 | Erection of 1 No. 110/66KV LA/Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. |
| 11 | Dismantling of 1 No. 110/66kV LA / Post insulator from the already erected structure of above 1.5m height , leading to storage place carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 12 | Loading one 110/66KV LA from the place of its storage to department lorry, if required, after dragging up to 50M using suitable lifting device carefully without causing any damage to equipments and fastening in the lorry make it ready for transportation as per the direction of the department officers. |
| 13 | Unloading one 110/66KV LA from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to LA as per the direction of the department officers. |
| 14 | Conveying to the erection site and erecting carefully 1 No. 33KV CT/PT/110KV NCT &RVT/NCT(52/36kV) on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting fromvertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 15 | Loading one 33kV CT / PT / 110kV NCT from the place of its storage to department lorry using required lifting device without causing any damage to equipment and its parts. |
| 16 | Unloading one 33KV CT/PT/110kV NCT from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers. |
| 17 | Unpacking the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers |
| 18 | Dismantling the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers. |
| 19 | Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm control cable (Armoured or unarmoured) from cable drums cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefully including for providing loopwherever necessary and providing cable marker at both ends of cable as per direction of departmental staff at site |
| 20 | Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site. |
| 21 | Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or unarmoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site |
| 22 | Doing termination of all sizes of PVC insulated copper control cable 2.5 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site. |
| 23 | Doing termination of all sizes of PVC insulated copper control cable 4.0 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., using cable tie and cable tie neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site. |
| 24 | Supplying aluminium cable tags punching number and alphabets up to 7 digits and binding to cable using copper wire including cost of all materials as per the direction of Board Officials at site. |
| 25 | Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. for 20/19 core2.5sqmm cable/12 core 4 sqmm cable (using gland of size 28-32mm) |
| 26 | Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. for 4/2 core2.5 sq mm cable/4/2 core 4 sq mm cable (using gland of size 16-22mm). |
| 27 | Erection of yard structures and assembling of columns and beams using bolt and nut including punching of holes. |
| 28 | Dismantling of yard structures , columns and beams using bolt and nut including punching of holes. |
| 29 | Drilling holes in yard structure |
| 30 | Cutting of steel angle in yard structure erection |
| 31 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 32 | Levelling, Cutting and fixing in position departmentally supplied MS Chequered plate 6 mm, 10 mm or 12mm thick in suitable length and width including providing lifting legs and suitable holes for lifting including grinding sides and corners etc. complete |
| 33 | Laying of departmentally supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers. |
| 34 | Welding one end of the bended GI strip of size50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete. |
| 35 | Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete. |
| 36 | Laying LT/DC cables in trench including drawing through pipes wherever necessary. |
| 37 | Glanding LT / DC cable of various sizes after removing insulation, armour etc. and making necessary holes on gland plates numbering cable etc. complete including supply of gland numbering plate etc. |
| 38 | Laying 1 x 500 sq mm XLPE cables in trench including drawing through pipes wherever necessary . |
| 39 | Mounting one 1 x 500 mm2 outdoor / indoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmentalofficers |
| 40 | For dismantling 1 x 500 mm2 out door / indoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmental officers |
| 41 | Doing outdoor/indoor cable termination of 1x500 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket |
| 42 | Dismantling 1x500 sq mm 11KV XLPE cables in trench including removing through pipes wherever necessary |
| 43 | Loading 1x500 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers. |
| 44 | Unloading 1x500 sq. mm XLPE cable from department lorry to substation site and stacking properly withoutcausing any damage to its insulation as per the directionof department officers |
| 45 | Providing interconnection between equipments usingACSR Moose/ Kundah/ wolf Single conductor at both endswith compressed/ bolted ends including uncoiling andcutting of conductor as per the direction of departmentalofficers. |
| 46 | Dismantling interconnection between equipments using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted endsincluding uncoiling and cutting of conductor as perthe direction of departmental officers. |
| 47 | Providing droppers and connecting to lines /equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf Single conductor at both ends with compressed/ bolted ends including uncoiling andcutting of conductor as per the direction of departmentalofficers. (For one phase) |
| 48 | Dismantling the droppers and connection from lines / equipments or jumperbetween two buses withoutsuspension insulators usingACSR Moose/ Kundah/ wolfSingle conductor at both endswith compressed/ bolted ends,(for one phase) includingtransportation of materials tothe stockyard from the sitewith an initial lead of 50munder the supervision anddirection of department staff at site. |
| 49 | Erection of 1 No. 11KV CT/PT/11KV NCT on thealready erected structure after opening of crates at the placeof storage leading to site carefully keeping at verticallynot allowing tilting from vertical position more thanthe specified angles, keeping lines and levels as per thedirection of the departmental officers. |
| 50 | Unloading one 11kVCT/PT/11kV NCT fromdepartment lorry to substation site using suitable liftingdevice and dragging to safe place without causing anydamage to CT as per the direction of the departmentofficers. |
| 51 | Loading one 11kV CT / PT /11kV NCT from the place ofits storage to department lorry using required lifting devicewithout causing any damage to equipment and its parts. |
| 52 | Dismantling of 1 No. 11kV CT/PT/ 11kV NCT from thealready erected structure of above 1.5m height , leadingto storage place carefully keeping at vertically notallowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. |
| 53 | Erection of 1 No. 11KV LA (station type ) /11KV Postinsulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. |
| 54 | Collecting from store or substation wherever availabletools and materials such as jacks pulling and liftingmachines,rails,sleepers, plies,ropes, empty drums, dummyplates, bolts and nuts gaskets,etc. including loading andunloading in department vehicle and accompanyingand returning the same afte rcompleting the work as perthe direction of departmentalofficers.( Only if required) |
| 55 | Pulling the power transformers of weight 20T to30T, on the rail track, travelling for a distance up to30M, using sleepers, rails,jacking, pulling and keepingready for placing on the correct plinth as per thedirection of departmental officers at site, safely withoutdamaging any equipments and observing all safetyprecautions. |
| 56 | Pulling the power transformers of weight above40T to 50T, on the rail track, travelling for a distance up to30M, using sleepers, rails, jacking, pulling and keepingready for placing on the correct plinth as per thedirection of departmental officers at site, safely withoutdamaging any equipments and observing all safetyprecautions. |
| 57 | Turning the transformer of weight 20T to 30T,up to 90degree using required tools safely and taking allprecautions as per the directions of the departmentalofficers ( only if it is absolutely necessary andwhere departmental crane is not available) |
| 58 | Turning the transformer of weight above 40T to 50 T,up to 90 degree using required tools safely and taking all precautions as per the directions of the departmental officers ( only if it is absolutely necessary and where departmental crane is not available) |
| 59 | Assembling the 20 MVA, 110/11kV transformer withall accessories in complete shape and filling oil ifrequired including arresting the movement of thetransformer by locking as per the direction of thedepartmental officers. |
| 60 | Covering the transformer with tarpaulin using ropes,bamboos etc. |
| 61 | Turning and shifting 6000 L/H capacity transformer oilfiltering plant or wheel mounted 10000/15000 Litre.oil tank with all accessories for a distance of 20M to road,towing the machine with department lorry by the use ofD-Shackle and iron ropes , accompanying the lorryincluding supervision through out the journey especially inturnings to avoid falling of plant. Remove the machinefrom the lorry and drags up to 10M for safe storagewherever required. |
| 62 | Giving three phase connection to the filter unitfrom the supply mains using cable including fitting threenumbers of fuse units near the filter unit and laying the cablefrom control room to filter unit and trial run of filter unitafter giving connection etc.complete. ( Only if foundabsolutely necessary and where departmental staff isnot available ). |
| 63 | Loading the empty oil tank of capacity 10000/15000 Ltr.From the place of its storage using wooden blocks, leveretc. and moving the tank to a distance of 10M from switchyard then loading the same to the dept. vehicle using chainpulley etc. carefully tying the tank in vehicle accompanyingthe vehicle up to ..................substation, removing ties andunloading the tank carefully by the use of wooden blocksrails, chain pulley etc. again moving the tank to a distanceof 50M, for safe storage. |
| 64 | Filling the oil in to 10000-15000 Ltr. capacitytank after bringing the new oil barrel from its place ofstorage and circulating the same to obtain the necessaryvalue. |
| 65 | Filling the filtered oil into the main and OLTC tank thenconducting hot oil circulation till to obtain a satisfactoryvalue of Megger and BDV for the oil including collecting ofsample and taking BDV in each interval, taking Meggerreading etc. and after filtering provide the breather. |
| 66 | Connecting Vacuum Pump and creating vacuum pressureup to -760 Hg/mm and keeping the same for 24Hours and monitor the same after leading the plant to yardincluding connecting equalising connection for OLTC. |
| 67 | Disconnecting the power connections to the filteringplant/ vacuum pump, coiling the cable, disconnect the hoses and coiling them and folding and removing tarpaulin used for covering the transformer, moving the filter plant and vacuum pump to a distant place as directed by the department staff. (where departmental staff is not available and is found absolutely necessary). |
| 68 | Preparing wiring schedule per transformer / feeder bay of110 or 66kV with details oftype of cable, core and colour, ferrule No. andterminal no of equipments/panels includinggiving full details in A4 sheet with computer print providingouter border line and sheet no etc. and supplying in theshape of book with special binding etc. and assisting thedepartmental officers at the time of relay testing andcommissioning |
AI Tender Summary
Tender Timeline
Nov 21, 2026
11:30 IST
Tender Published
Tender notice published.
TodayNov 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysDec 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.