Tender For Construction Of New Burial Ground At Arasanur Panchayat Ad Colony, Arasanur
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Nov 2026
4 days left
EMD
5000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ramanathapuram → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of New Burial Ground At Arasanur Panchayat Ad Colony, Arasanur
BOQ
| Sl. No. | Item Description |
| 1 | Name of Work: Construction of New Burial ground at Arasanur Panchayat AD Colony, Arasanur |
| 2 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay, stiff black cotton soil, shales, murrams, gravel and hard rock not requiring blasting as per SS 20B, including depositing on bank with initial lead and lift etc., complete. |
| 3 | Cement concrete 1:4:8 mix using 40 mm HBGS metal for foundation and flooring base including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 4 | Supplying and filling with carted sand in layers not more than 15 cm thick, well rammed, watered and compacted etc., complete. |
| 5 | Brick work in cement mortar 1:5 mix using country bricks of size 8¾\\" x 4¼\\" x 2¾\\" for basement, parapet and steps including cost and conveyance of all materials and curing etc., complete. |
| 6 | Reinforced cement concrete 1:1½:3 mix using 20 mm HBGS metal for footings, columns, grade beam, plinth beam, roof beam, roof slab and sunshade including cost and conveyance of all materials, mixing, laying and curing etc., complete. |
| 7 | Supplying, fabricating and placing in position mild steel / ribbed tor steel grills for RCC works including cost of steel and binding wire etc., complete. |
| 8 | Supplying and erecting centering for sides and soffits including necessary supports and strutting for plane surfaces such as RCC columns, beams, roof slab and sunshade etc., complete. |
| 9 | Weathering course in brick jelly lime concrete using 20 mm brick jelly and slaked lime over roof slab including cost and conveyance of all materials etc., complete. |
| 10 | Terrace finishing with one course of machine pressed tiles of size 23 x 23 x 2 cm laid in CM 1:3 with water proofing compound and the joints pointed with the same mortar etc., complete. |
| 11 | Providing granolithic floor finish 20 mm thick in CC 1:2:4 including cost and conveyance of all materials to site and labour charges for curing etc., complete. |
| 12 | Plastering with cement mortar 1:5 mix 12 mm thick for basement, parapet, columns and steps including cost and conveyance of all materials to site and labour charges for curing etc., complete. |
| 13 | Ceiling plastering with cement mortar 1:3 mix 10 mm thick for roof slab, sunshade and beams including cost and conveyance of all materials to site and labour charges for curing etc., complete. |
| 14 | Painting two coats of emulsion paint over a priming coat including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 15 | Refilling in foundation with excavated earth in layers not exceeding 15 cm, well rammed and consolidated etc., complete. |
| 16 | Supplying and filling basement with conveyed earth with a lead of 1 km in layers, well rammed, watered and consolidated etc., complete. |
| 17 | SUB-ESTIMATE – COMPOUND WALL |
| 18 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B. |
| 19 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete., |
| 20 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to site etc complete., |
| 21 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of etc complete., |
| 22 | Supplying and erecting centering for sides of RCC pillars including necessary supports, cost of materials and labour charges etc., complete. (above ground level) |
| 23 | Supplying and erecting centering for sides of RCC pillars including necessary supports, cost of materials and labour charges etc., complete. (below ground level) |
| 24 | Supply & fabrication of steel including its cost and labour charge etc complete |
| 25 | Plastering with cement mortar 1:5 12mm thick including cost & conveyance of all materials to work site etc complete., |
| 26 | Painting two coats of cement paint over one coat of cement primer with approved colour including cost and conveyance of all materials etc., complete. |
| 27 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents