Drinking Water Supply and Sanitation Government Departments Closing in 22 days TDR #58646516

Tender For G-Af-11-Pc-4S: Supply And Installation Of Porcupines In Four Subproject Areas (Dhemaji And Lakhimpur, Jorhat, Goalpara And Morigaon), Assam, India (Lot-2)

Issued by Government Departments · Goalpara, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Dec 2026
22 days left
EMD
27.50 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Goalpara → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for G-Af-11-Pc-4S: Supply And Installation Of Porcupines In Four Subproject Areas (Dhemaji And Lakhimpur, Jorhat, Goalpara And Morigaon), Assam, India (Lot-2) , Grand Total Of Schedule 1, Schedule 2 And Schedule 3 , Currency 1 - Inr , Currency 2 - Usd , Currency 3 - Eur , Currency 4 - Aud , Currency 5 - Gbp , Currency 6 - Jyp Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 1) - Price Schedule For Goods To Be Offered From Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 4: In Accordance With Margin Of Preference Itb 35, If Applicable. Domestic Value Added Comprises Domestic Labor, The Domestic Content Of Materials, Domestic Overheads, And Profits From The Stage Of Mining The Raw Material Until Final Assembly. Column 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Price Shall Include All Customs Duties And Sales And Other Taxes Already Paid Or Payable On The Components And Raw Materials Used In The Manufacturer Or Assembly Of The Item Or The Customs Duties And Sales And Other Taxes Already Paid On Previously Imported Items. Column 8: Payable In The PurchaserS Country If Contract Is Awarded. Item No. Description Country Of Origin Domestic Value Added In Percentage Quantity And Unit Of Measurement Unit Price Exw Total Exw Price Per Item Sales And Other Taxes Per Item Total Price Per Item Including Taxes Quantity Unit % Amount , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols Total Amount 0.0 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 2) - Price Schedule For Goods To Be Offered From Outside The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Column 6: Only To Be Used If The Purchase Wishes To Reserve Transportation And Insurance To Domestic Companies Or Other Designated Sorces. Identification Of Lowest Evaluated Bid Must Be On The Basis Of The Cif Or Cip Price, But The Purchaser May Sign The Contract On Fob Or Fca Terms And Make Its Own Arrangement For Transportation And / Or Insurance. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Cif / Cip Unit Price Fob / Fca Quoted Currency Total Price Cif / Cip Per Item Total Price Fob / Fca Per Item Quantity Unit , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Item No. 37 , Item No. 38 , Item No. 39 , Item No. 40 , Item No. 41 , Item No. 42 , Item No. 43 , Item No. 44 , Item No. 45 , Item No. 46 , Item No. 47 , Item No. 48 , Item No. 49 , Item No. 50 , Item No. 51 , Item No. 52 , Item No. 53 , Item No. 54 , Item No. 55 , Item No. 56 , Item No. 57 , Item No. 58 , Item No. 59 , Item No. 60 , Item No. 61 , Item No. 62 , Item No. 63 , Item No. 64 Total Amount Usd 0.0 0.0 Eur 0.0 0.0 Aud 0.0 0.0 Gbp 0.0 0.0 Jpy 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 3) - Price Schedule For Related To The Services To Be Offered From Outside And Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Currency In Accordance With Itb 15. Prices Are To Be Quoted Inclusive Of All Customs Duties, Sales, And Other Similar Taxes Applicable In The Purchasers Country And Payable On The Related Services, If The Contract Is Awarded To The Bidder. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Total Price Per Item Quantity Unit (A) Foreign Currency Quoted Foreign Curreny (B) Local Currency Quoted Local Curreny (A) Foreign Currency (B) Local Currency , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 5Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. , Construction Of Whole Bholuka Bamboo Double Screen With Ma-Tured Bholuka Bam-Boo Stacks 75Mm To 100Mm Dia., Placed At 30 Cm Clear Apart(I.E. 40 Cm C/C) Driven 4.00 M To 4.50M Below Ground And 3.0M To 3.50M Above Ground With Hydraulic Driv-Ing Equipment In-Cluding Hire Charge Of Equipment, Cost Of P.O.L. Etc. And Providing With 1 (One)Row Of Horizon-Tal Half Jati Bamboo Kamies Tied With Galvanised Wire Of 16 G To 18 G Etc. Complete As Di-Rected. , Location B: Under Dhubri W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10 Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Location C: Under Barpeta W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. Total Amount Inr 0.0 Usd 0.0 Eur 0.0 Aud 0.0 Gbp 0.0 Jpy 0.0

BOQ

Name of Work:- G-AF-11-PC-4S: Supply and Installation of Porcupines in four subproject areas (Dhemaji and Lakhimpur, Jorhat, Goalpara and Morigaon), Assam, India (Lot-2)
Sl. No. Item Description
1Grand Total of Schedule 1, Schedule 2 and Schedule 3
2Currency 1 - INR
3Currency 2 - USD
4Currency 3 - EUR
5Currency 4 - AUD
6Currency 5 - GBP
7Currency 6 - JYP Name of the Bidder : 0.0 IFB NO. WRD/ADB-P2/OCB-Goods/12 PRICE SCHEDULE (Schedule 1) - Price Schedule for Goods to Be offered from within the Purchaser’s Country (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) Notes Column 4: In accordance with margin of preference ITB 35, if applicable. Domestic Value Added comprises domestic labor, the domestic content of materials, domestic overheads, and profits from the stage of mining the raw material until final assembly. Column 6: Incoterms in accordance with ITB 14.Currency in accordance with ITB 15.Price shall include all customs duties and sales and other taxes already paid or payable on the components and raw materials used in the manufacturer or assembly of the item or the customs duties and sales and other taxes already paid on previously imported items. Column 8: Payable in the Purchaser’s country if Contract is awarded. Item No. Description Country of Origin Domestic Value Added in percentage Quantity and Unit of Measurement Unit PriceEXW Total EXW price per item Sales and other Taxesper Item Total Price per item Including Taxes Quantity Unit % Amount
8Supply and installation of Porcupines in Goalpara, Dhubri and Barpeta W.R. DivisionLocation A: Under Goalpara W.R. Division
9Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
11Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3
12Environmental Mitigation & Monitoring Measures
13Location A: Under Goalpara W.R. Division
14Obtaining and submission of copies to Engi-neer all consents, permits, clearanc-es, no objection clearances or NOCs, tree cut-ting permissions, and other relevant permits from vari-ous authorities before the start of construction
15Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
16Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construc-tion camps.
17Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of por-cupine
18Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian envi-ronment)
19Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
20Assessment of biodiversity with special empha-size on conservation of aquatic ecology and miti-gation measures
21PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
22Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 protocols
23Location B: Under Dhubri W.R. Division
24Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
25Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
26Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construction camps.
27Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of porcupine
28Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian environment)
29Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
30Assessment of biodiversity with special empha-size on conserva-tion of aquatic ecology and mitigation measures
31PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
32Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 pro-tocols
33Location C: Under Barpeta W.R. Division
34Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
35Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
36Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construction camps.
37Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of porcupine
38Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian environment)
39Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
40Assessment of biodiversity with special empha-size on conserva-tion of aquatic ecology and miti-gation measures
41PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
42Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 protocols Total Amount 0.0 0.0 0.0 Name of the Bidder : 0.0 IFB NO. PRICE SCHEDULE (Schedule 2) - Price Schedule for Goods to Be offered from Outside the Purchaser’s Country (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) Notes Column 5 and 6: Incoterms in accordance with ITB 14.Currency in accordance with ITB 15. Column 6: Only to be used if the Purchase wishes to reserve transportation and insurance to domestic companies or other designated sorces. Identification of lowest evaluated bid must be on the basis of the CIF or CIP price, but the Purchaser may sign the contract on FOB or FCA terms and make its own arrangement for transportation and / or insurance. Item No. Description Country of Origin Quantity and Unit of Measurement Unit PriceCIF / CIP Unit PriceFOB / FCA Quoted Currency Total Price CIF / CIP per item Total Price FOB / FCA per item Quantity Unit
43Supply and installation of Porcupines in Goalpara, Dhubri and Barpeta W.R. DivisionLocation A: Under Goalpara W.R. Division
44Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
45Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
46Cost of Supply of Pre-stressed Ce-ment Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete.The technical specifications are in Section 6.3
47Environmental Mitigation & Monitoring Measures
48Location A: Under Goalpara W.R. Division
49Obtaining and submission of copies to Engi-neer all consents, permits, clearanc-es, no objection clearances or NOCs, tree cut-ting permissions, and other relevant permits from vari-ous authorities before the start of construction
50Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
51Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construc-tion camps.
52Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of por-cupine
53Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian envi-ronment)
54Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
55Assessment of biodiversity with special empha-size on conservation of aquatic ecology and miti-gation measures
56PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
57Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 protocols
58Location B: Under Dhubri W.R. Division
59Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
60Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
61Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construction camps.
62Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of porcupine
63Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian environment)
64Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
65Assessment of biodiversity with special empha-size on conserva-tion of aquatic ecology and mitigation measures
66PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
67Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 pro-tocols
68Location C: Under Barpeta W.R. Division
69Obtaining and submission of copies to Engineer all consents, permits, clearances, no objection clearances or NOCs, tree cutting permissions, and other relevant permits from various authorities before the start of construction
70Disposal of exist-ing old geo-bags and other materi-als used as tem-porary anti-erosion and flood protec-tion measures, and disposal of all solid wastes dur-ing construction to designated loca-tions and/or use of local municipal services
71Provision of all requisite facilities (i.e. drinking water supply, sanitation, domestic solid waste collection & disposal, fuel supply etc.) at labour/ Construction camps.
72Air quality moni-toring for PM2.5, PM10, SO2, NOX, CO, Pb (considering use of motorized boats for porcu-pine installations) once during the installation of porcupine
73Noise levels moni-toring for Noise levels in dB (A) for day, night, L10, L90, Lmax, Lmin (Considering aquatic ecology of the riparian environment)
74Surface water quality monitoring for pH, BOD, COD, TDS, TSS, DO, Oil and grease and other physiochemical and biological parameters
75Assessment of biodiversity with special empha-size on conserva-tion of aquatic ecology and miti-gation measures
76PPE Kits for the labours consider-ing working condi-tion on deep waters using boats
77Awareness Camp/ Training for the labours on Envi-ronmental Safe-guard & Occupa-tional Health Safe-ty, COVID-19 protocols
78Item No. 37
79Item No. 38
80Item No. 39
81Item No. 40
82Item No. 41
83Item No. 42
84Item No. 43
85Item No. 44
86Item No. 45
87Item No. 46
88Item No. 47
89Item No. 48
90Item No. 49
91Item No. 50
92Item No. 51
93Item No. 52
94Item No. 53
95Item No. 54
96Item No. 55
97Item No. 56
98Item No. 57
99Item No. 58
100Item No. 59
101Item No. 60
102Item No. 61
103Item No. 62
104Item No. 63
105Item No. 64 Total Amount USD 0.0 0.0 EUR 0.0 0.0 AUD 0.0 0.0 GBP 0.0 0.0 JPY 0.0 0.0 Name of the Bidder : 0.0 IFB NO. WRD/ADB-P2/OCB-Goods/12 PRICE SCHEDULE (Schedule 3) - Price Schedule for Related to the Services to Be Offered from Outside and Within the Purchaser’s Country (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) Notes Column 5 and 6: Currency in accordance with ITB 15.Prices are to be quoted inclusive of all customs duties, sales, and other similar taxes applicable in the Purchaser's country and payable on the Related Services, if the Contract is awarded to the bidder. Item No. Description Country of Origin Quantity and Unit of Measurement Unit Price Total Price per Item Quantity Unit (a)Foreign Currency Quoted Foreign Curreny (b)Local Currency Quoted Local Curreny (a)Foreign Currency (b)Local Currency
106Supply and installation of Porcupines in Goalpara, Dhubri and Barpeta W.R. DivisionLocation A: Under Goalpara W.R. Division
107Transport of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Manufacturing unit to Stack yard as mentioned at Section 2, ITB 14.6 (b)(i) including in-surance, loading and unloading etc.
108Carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from Stack yard to Work Site including loading, unloading & stackingDistance from Divi-sional Store to Work Site = 5KM
109Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching without boat
110Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. Nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching with boat
111Cost of earthwork in bank trimming to the designed sec-tion /slope by man-ual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.
112Construction of whole Bholuka Bamboo double Screen with ma-tured Bholuka Bam-boo stacks 75mm to 100mm dia., placed at 30 cm clear apart(i.e. 40 cm C/C) driven 4.00 m to 4.50m below ground and 3.0m to 3.50m above ground with hydraulic driv-ing equipment in-cluding hire charge of equipment, cost of P.O.L. etc. and providing with 1 (One)row of horizon-tal half Jati bamboo kamies tied with galvanised wire of 16 G to 18 G etc. complete as di-rected.
113Location B: Under Dhubri W.R. Division
114Transport of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Manufacturing unit to Stack yard as mentioned at Section 2, ITB 14.6 (b)(i) including in-surance, loading and unloading etc.
115Carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from Stack yard to Work Site including loading, unloading & stackingDistance from Divi-sional Store to Work Site = 10 KM
116Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching without boat
117Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. Nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching with boat
118Location C: Under Barpeta W.R. Division
119Transport of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Manufacturing unit to Stack yard as mentioned at Section 2, ITB 14.6 (b)(i) including in-surance, loading and unloading etc
120Carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from Stack yard to Work Site including loading, unloading & stackingDistance from Divi-sional Store to Work Site = 10KM
121Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching without boat
122Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) mem-bers properly, sup-ply & fitting/fixing with 12 mm dia. 25 Cm long M.S. Nuts and bolts and launching the por-cupine properly as directed. (Lead up to 150 m) Launching with boat
123Cost of earthwork in bank trimming to the designed sec-tion /slope by man-ual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed. Total Amount INR 0.0 USD 0.0 EUR 0.0 AUD 0.0 GBP 0.0 JPY 0.0 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58646516
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 18-12-2026
Authority
Authority Name Water Resources Department
Work Description Tender for G-Af-11-Pc-4S: Supply And Installation Of Porcupines In Four Subproject Areas (Dhemaji And Lakhimpur, Jorhat, Goalpara And Morigaon), Assam, India (Lot-2) , Grand Total Of Schedule 1, Schedule 2 And Schedule 3 , Currency 1 - Inr , Currency 2 - Usd , Currency 3 - Eur , Currency 4 - Aud , Currency 5 - Gbp , Currency 6 - Jyp Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 1) - Price Schedule For Goods To Be Offered From Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 4: In Accordance With Margin Of Preference Itb 35, If Applicable. Domestic Value Added Comprises Domestic Labor, The Domestic Content Of Materials, Domestic Overheads, And Profits From The Stage Of Mining The Raw Material Until Final Assembly. Column 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Price Shall Include All Customs Duties And Sales And Other Taxes Already Paid Or Payable On The Components And Raw Materials Used In The Manufacturer Or Assembly Of The Item Or The Customs Duties And Sales And Other Taxes Already Paid On Previously Imported Items. Column 8: Payable In The PurchaserS Country If Contract Is Awarded. Item No. Description Country Of Origin Domestic Value Added In Percentage Quantity And Unit Of Measurement Unit Price Exw Total Exw Price Per Item Sales And Other Taxes Per Item Total Price Per Item Including Taxes Quantity Unit % Amount , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols Total Amount 0.0 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 2) - Price Schedule For Goods To Be Offered From Outside The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Column 6: Only To Be Used If The Purchase Wishes To Reserve Transportation And Insurance To Domestic Companies Or Other Designated Sorces. Identification Of Lowest Evaluated Bid Must Be On The Basis Of The Cif Or Cip Price, But The Purchaser May Sign The Contract On Fob Or Fca Terms And Make Its Own Arrangement For Transportation And / Or Insurance. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Cif / Cip Unit Price Fob / Fca Quoted Currency Total Price Cif / Cip Per Item Total Price Fob / Fca Per Item Quantity Unit , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Item No. 37 , Item No. 38 , Item No. 39 , Item No. 40 , Item No. 41 , Item No. 42 , Item No. 43 , Item No. 44 , Item No. 45 , Item No. 46 , Item No. 47 , Item No. 48 , Item No. 49 , Item No. 50 , Item No. 51 , Item No. 52 , Item No. 53 , Item No. 54 , Item No. 55 , Item No. 56 , Item No. 57 , Item No. 58 , Item No. 59 , Item No. 60 , Item No. 61 , Item No. 62 , Item No. 63 , Item No. 64 Total Amount Usd 0.0 0.0 Eur 0.0 0.0 Aud 0.0 0.0 Gbp 0.0 0.0 Jpy 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 3) - Price Schedule For Related To The Services To Be Offered From Outside And Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Currency In Accordance With Itb 15. Prices Are To Be Quoted Inclusive Of All Customs Duties, Sales, And Other Similar Taxes Applicable In The Purchasers Country And Payable On The Related Services, If The Contract Is Awarded To The Bidder. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Total Price Per Item Quantity Unit (A) Foreign Currency Quoted Foreign Curreny (B) Local Currency Quoted Local Curreny (A) Foreign Currency (B) Local Currency , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 5Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. , Construction Of Whole Bholuka Bamboo Double Screen With Ma-Tured Bholuka Bam-Boo Stacks 75Mm To 100Mm Dia., Placed At 30 Cm Clear Apart(I.E. 40 Cm C/C) Driven 4.00 M To 4.50M Below Ground And 3.0M To 3.50M Above Ground With Hydraulic Driv-Ing Equipment In-Cluding Hire Charge Of Equipment, Cost Of P.O.L. Etc. And Providing With 1 (One)Row Of Horizon-Tal Half Jati Bamboo Kamies Tied With Galvanised Wire Of 16 G To 18 G Etc. Complete As Di-Rected. , Location B: Under Dhubri W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10 Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Location C: Under Barpeta W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. Total Amount Inr 0.0 Usd 0.0 Eur 0.0 Aud 0.0 Gbp 0.0 Jpy 0.0
Basic Detail
Tender No WRD/ADB-P2/OCB-Goods/12
Bidding Type Tender
Location
City Goalpara
State Assam
Key Dates
Publish Date 20 Nov 2026
Submission Date 18 Dec 2026
Open Date 18 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 27.50 Lakhs
Exemption Available
Document List
624b0b10-1f68-4c78-a3b0-cb522d451132.html
Annexure_A_EMP_Porcupine.pdf
Bid_Porcupine_lot_2.pdf
BOQ_86269.xls
Price_Bid_Porcupine_Lot_2.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 22 days
Dec 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
html

624b0b10-1f68-4c78-a3b0-cb522d451132.html

pdf

Annexure_A_EMP_Porcupine.pdf

pdf

Bid_Porcupine_lot_2.pdf

xls

BOQ_86269.xls

pdf

Price_Bid_Porcupine_Lot_2.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender