Tender For Shifting Of Subdstations, 11Kv Lines And Lt Lines For Improvement And Widening Of Road From Jagamara To Nh-16 (Ch.0/000 To Ch.0/780Km).
Tender Value
74.79 Lakhs
Estimated cost
Bid Submission
05 Dec 2026
13 days left
EMD
74796
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Subdstations, 11Kv Lines And Lt Lines For Improvement And Widening Of Road From Jagamara To Nh-16 (Ch.0/000 To Ch.0/780Km).
BOQ
| Sl. No. | Item Description |
| 1 | PART A1: Installation of 2 Nos 11 KV DP with AB switch (Part A-1)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART A1 |
| 2 | GI Channel, angle & flat of different size PART A1 |
| 3 | DMC Insulator for LA (70/10) PART A1 |
| 4 | Danger Plate PART A1 |
| 5 | H.T. Stay clamp PART A1 |
| 6 | H.T. Stay set (Complete ) PART A1 |
| 7 | H.T. Stay Insulator Type-C PART A1 |
| 8 | 7/10 SWG Stay Wire PART A1 |
| 9 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART A1 |
| 10 | GI barbed wire anticlimbing device PART A1 |
| 11 | Lightning Arrester(12KV,10KA) (Station Class,class-2) PART A1 |
| 12 | AB Switch (11KV,400A.3pole,50Hz) PART A1 |
| 13 | 11 KV pin insulator polymer PART A1 |
| 14 | NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A1 |
| 15 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A1 |
| 16 | Dead end assembly with accessories for 100 Sq.mm. AAAC PART A1 |
| 17 | Disc insulator (B&S) 70 KN polymer PART A1 |
| 18 | GI Nut , Bolt & Washer of different sizes PART A1 |
| 19 | 2. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART A1 |
| 20 | Concreting of Pole @ 1:1.5:3(M-20 Grade) PART A1 |
| 21 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART A1 |
| 22 | Construction of Earthing chamber incuding earthing pipe and civil works PART A1 |
| 23 | GIS Mapping, indexing/numbering of Poles PART A1 |
| 24 | Painting of Pole in Black & Yellow strips/Zebra PART A1 |
| 25 | PART A2: 11 KV cut points with 180 degree angle, 2 Nos (Part A-2)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A2 |
| 26 | GI Channel, angle & flat of different size PART A2 |
| 27 | Danger Plate PART A2 |
| 28 | H.T. Stay clamp PART A2 |
| 29 | H.T. Stay set (Complete ) PART A2 |
| 30 | H.T. Stay Insulator Type-C PART A2 |
| 31 | 7/10 SWG Stay Wire PART A2 |
| 32 | GI barbed wire anticlimbing device PART A2 |
| 33 | 11 KV pin insulator polymer PART A2 |
| 34 | NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A2 |
| 35 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A2 |
| 36 | Dead end assembly with accessories for 100 Sq.mm. AAAC PART A2 |
| 37 | Disc insulator (B&S) 70 KN polymer PART A2 |
| 38 | Earthing of Support ( Coil Type ) PART A2 |
| 39 | GI Nut , Bolt & Washer of different sizes PART A2 |
| 40 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART A2 |
| 41 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART A2 |
| 42 | Fixing of complete Stay Set with all accessories and civil works PART A2 |
| 43 | GIS Mapping, indexing/numbering of Poles PART A2 |
| 44 | Painting of Pole in Black & Yellow strips/Zebra PART A2 |
| 45 | PART A3: 11 KV cut points with 90 degree angle, 12 Nos (Part A-3)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A3 |
| 46 | WPB (GI) Pole 160x152 - 13 Mtr. long for SP PART A3 |
| 47 | GI Channel, angle & flat of different size PART A3 |
| 48 | Danger Plate PART A3 |
| 49 | GI barbed wire anticlimbing device PART A3 |
| 50 | 11 KV pin insulator polymer PART A3 |
| 51 | NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A3 |
| 52 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A3 |
| 53 | Dead end assembly with accessories for 100 Sq.mm. AAAC PART A3 |
| 54 | Disc insulator (B&S) 70 KN polymer PART A3 |
| 55 | Earthing of Support ( Coil Type ) PART A3 |
| 56 | H.T. Stay clamp PART A3 |
| 57 | H.T. Stay set (Complete ) PART A3 |
| 58 | H.T. Stay Insulator Type-C PART A3 |
| 59 | 7/10 SWG Stay Wire PART A3 |
| 60 | GI Nut , Bolt & Washer of different sizes PART A3 |
| 61 | 2. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART A3 |
| 62 | Concreting of Pole @ 1:1.5:3(M-20 Grade) PART A3 |
| 63 | Fixing of complete Stay Set with all accessories and civil works PART A3 |
| 64 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART A3 |
| 65 | GIS Mapping, indexing/numbering of Poles PART A3 |
| 66 | Painting of Pole in Black & Yellow strips/Zebra PART A3 |
| 67 | PART A4: Construction of 0.83 Km 11 KV OH line with 100 sq.mm AAA XLPE covered conductor, 40 Mtr span, 11 Mtr WPB pin points (Part A-4)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A4 |
| 68 | 11 KV V cross Arm(GI) PART A4 |
| 69 | Top bracket 100x50X6 mm GI Channel(GI) PART A4 |
| 70 | Danger Plate PART A4 |
| 71 | Back Clamp for danger Plate and barbed wire PART A4 |
| 72 | GI barbed wire anticlimbing device PART A4 |
| 73 | 11 KV pin insulator polymer PART A4 |
| 74 | NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A4 |
| 75 | Spike (GI ) ( 2 Nos of spike per Set in each Pole ) PART A4 |
| 76 | Earthing of Support ( Coil Type ) PART A4 |
| 77 | GI Nut , Bolt & Washer of different sizes PART A4 |
| 78 | 100 SQ.MM. AAAC XLPE Covered Conductor-11kV PART A4 |
| 79 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART A4 |
| 80 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART A4 |
| 81 | GIS Mapping, indexing/numbering of Poles PART A4 |
| 82 | Painting of Pole in Black & Yellow strips/Zebra PART A4 |
| 83 | GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART A4 |
| 84 | PART B: Construction of LT AB cable 740 Mtr using 4Cx95 (P)+1Cx95 (M)+1Cx16 (street light) sq.mm, 33 Mtr span, 9 Mtr PSC poles1. Supply of materials9 Mtr. long PSC Pole PART B |
| 85 | GI flat for danger plate and anticlimbing device PART B |
| 86 | LT Stay set Complete PART B |
| 87 | 7/12 SWG GI stay wire, Grade -2 PART B |
| 88 | LT stay Clamp PART B |
| 89 | LT Stay insulator PART B |
| 90 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) PART B |
| 91 | EYE hook for XLPE Aerial bunched Cable PART B |
| 92 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable PART B |
| 93 | Suspension Clamp with EYE hook for ABC PART B |
| 94 | 4C×95 mm² (P)+1C×95 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) PART B |
| 95 | 10 WAY LT SERVICE Distb.Box PART B |
| 96 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm PART B |
| 97 | GI Pipe Earthing (each 5th pole to earth) PART B |
| 98 | Coil Earthing PART B |
| 99 | Danger plate (LT) PART B |
| 100 | GI barbed wire anticlimbing device PART B |
| 101 | GI Nut , Bolt & Washer of different sizes PART B |
| 102 | 2. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART B |
| 103 | Concreting of Pole @ 1:1.5:3(M-20 Grade) PART B |
| 104 | Construction of Earthing chamber incuding earthing pipe and civil works PART B |
| 105 | Painting of Pole in Black & Yellow strips/Zebra PART B |
| 106 | GIS Mapping, indexing/numbering of Poles PART B |
| 107 | GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART B |
| 108 | PART C: Supply and laying of 11 KV UG cable 40 Mtr using 3Cx300 sq.mm XLPE UG cable with 1 run spare1. Supply of materialsSupply of 11kV 3C 300 sqmm Aluminium XLPE insulation armoured UG cable (SC rating 28.3 kA, armour 15 kA) - 40 M with 1 run spare PART C |
| 109 | Supply of outdoor termination kits heat shrinkable type for 11kV 3C 300 sqmm HT UG cable PART C |
| 110 | Supply of HDPE pipe 160 mm diameter, PE 80-PN8 for laying of 11kV UG cable PART C |
| 111 | 2. Civil, erection & survey worksLaying, commissioning & testing of 11kV 3C 300 sqmm XLPE (extruded) UG cable by open trench method PART C |
| 112 | Erection of straight through jointing / outdoor / indoor termination kits heat shrinkable type for 11kV 3C 300 sqmm aluminium UG cable PART C |
| 113 | Laying of 160 mm dia PE 80-PN8 HDPE pipe inside open trench PART C |
| 114 | Earth work excavation of soil (1 Mtr width x 1.2 Mtr depth) - route length 25 M PART C |
| 115 | Earth work excavation of hard rock (1 Mtr width x 1.2 Mtr depth) - route length 25 M PART C |
| 116 | Back filling with excavated soil outside and above the trench PART C |
| 117 | Road repair and restoration charges PART C |
| 118 | Supply and erection of cable route marker along the cable route at an interval of 30 Mtrs with civil works PART C |
| 119 | GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART C |
| 120 | PART D: Installation of 1 No DP with AB switch & LA for HT metering unit1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART D |
| 121 | GI Channel, angle & flat of different size PART D |
| 122 | DMC Insulator for LA (70/10) PART D |
| 123 | Danger Plate, 2 no's. PART D |
| 124 | 55 SQ.MM. AAAC XLPE Covered Conductor PART D |
| 125 | H.T. Stay clamp PART D |
| 126 | H.T. Stay set (Complete ) PART D |
| 127 | H.T. Stay Insulator Type-C PART D |
| 128 | 7/10 SWG Stay Wire PART D |
| 129 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART D |
| 130 | GI barbed wire anticlimbing device PART D |
| 131 | Lightning Arrester(12KV,10KA) (Station Class,class-2) PART D |
| 132 | AB Switch (11KV,200A.3pole,50Hz) PART D |
| 133 | H W fitting(B&S) 70KN, 3Bolt PART D |
| 134 | Disc insulator (B&S) 70 KN polymer PART D |
| 135 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11 kV PART D |
| 136 | GI Nut , Bolt & Washer of different sizes PART D |
| 137 | POLYCARBONATE BIRD GUARD PART D |
| 138 | DO.Fuse( 11KV.200A.3Pole) PART D |
| 139 | 20 AMP Fuse Link PART D |
| 140 | 2. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART D |
| 141 | Concreting of Pole @ 1:1.5:3(M-20 Grade) PART D |
| 142 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART D |
| 143 | Construction of Earthing chamber incuding earthing pipe and civil works PART D |
| 144 | GIS coordinate mapping, drawing preparation and submission of the same for PART D |
| 145 | Painting of Pole in Black & Yellow strips/Zebra PART D |
| 146 | PCC ratio 1:3:6(M-10 Grade) For DSS Area PART D |
| 147 | Supplying, Laying, spreading and compacting with hand roller stone PART D |
| 148 | GI chain link fencing for DSS PART D |
| 149 | PART E: Installation of 11/0.4 KV, 25 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART E |
| 150 | GI Channel, angle & flat of different size PART E |
| 151 | LT Distribution Box for 25 KVA S/S PART E |
| 152 | 55 SQ.MM. AAAC XLPE Covered Conductor PART E |
| 153 | 4 Cx 50 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. PART E |
| 154 | HDPE pipe of 110 mm diameter, PE 80- PN8 PART E |
| 155 | AB Switch(11KV,200A.3pole,50Hz) PART E |
| 156 | DO.Fuse( 11KV.200A.3Pole) PART E |
| 157 | 2.5 AMP Fuse Link PART E |
| 158 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART E |
| 159 | POLYCARBONATE BIRD GUARD PART E |
| 160 | Disc insulator (B&S)70 KN polymer PART E |
| 161 | H W fitting (B&S)70KN(3bolted) PART E |
| 162 | Lightning Arrester(12KV,10KA) Station Class 2 PART E |
| 163 | DMC Insulator for LA (70/10) PART E |
| 164 | HT stay set complete PART E |
| 165 | HT stay Clamp PART E |
| 166 | HT stay insulator TYPE-C PART E |
| 167 | 7/10 SWG GI stay wire, Grade -2 PART E |
| 168 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART E |
| 169 | GI Nuts & Bolts of Assorted size PART E |
| 170 | GI Barbed wire/Anticlimbing device PART E |
| 171 | Danger plate 11kv PART E |
| 172 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART E |
| 173 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART E |
| 174 | PCC ratio 1:3:6(M-10 Grade) For DSS Area PART E |
| 175 | Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART E |
| 176 | Fixing of HT complete Stay Set with all accessories and civil works PART E |
| 177 | Fixing of LT complete Stay Set with all accessories and civil works PART E |
| 178 | Construction of Earthing chamber incuding earthing pipe and civil works PART E |
| 179 | LTDB Plinth PART E |
| 180 | Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART E |
| 181 | Laying of 4 Cx 50 mm2 LT XLPE Cable PART E |
| 182 | Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART E |
| 183 | SITC of Aluminium Lugs suitable for 50 sq mm cable/conductor PART E |
| 184 | SITC of termination kit of 1.1kV 3.5C/4C 35-120 sqmm PART E |
| 185 | SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm PART E |
| 186 | Earth work excavation of soil PART E |
| 187 | Earth work excavation of hard rock PART E |
| 188 | Back filling with excavated soil outside and above the trench PART E |
| 189 | Painting of Pole in Black & Yellow strips/Zebra PART E |
| 190 | GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART E |
| 191 | SITC of DCP Extinguisher (6KG) PART E |
| 192 | SITC Display Board/Sign Board PART E |
| 193 | GI chain link fencing for DSS PART E |
| 194 | PART F: Installation of 11/0.4 KV, 63 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART F |
| 195 | GI Channel, angle & flat of different size PART F |
| 196 | LT Distribution Box for 63 KVA S/S PART F |
| 197 | 55 SQ.MM. AAAC XLPE Covered Conductor PART F |
| 198 | 4 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. PART F |
| 199 | HDPE pipe of 110 mm diameter, PE 80- PN8 PART F |
| 200 | AB Switch(11KV,200A.3pole,50Hz) PART F |
| 201 | DO.Fuse( 11KV.200A.3Pole) PART F |
| 202 | 10 AMP Fuse Link PART F |
| 203 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART F |
| 204 | POLYCARBONATE BIRD GUARD PART F |
| 205 | Disc insulator (B&S)70 KN polymer PART F |
| 206 | H W fitting (B&S)70KN(3bolted) PART F |
| 207 | Lightning Arrester(12KV,10KA) Station Class 2 PART F |
| 208 | DMC Insulator for LA (70/10) PART F |
| 209 | HT stay set complete PART F |
| 210 | HT stay Clamp PART F |
| 211 | HT stay insulator TYPE-C PART F |
| 212 | 7/10 SWG GI stay wire, Grade -2 PART F |
| 213 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART F |
| 214 | GI Nuts & Bolts of Assorted size PART F |
| 215 | GI Barbed wire/Anticlimbing device PART F |
| 216 | Danger plate 11kv PART F |
| 217 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART F |
| 218 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART F |
| 219 | PCC ratio 1:3:6(M-10 Grade) For DSS Area PART F |
| 220 | Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART F |
| 221 | Fixing of HT complete Stay Set with all accessories and civil works PART F |
| 222 | Fixing of LT complete Stay Set with all accessories and civil works PART F |
| 223 | Construction of Earthing chamber incuding earthing pipe and civil works PART F |
| 224 | LTDB Plinth PART F |
| 225 | Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART F |
| 226 | Laying of 4 Cx 95 mm2 LT XLPE Cable PART F |
| 227 | Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART F |
| 228 | SITC of Aluminium Lugs suitable for 95 sq mm cable/conductor PART F |
| 229 | SITC of termination kit of 1.1kV 3.5C/4C 35-120 sqmm PART F |
| 230 | SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm PART F |
| 231 | Earth work excavation of soil PART F |
| 232 | Earth work excavation of hard rock PART F |
| 233 | Back filling with excavated soil outside and above the trench PART F |
| 234 | Painting of Pole in Black & Yellow strips/Zebra PART F |
| 235 | GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART F |
| 236 | SITC of DCP Extinguisher (6KG) PART F |
| 237 | SITC Display Board/Sign Board PART F |
| 238 | GI chain link fencing for DSS PART F |
| 239 | PART G: Installation of 6 Nos 11/0.4 KV, 100 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART G |
| 240 | GI Channel, angle & flat of different size PART G |
| 241 | LT Distribution Box for 100 KVA S/S PART G |
| 242 | 55 SQ.MM. AAAC XLPE Covered Conductor PART G |
| 243 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. PART G |
| 244 | HDPE pipe of 110 mm diameter, PE 80- PN8 PART G |
| 245 | AB Switch(11KV,200A.3pole,50Hz) PART G |
| 246 | DO.Fuse( 11KV.200A.3Pole) PART G |
| 247 | 10 AMP Fuse Link PART G |
| 248 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART G |
| 249 | POLYCARBONATE BIRD GUARD PART G |
| 250 | Disc insulator (B&S)70 KN polymer PART G |
| 251 | H W fitting (B&S)70KN(3bolted) PART G |
| 252 | Lightning Arrester(12KV,10KA) Station Class 2 PART G |
| 253 | DMC Insulator for LA (70/10) PART G |
| 254 | HT stay set complete PART G |
| 255 | HT stay Clamp PART G |
| 256 | HT stay insulator TYPE-C PART G |
| 257 | 7/10 SWG GI stay wire, Grade -2 PART G |
| 258 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART G |
| 259 | GI Nuts & Bolts of Assorted size PART G |
| 260 | GI Barbed wire/Anticlimbing device PART G |
| 261 | Danger plate 11kv PART G |
| 262 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART G |
| 263 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART G |
| 264 | PCC ratio 1:3:6(M-10 Grade) For DSS Area PART G |
| 265 | Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART G |
| 266 | Fixing of HT complete Stay Set with all accessories and civil works PART G |
| 267 | Fixing of LT complete Stay Set with all accessories and civil works PART G |
| 268 | Construction of Earthing chamber incuding earthing pipe and civil works PART G |
| 269 | LTDB Plinth PART G |
| 270 | Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART G |
| 271 | Laying of 4 Cx 150 mm2 LT XLPE Cable PART G |
| 272 | Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART G |
| 273 | SITC of Aluminium Lugs suitable for 150 sq mm cable/conductor PART G |
| 274 | SITC of termination kit of 1.1kV 3.5C/4C 150-240 sqmm PART G |
| 275 | SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm PART G |
| 276 | Earth work excavation of soil PART G |
| 277 | Earth work excavation of hard rock PART G |
| 278 | Back filling with excavated soil outside and above the trench PART G |
| 279 | Painting of Pole in Black & Yellow strips/Zebra PART G |
| 280 | GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART G |
| 281 | SITC of DCP Extinguisher (6KG) PART G |
| 282 | SITC Display Board/Sign Board PART G |
| 283 | GI chain link fencing for DSS PART G |
| 284 | PART H: Installation of 11/0.4 KV, 250 KVA plinth mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART H |
| 285 | GI Channel, angle & flat of different size PART H |
| 286 | LT Distribution Box for 250 KVA S/S PART H |
| 287 | 55 SQ.MM. AAAC XLPE Covered Conductor PART H |
| 288 | 1 Cx 630 mm2 LT XLPE Cable(Un-Armoured) PART H |
| 289 | 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable PART H |
| 290 | HDPE pipe of 110 mm diameter, PE 80- PN8 PART H |
| 291 | AB Switch(11KV,200A.3pole,50Hz) PART H |
| 292 | DO.Fuse( 11KV.200A.3Pole) PART H |
| 293 | 20 AMP Fuse Link PART H |
| 294 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART H |
| 295 | POLYCARBONATE BIRD GUARD PART H |
| 296 | Disc insulator (B&S)70 KN polymer PART H |
| 297 | H W fitting (B&S)70KN(3bolted) PART H |
| 298 | Lightning Arrester(12KV,10KA) Station Class 2 PART H |
| 299 | DMC Insulator for LA (70/10) PART H |
| 300 | HT stay set complete PART H |
| 301 | HT stay Clamp PART H |
| 302 | HT stay insulator TYPE-C PART H |
| 303 | 7/10 SWG GI stay wire, Grade -2 PART H |
| 304 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART H |
| 305 | GI Nuts & Bolts of Assorted size PART H |
| 306 | GI Barbed wire/Anticlimbing device PART H |
| 307 | Danger plate 11kv PART H |
| 308 | 2. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART H |
| 309 | Couping of Pole @ 1:1.5:3(M-20 Grade) PART H |
| 310 | PCC ratio 1:3:6(M-10 Grade) For DSS Area PART H |
| 311 | Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART H |
| 312 | Fixing of HT complete Stay Set with all accessories and civil works PART H |
| 313 | Fixing of LT complete Stay Set with all accessories and civil works PART H |
| 314 | Construction of Earthing chamber incuding earthing pipe and civil works PART H |
| 315 | LTDB Plinth PART H |
| 316 | DTR Plinth PART H |
| 317 | Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART H |
| 318 | Laying of 1.1kV cable from 400 to 1000sqmm PART H |
| 319 | SITC of Aluminium Lugs suitable for 630 sq mm cable/conductor PART H |
| 320 | SITC of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm PART H |
| 321 | Earth work excavation of soil PART H |
| 322 | Earth work excavation of hard rock PART H |
| 323 | Back filling with excavated soil outside and above the trench PART H |
| 324 | Painting of Pole in Black & Yellow strips/Zebra PART H |
| 325 | GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART H |
| 326 | SITC of DCP Extinguisher (6KG) PART H |
| 327 | SITC Display Board/Sign Board PART H |
| 328 | GI chain link fencing for DSS PART H |
| 329 | PART I: Construction of 3 Nos 30 Mtr 11 KV line protecting guarding for road crossing1. Supply of materialsGI Channel, angle & flat of different size PART I |
| 330 | No-10 GI wire for lacing PART I |
| 331 | No-8 GI wire for guard wire PART I |
| 332 | Gi Pipe Earthing 40mm. 3 Mtr. Long PART I |
| 333 | 2. Civil, erection & survey worksConstruction of Earthing chamber incuding earthing pipe and civil works PART I |
| 334 | PART J: Dismantling of materials1. Dismantling worksDismantling of 11/13 Mtr. Joist/WPB Pole - 150X150 mm / 160X160 mm PART J |
| 335 | Dismantling / Removal of V Cross arm from pole PART J |
| 336 | Dismantling of 11kV Pin Insulator with Pin PART J |
| 337 | Dismantling of 11kV Disc Insulator with Hardware PART J |
| 338 | Dismantling / Removal of MS Channel from Double Pole Structure / pole PART J |
| 339 | Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 25 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J |
| 340 | Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 63 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J |
| 341 | Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer below 100 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J |
| 342 | Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 250 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J |
| 343 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line PART J |
| 344 | Dismantling of various size of LT AB Cable PART J |
| 345 | Dismantling of 11 kV / 33 kV GO/AB Switch/Isolator/DD fuse/fuse set PART JN:B: Salvage value to be deducted from the contracto's bill. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender