Bids Are invited for Custom Bid For Services - ---- - Safe Carriage Of 8.5 Mtr. Long Pcc Pole From Store Center Etah/Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. , Safe Carriage Of
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Safe Carriage Of 8.5 Mtr. Long Pcc Pole From Store Center Etah/Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. , Safe Carriage Of 11/13 Mtr Stp From Store Center Etah/Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. , Safe Carriage Of 9 Mtr Stp From Store Center Etah/Nearest 33/11 Kv S/S To Direct Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. , Safe Carriage Of Line Material From Store Center Etah/Nearest Substation To Pit Site In Distance Range 0 To 60 Km. Including Loading & Unloading At Both Ends. , Opening Of Binding & Removal Of Dog/ Raccoon/ Rabbit Conductor With 33 Kv/Ht/Lt Line From Broken Pcc Poles/Rails/ Stp And Stacking At Safer Place. , Opening Of Binding & Removal Of Acsr Weasel Conductor/ Gi Wire With 33 Kv/Ht/Lt Line From Broken Pcc Poles/Rails/ Stp And Stacking At Safer Place. , Opening Of Binding & Removal Of Abc 3X95+1X35+1X16/3X50mm With 33 Kv/Ht/Lt Line From Broken Pcc Poles/Rails/ Stp And Stacking At Safer Place. , Opening Of Binding & Removal Of Abc 3X120+1X70+1X16 With 33 Kv/Ht/Lt Line From Broken Pcc Poles/Rails/ Stp And Stacking At Safer Place. , Erection Of 8.5 Mtr. Long Pcc Poles As Single Support Including Fixing Of All Ht/Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl/Respo Normes , Erection Of 9 Mtr. Stp As Single Support Including Fixing Of All Ht/Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl/Respo Normes , Erection Of 11/13 Mtr.Stp As Single Support Including Fixing Of All Ht/Lt Accessories Etc. Complete.Pole Should Be Grouted Properly As Per Dvvnl/Respo Normes , Erection Of 8.5 Mtr. Long Pcc Poles As Double Pole/ Section Pole Including Drilling,Cutting Etc. And Fixing Of All Accessories Etc. Complete. , Erection Of 11Mtr. Stp As Double Pole/ Section Pole Including Drilling,Cutting Etc. And Fixing Of All Accessories Etc. Complete. , Laying Stringing & Sagging Of 3 Phase 3 Wire 33 Kv Dog/ Raccoon/ Rabbit Conductor Including Binding & Nozzling. , Laying Stringing & Sagging Of 3 Phase 3 Wire 33/Ht/Lt Line With Acsr Weasel Conductor/ Gi Wire Including Binding & Nozzling. , Laying Stringing & Sagging Of 3 Phase 3 Wire 33/Ht/Lt Line With Abc 3X95 Mm/3X50 Mm. Including Binding & Nozzling. , Laying Stringing & Sagging Of 3 Phase 3 Wire 33/Ht/Lt Line With Abc 3X120+1X70+1X16 Including Binding & Nozzling. , Straightening Of Tilted Pcc Poles/Stp/Rail Single Support Of Ht/Lt Line After Opening Of Nuzzling, Digging Of Pit Applying Anti Direction Force For Making Of Proper Alignment Of Line. , Straightening Of Tilted D/P After Opening Of Connection Applying Anti Direction Force, Digging Of Dug For Proper Alignment Of Line Including Reconnection Etc. Complete. , Opening Of Ht/Lt Connections & Lowering Of 25/63 Kva T/F From D/P/Plinth And Shifting Up To In Safer Place. , Opening Of Ht/Lt Connections & Lowering Of 100 Kva T/F From D/P/Plinth And Shifting Up To In Safer Place. , Dismanteling Of Old/Damage Stp/Rs Joist Of Ht/Lt Line And Carriage To Store Centre Etah , Re-Sagging Of Dog/ Raccoon/ Rabbit Conductor Loose 33/Ht/Lt Conductor After Opening, Binding, Nozzling Etc. , Re-Sagging Of Acsr Weasel Conductor/ Gi Wire Loose 33/Ht/Lt Conductor After Opening, Binding, Nozzling Etc. , Re-Sagging Of Abc 3X120+1X70+1X16 Loose 33/Ht/Lt Conductor After Opening, Binding, Nozzling Etc. , Re-Sagging Of Abc 3X50/3X95 Loose 33/Ht/Lt Conductor After Opening, Binding, Nozzling Etc. , Replacement Of 11 Kv Cross Arms V Type Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 11 Kv Pin Insulator Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 11 Kv Pin With Nut Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 11 Kv Disc Insulator Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of Cross Arms Holding Clamps Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of F Clamps Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of Lt Shackle Insulator Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 33 Kv Cross Arm Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 33 Kv Pin With Nut Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Replacement Of 33 Kv Pin Insulator Broken/Damaged/Missing Accessories By New Accessories Including Opening Of The Same And Refixing. , Retightening Of Stay Rod. Etc. Complete. , Providing Fixing Of Stay Rod With Nuzzling Etc. Complete. , Earthing Of Pcc/Rs Joist/Stp As Per Respo Norms. , Carriage Of Old Material From Pit Site To Je Store/Store Center, Etah In Distance Range 0 To 10 Km Including Loading & Unloading And Proper Stacking. , Mounting Of 25/63 Kva T/F On Double Pole/Plinth Including Making Of The Connection Etc Complete. , Mounting Of 100 Kva T/F On Double Pole/Plinth Including Making Of The Connection Etc Complete. , Chopping Of Tree Branches , Repairing/ Resagging / New Guarding Of Ht Lines With Gi Wire As Per Respo Norms
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safe carriage of 8.5 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. | Safe carriage of 8.5 mtr. long PCC pole from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 2 | Safe carriage of 11/13 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. | Safe carriage of 11/13 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 3 | Safe carriage of 9 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. | Safe carriage of 9 mtr STP from store center Etah/nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 4 | Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 60 Km. including loading & unloading at both ends. | Safe carriage of line material from store center Etah/nearest substation to pit site in distance range 0 to 60 Km. including loading & unloading at both ends. |
| 5 | Opening of binding & removal of Dog/ Raccoon/ Rabbit conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. | Opening of binding & removal of Dog/ Raccoon/ Rabbit conductor with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 6 | Opening of binding & removal of ACSR weasel conductor/ GI wire with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. | Opening of binding & removal of ACSR weasel conductor/ GI wire with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 7 | Opening of binding & removal of ABC 3X95+1X35+1X16/3x50mm with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. | Opening of binding & removal of ABC 3X95+1X35+1X16/3x50mm with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 8 | Opening of binding & removal of ABC 3x120+1x70+1x16 with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. | Opening of binding & removal of ABC 3x120+1x70+1x16 with 33 KV/HT/LT line from broken PCC poles/rails/ STP and stacking at safer place. |
| 9 | Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes | Erection of 8.5 mtr. long PCC poles as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 10 | Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes | Erection of 9 mtr. STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 11 | Erection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes | Erection of 11/13 mtr.STP as single support including fixing of all HT/LT accessories etc. complete.Pole should be grouted properly as per DVVNL/RESPO normes |
| 12 | Erection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. | Erection of 8.5 mtr. long PCC poles as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. |
| 13 | Erection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. | Erection of 11mtr. STP as Double Pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete. |
| 14 | Laying stringing & sagging of 3 phase 3 wire 33 KV Dog/ Raccoon/ Rabbit conductor including binding & nozzling. | Laying stringing & sagging of 3 phase 3 wire 33 KV Dog/ Raccoon/ Rabbit conductor including binding & nozzling. |
| 15 | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ACSR weasel conductor/ GI wire including binding & nozzling. | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ACSR weasel conductor/ GI wire including binding & nozzling. |
| 16 | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x95 mm/3x50 mm. including binding & nozzling. | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x95 mm/3x50 mm. including binding & nozzling. |
| 17 | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x120+1x70+1x16 including binding & nozzling. | Laying stringing & sagging of 3 phase 3 wire 33/HT/LT line with ABC 3x120+1x70+1x16 including binding & nozzling. |
| 18 | Straightening of tilted PCC poles/STP/Rail single support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. | Straightening of tilted PCC poles/STP/Rail single support of HT/LT line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line. |
| 19 | Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. | Straightening of tilted D/P after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete. |
| 20 | Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P/Plinth and shifting up to in safer place. | Opening of HT/LT connections & lowering of 25/63 KVA T/F from D/P/Plinth and shifting up to in safer place. |
| 21 | Opening of HT/LT connections & lowering of 100 KVA T/F from D/P/Plinth and shifting up to in safer place. | Opening of HT/LT connections & lowering of 100 KVA T/F from D/P/Plinth and shifting up to in safer place. |
| 22 | Dismanteling of old/damage STP/RS Joist of HT/LT line and carriage to store centre Etah | Dismanteling of old/damage STP/RS Joist of HT/LT line and carriage to store centre Etah |
| 23 | Re-sagging of Dog/ Raccoon/ Rabbit conductor loose 33/HT/LT conductor after opening, binding, nozzling etc. | Re-sagging of Dog/ Raccoon/ Rabbit conductor loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 24 | Re-sagging of ACSR weasel conductor/ GI wire loose 33/HT/LT conductor after opening, binding, nozzling etc. | Re-sagging of ACSR weasel conductor/ GI wire loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 25 | Re-sagging of ABC 3X120+1X70+1X16 loose 33/HT/LT conductor after opening, binding, nozzling etc. | Re-sagging of ABC 3X120+1X70+1X16 loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 26 | Re-sagging of ABC 3x50/3X95 loose 33/HT/LT conductor after opening, binding, nozzling etc. | Re-sagging of ABC 3x50/3X95 loose 33/HT/LT conductor after opening, binding, nozzling etc. |
| 27 | Replacement of 11 KV cross arms V type broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 11 KV cross arms V type broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 28 | Replacement of 11 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 11 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 29 | Replacement of 11 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 11 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 30 | Replacement of 11 KV Disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 11 KV Disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 31 | Replacement of Cross Arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of Cross Arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 32 | Replacement of F Clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of F Clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 33 | Replacement of LT shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of LT shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 34 | Replacement of 33 KV cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 33 KV cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 35 | Replacement of 33 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 33 KV pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 36 | Replacement of 33 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. | Replacement of 33 KV pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing. |
| 37 | Retightening of Stay rod. Etc. complete. | Retightening of Stay rod. Etc. complete. |
| 38 | Providing fixing of stay rod with nuzzling etc. complete. | Providing fixing of stay rod with nuzzling etc. complete. |
| 39 | Earthing of PCC/RS Joist/STP as per RESPO norms. | Earthing of PCC/RS Joist/STP as per RESPO norms. |
| 40 | Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking. | Carriage of old material from pit site to JE store/store center, Etah in distance range 0 to 10 km including loading & unloading and proper stacking. |
| 41 | Mounting of 25/63 KVA T/F on double pole/Plinth including making of the connection etc complete. | Mounting of 25/63 KVA T/F on double pole/Plinth including making of the connection etc complete. |
| 42 | Mounting of 100 KVA T/F on double pole/Plinth including making of the connection etc complete. | Mounting of 100 KVA T/F on double pole/Plinth including making of the connection etc complete. |
| 43 | Chopping of tree branches | Chopping of tree branches |
| 44 | Repairing/ Resagging / new guarding of HT lines with GI wire as per RESPO norms | Repairing/ Resagging / new guarding of HT lines with GI wire as per RESPO norms |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.