Housing Urban and Rular Development Government Departments Closing in 13 days TDR #58645952

Tender For Shifting Of Subdstations, 11Kv Lines And Lt Lines For Improvement And Widening Of Road From Jagamara To Nh-16 (Ch.0/000 To Ch.0/780Km).

Issued by Government Departments · Khordha, Odisha
Tender Value
74.79 Lakhs
Estimated cost
Bid Submission
05 Dec 2026
13 days left
EMD
74796
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Shifting Of Subdstations, 11Kv Lines And Lt Lines For Improvement And Widening Of Road From Jagamara To Nh-16 (Ch.0/000 To Ch.0/780Km).

BOQ

Name of Work:- Shifting of Subdstations, 11kv lines and LT lines for improvement and widening of Road from Jagamara to NH-16 (Ch.0/000 to Ch.0/780km).
Sl. No. Item Description
1PART A1: Installation of 2 Nos 11 KV DP with AB switch (Part A-1)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART A1
2GI Channel, angle & flat of different size PART A1
3DMC Insulator for LA (70/10) PART A1
4Danger Plate PART A1
5H.T. Stay clamp PART A1
6H.T. Stay set (Complete ) PART A1
7H.T. Stay Insulator Type-C PART A1
87/10 SWG Stay Wire PART A1
9Gi Pipe Earthing 40mm. 3 Mtr. Long PART A1
10GI barbed wire anticlimbing device PART A1
11Lightning Arrester(12KV,10KA) (Station Class,class-2) PART A1
12AB Switch (11KV,400A.3pole,50Hz) PART A1
1311 KV pin insulator polymer PART A1
14NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A1
15IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A1
16Dead end assembly with accessories for 100 Sq.mm. AAAC PART A1
17Disc insulator (B&S) 70 KN polymer PART A1
18GI Nut , Bolt & Washer of different sizes PART A1
192. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART A1
20Concreting of Pole @ 1:1.5:3(M-20 Grade) PART A1
21Couping of Pole @ 1:1.5:3(M-20 Grade) PART A1
22Construction of Earthing chamber incuding earthing pipe and civil works PART A1
23GIS Mapping, indexing/numbering of Poles PART A1
24Painting of Pole in Black & Yellow strips/Zebra PART A1
25PART A2: 11 KV cut points with 180 degree angle, 2 Nos (Part A-2)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A2
26GI Channel, angle & flat of different size PART A2
27Danger Plate PART A2
28H.T. Stay clamp PART A2
29H.T. Stay set (Complete ) PART A2
30H.T. Stay Insulator Type-C PART A2
317/10 SWG Stay Wire PART A2
32GI barbed wire anticlimbing device PART A2
3311 KV pin insulator polymer PART A2
34NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A2
35IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A2
36Dead end assembly with accessories for 100 Sq.mm. AAAC PART A2
37Disc insulator (B&S) 70 KN polymer PART A2
38Earthing of Support ( Coil Type ) PART A2
39GI Nut , Bolt & Washer of different sizes PART A2
402. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART A2
41Couping of Pole @ 1:1.5:3(M-20 Grade) PART A2
42Fixing of complete Stay Set with all accessories and civil works PART A2
43GIS Mapping, indexing/numbering of Poles PART A2
44Painting of Pole in Black & Yellow strips/Zebra PART A2
45PART A3: 11 KV cut points with 90 degree angle, 12 Nos (Part A-3)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A3
46WPB (GI) Pole 160x152 - 13 Mtr. long for SP PART A3
47GI Channel, angle & flat of different size PART A3
48Danger Plate PART A3
49GI barbed wire anticlimbing device PART A3
5011 KV pin insulator polymer PART A3
51NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A3
52IPC for 100 sq.mm AAA conductor (For covered conductor)-11 kV PART A3
53Dead end assembly with accessories for 100 Sq.mm. AAAC PART A3
54Disc insulator (B&S) 70 KN polymer PART A3
55Earthing of Support ( Coil Type ) PART A3
56H.T. Stay clamp PART A3
57H.T. Stay set (Complete ) PART A3
58H.T. Stay Insulator Type-C PART A3
597/10 SWG Stay Wire PART A3
60GI Nut , Bolt & Washer of different sizes PART A3
612. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART A3
62Concreting of Pole @ 1:1.5:3(M-20 Grade) PART A3
63Fixing of complete Stay Set with all accessories and civil works PART A3
64Couping of Pole @ 1:1.5:3(M-20 Grade) PART A3
65GIS Mapping, indexing/numbering of Poles PART A3
66Painting of Pole in Black & Yellow strips/Zebra PART A3
67PART A4: Construction of 0.83 Km 11 KV OH line with 100 sq.mm AAA XLPE covered conductor, 40 Mtr span, 11 Mtr WPB pin points (Part A-4)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for SP PART A4
6811 KV V cross Arm(GI) PART A4
69Top bracket 100x50X6 mm GI Channel(GI) PART A4
70Danger Plate PART A4
71Back Clamp for danger Plate and barbed wire PART A4
72GI barbed wire anticlimbing device PART A4
7311 KV pin insulator polymer PART A4
74NON METALLIC TIES-11KV 100 SQMM CVRD AAAC PART A4
75Spike (GI ) ( 2 Nos of spike per Set in each Pole ) PART A4
76Earthing of Support ( Coil Type ) PART A4
77GI Nut , Bolt & Washer of different sizes PART A4
78100 SQ.MM. AAAC XLPE Covered Conductor-11kV PART A4
792. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART A4
80Couping of Pole @ 1:1.5:3(M-20 Grade) PART A4
81GIS Mapping, indexing/numbering of Poles PART A4
82Painting of Pole in Black & Yellow strips/Zebra PART A4
83GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART A4
84PART B: Construction of LT AB cable 740 Mtr using 4Cx95 (P)+1Cx95 (M)+1Cx16 (street light) sq.mm, 33 Mtr span, 9 Mtr PSC poles1. Supply of materials9 Mtr. long PSC Pole PART B
85GI flat for danger plate and anticlimbing device PART B
86LT Stay set Complete PART B
877/12 SWG GI stay wire, Grade -2 PART B
88LT stay Clamp PART B
89LT Stay insulator PART B
90Pole clamp for EYE hook for (XLPE Aerial bunched Cable) PART B
91EYE hook for XLPE Aerial bunched Cable PART B
92Dead End Clamp suitable for messenger XLPE Aerial bunched Cable PART B
93Suspension Clamp with EYE hook for ABC PART B
944C×95 mm² (P)+1C×95 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) PART B
9510 WAY LT SERVICE Distb.Box PART B
96Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm PART B
97GI Pipe Earthing (each 5th pole to earth) PART B
98Coil Earthing PART B
99Danger plate (LT) PART B
100GI barbed wire anticlimbing device PART B
101GI Nut , Bolt & Washer of different sizes PART B
1022. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART B
103Concreting of Pole @ 1:1.5:3(M-20 Grade) PART B
104Construction of Earthing chamber incuding earthing pipe and civil works PART B
105Painting of Pole in Black & Yellow strips/Zebra PART B
106GIS Mapping, indexing/numbering of Poles PART B
107GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART B
108PART C: Supply and laying of 11 KV UG cable 40 Mtr using 3Cx300 sq.mm XLPE UG cable with 1 run spare1. Supply of materialsSupply of 11kV 3C 300 sqmm Aluminium XLPE insulation armoured UG cable (SC rating 28.3 kA, armour 15 kA) - 40 M with 1 run spare PART C
109Supply of outdoor termination kits heat shrinkable type for 11kV 3C 300 sqmm HT UG cable PART C
110Supply of HDPE pipe 160 mm diameter, PE 80-PN8 for laying of 11kV UG cable PART C
1112. Civil, erection & survey worksLaying, commissioning & testing of 11kV 3C 300 sqmm XLPE (extruded) UG cable by open trench method PART C
112Erection of straight through jointing / outdoor / indoor termination kits heat shrinkable type for 11kV 3C 300 sqmm aluminium UG cable PART C
113Laying of 160 mm dia PE 80-PN8 HDPE pipe inside open trench PART C
114Earth work excavation of soil (1 Mtr width x 1.2 Mtr depth) - route length 25 M PART C
115Earth work excavation of hard rock (1 Mtr width x 1.2 Mtr depth) - route length 25 M PART C
116Back filling with excavated soil outside and above the trench PART C
117Road repair and restoration charges PART C
118Supply and erection of cable route marker along the cable route at an interval of 30 Mtrs with civil works PART C
119GIS coordinate mapping, drawing preparation and submission of the same for New/Existing line PART C
120PART D: Installation of 1 No DP with AB switch & LA for HT metering unit1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART D
121GI Channel, angle & flat of different size PART D
122DMC Insulator for LA (70/10) PART D
123Danger Plate, 2 no's. PART D
12455 SQ.MM. AAAC XLPE Covered Conductor PART D
125H.T. Stay clamp PART D
126H.T. Stay set (Complete ) PART D
127H.T. Stay Insulator Type-C PART D
1287/10 SWG Stay Wire PART D
129Gi Pipe Earthing 40mm. 3 Mtr. Long PART D
130GI barbed wire anticlimbing device PART D
131Lightning Arrester(12KV,10KA) (Station Class,class-2) PART D
132AB Switch (11KV,200A.3pole,50Hz) PART D
133H W fitting(B&S) 70KN, 3Bolt PART D
134Disc insulator (B&S) 70 KN polymer PART D
135IPC for 55 sq.mm AAA conductor (For covered conductor)-11 kV PART D
136GI Nut , Bolt & Washer of different sizes PART D
137POLYCARBONATE BIRD GUARD PART D
138DO.Fuse( 11KV.200A.3Pole) PART D
13920 AMP Fuse Link PART D
1402. Civil, erection & survey worksFixing of complete Stay Set with all accessories and civil works PART D
141Concreting of Pole @ 1:1.5:3(M-20 Grade) PART D
142Couping of Pole @ 1:1.5:3(M-20 Grade) PART D
143Construction of Earthing chamber incuding earthing pipe and civil works PART D
144GIS coordinate mapping, drawing preparation and submission of the same for PART D
145Painting of Pole in Black & Yellow strips/Zebra PART D
146PCC ratio 1:3:6(M-10 Grade) For DSS Area PART D
147Supplying, Laying, spreading and compacting with hand roller stone PART D
148GI chain link fencing for DSS PART D
149PART E: Installation of 11/0.4 KV, 25 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART E
150GI Channel, angle & flat of different size PART E
151LT Distribution Box for 25 KVA S/S PART E
15255 SQ.MM. AAAC XLPE Covered Conductor PART E
1534 Cx 50 mm2 LT XLPE Cable(Armoured) - FOR 25 KVA Trf. PART E
154HDPE pipe of 110 mm diameter, PE 80- PN8 PART E
155AB Switch(11KV,200A.3pole,50Hz) PART E
156DO.Fuse( 11KV.200A.3Pole) PART E
1572.5 AMP Fuse Link PART E
158WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART E
159POLYCARBONATE BIRD GUARD PART E
160Disc insulator (B&S)70 KN polymer PART E
161H W fitting (B&S)70KN(3bolted) PART E
162Lightning Arrester(12KV,10KA) Station Class 2 PART E
163DMC Insulator for LA (70/10) PART E
164HT stay set complete PART E
165HT stay Clamp PART E
166HT stay insulator TYPE-C PART E
1677/10 SWG GI stay wire, Grade -2 PART E
168Gi Pipe Earthing 40mm. 3 Mtr. Long PART E
169GI Nuts & Bolts of Assorted size PART E
170GI Barbed wire/Anticlimbing device PART E
171Danger plate 11kv PART E
1722. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART E
173Couping of Pole @ 1:1.5:3(M-20 Grade) PART E
174PCC ratio 1:3:6(M-10 Grade) For DSS Area PART E
175Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART E
176Fixing of HT complete Stay Set with all accessories and civil works PART E
177Fixing of LT complete Stay Set with all accessories and civil works PART E
178Construction of Earthing chamber incuding earthing pipe and civil works PART E
179LTDB Plinth PART E
180Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART E
181Laying of 4 Cx 50 mm2 LT XLPE Cable PART E
182Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART E
183SITC of Aluminium Lugs suitable for 50 sq mm cable/conductor PART E
184SITC of termination kit of 1.1kV 3.5C/4C 35-120 sqmm PART E
185SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 16-35sqmm PART E
186Earth work excavation of soil PART E
187Earth work excavation of hard rock PART E
188Back filling with excavated soil outside and above the trench PART E
189Painting of Pole in Black & Yellow strips/Zebra PART E
190GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART E
191SITC of DCP Extinguisher (6KG) PART E
192SITC Display Board/Sign Board PART E
193GI chain link fencing for DSS PART E
194PART F: Installation of 11/0.4 KV, 63 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART F
195GI Channel, angle & flat of different size PART F
196LT Distribution Box for 63 KVA S/S PART F
19755 SQ.MM. AAAC XLPE Covered Conductor PART F
1984 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. PART F
199HDPE pipe of 110 mm diameter, PE 80- PN8 PART F
200AB Switch(11KV,200A.3pole,50Hz) PART F
201DO.Fuse( 11KV.200A.3Pole) PART F
20210 AMP Fuse Link PART F
203WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART F
204POLYCARBONATE BIRD GUARD PART F
205Disc insulator (B&S)70 KN polymer PART F
206H W fitting (B&S)70KN(3bolted) PART F
207Lightning Arrester(12KV,10KA) Station Class 2 PART F
208DMC Insulator for LA (70/10) PART F
209HT stay set complete PART F
210HT stay Clamp PART F
211HT stay insulator TYPE-C PART F
2127/10 SWG GI stay wire, Grade -2 PART F
213Gi Pipe Earthing 40mm. 3 Mtr. Long PART F
214GI Nuts & Bolts of Assorted size PART F
215GI Barbed wire/Anticlimbing device PART F
216Danger plate 11kv PART F
2172. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART F
218Couping of Pole @ 1:1.5:3(M-20 Grade) PART F
219PCC ratio 1:3:6(M-10 Grade) For DSS Area PART F
220Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART F
221Fixing of HT complete Stay Set with all accessories and civil works PART F
222Fixing of LT complete Stay Set with all accessories and civil works PART F
223Construction of Earthing chamber incuding earthing pipe and civil works PART F
224LTDB Plinth PART F
225Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART F
226Laying of 4 Cx 95 mm2 LT XLPE Cable PART F
227Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART F
228SITC of Aluminium Lugs suitable for 95 sq mm cable/conductor PART F
229SITC of termination kit of 1.1kV 3.5C/4C 35-120 sqmm PART F
230SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm PART F
231Earth work excavation of soil PART F
232Earth work excavation of hard rock PART F
233Back filling with excavated soil outside and above the trench PART F
234Painting of Pole in Black & Yellow strips/Zebra PART F
235GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART F
236SITC of DCP Extinguisher (6KG) PART F
237SITC Display Board/Sign Board PART F
238GI chain link fencing for DSS PART F
239PART G: Installation of 6 Nos 11/0.4 KV, 100 KVA DP mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART G
240GI Channel, angle & flat of different size PART G
241LT Distribution Box for 100 KVA S/S PART G
24255 SQ.MM. AAAC XLPE Covered Conductor PART G
2434 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. PART G
244HDPE pipe of 110 mm diameter, PE 80- PN8 PART G
245AB Switch(11KV,200A.3pole,50Hz) PART G
246DO.Fuse( 11KV.200A.3Pole) PART G
24710 AMP Fuse Link PART G
248WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART G
249POLYCARBONATE BIRD GUARD PART G
250Disc insulator (B&S)70 KN polymer PART G
251H W fitting (B&S)70KN(3bolted) PART G
252Lightning Arrester(12KV,10KA) Station Class 2 PART G
253DMC Insulator for LA (70/10) PART G
254HT stay set complete PART G
255HT stay Clamp PART G
256HT stay insulator TYPE-C PART G
2577/10 SWG GI stay wire, Grade -2 PART G
258Gi Pipe Earthing 40mm. 3 Mtr. Long PART G
259GI Nuts & Bolts of Assorted size PART G
260GI Barbed wire/Anticlimbing device PART G
261Danger plate 11kv PART G
2622. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART G
263Couping of Pole @ 1:1.5:3(M-20 Grade) PART G
264PCC ratio 1:3:6(M-10 Grade) For DSS Area PART G
265Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART G
266Fixing of HT complete Stay Set with all accessories and civil works PART G
267Fixing of LT complete Stay Set with all accessories and civil works PART G
268Construction of Earthing chamber incuding earthing pipe and civil works PART G
269LTDB Plinth PART G
270Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART G
271Laying of 4 Cx 150 mm2 LT XLPE Cable PART G
272Concreting ratio 1:1.5:3(M-20 Grade)-For PSC Pole PART G
273SITC of Aluminium Lugs suitable for 150 sq mm cable/conductor PART G
274SITC of termination kit of 1.1kV 3.5C/4C 150-240 sqmm PART G
275SITC of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm PART G
276Earth work excavation of soil PART G
277Earth work excavation of hard rock PART G
278Back filling with excavated soil outside and above the trench PART G
279Painting of Pole in Black & Yellow strips/Zebra PART G
280GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART G
281SITC of DCP Extinguisher (6KG) PART G
282SITC Display Board/Sign Board PART G
283GI chain link fencing for DSS PART G
284PART H: Installation of 11/0.4 KV, 250 KVA plinth mounted DSS with accessories (DTR not considered)1. Supply of materialsWPB (GI) Pole 160x152 11 Mtr. Long for DP PART H
285GI Channel, angle & flat of different size PART H
286LT Distribution Box for 250 KVA S/S PART H
28755 SQ.MM. AAAC XLPE Covered Conductor PART H
2881 Cx 630 mm2 LT XLPE Cable(Un-Armoured) PART H
2891.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable PART H
290HDPE pipe of 110 mm diameter, PE 80- PN8 PART H
291AB Switch(11KV,200A.3pole,50Hz) PART H
292DO.Fuse( 11KV.200A.3Pole) PART H
29320 AMP Fuse Link PART H
294WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR PART H
295POLYCARBONATE BIRD GUARD PART H
296Disc insulator (B&S)70 KN polymer PART H
297H W fitting (B&S)70KN(3bolted) PART H
298Lightning Arrester(12KV,10KA) Station Class 2 PART H
299DMC Insulator for LA (70/10) PART H
300HT stay set complete PART H
301HT stay Clamp PART H
302HT stay insulator TYPE-C PART H
3037/10 SWG GI stay wire, Grade -2 PART H
304Gi Pipe Earthing 40mm. 3 Mtr. Long PART H
305GI Nuts & Bolts of Assorted size PART H
306GI Barbed wire/Anticlimbing device PART H
307Danger plate 11kv PART H
3082. Civil, erection & survey worksConcreting of Pole @ 1:1.5:3(M-20 Grade) PART H
309Couping of Pole @ 1:1.5:3(M-20 Grade) PART H
310PCC ratio 1:3:6(M-10 Grade) For DSS Area PART H
311Supplying, Laying, spreading and compacting with hand roller stone aggregate of PART H
312Fixing of HT complete Stay Set with all accessories and civil works PART H
313Fixing of LT complete Stay Set with all accessories and civil works PART H
314Construction of Earthing chamber incuding earthing pipe and civil works PART H
315LTDB Plinth PART H
316DTR Plinth PART H
317Laying of 110mm dia PE 80-PN8, HDPE pipe inside open trench. PART H
318Laying of 1.1kV cable from 400 to 1000sqmm PART H
319SITC of Aluminium Lugs suitable for 630 sq mm cable/conductor PART H
320SITC of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm PART H
321Earth work excavation of soil PART H
322Earth work excavation of hard rock PART H
323Back filling with excavated soil outside and above the trench PART H
324Painting of Pole in Black & Yellow strips/Zebra PART H
325GIS coordinate mapping, drawing preparation and submission of the same for DSS. PART H
326SITC of DCP Extinguisher (6KG) PART H
327SITC Display Board/Sign Board PART H
328GI chain link fencing for DSS PART H
329PART I: Construction of 3 Nos 30 Mtr 11 KV line protecting guarding for road crossing1. Supply of materialsGI Channel, angle & flat of different size PART I
330No-10 GI wire for lacing PART I
331No-8 GI wire for guard wire PART I
332Gi Pipe Earthing 40mm. 3 Mtr. Long PART I
3332. Civil, erection & survey worksConstruction of Earthing chamber incuding earthing pipe and civil works PART I
334PART J: Dismantling of materials1. Dismantling worksDismantling of 11/13 Mtr. Joist/WPB Pole - 150X150 mm / 160X160 mm PART J
335Dismantling / Removal of V Cross arm from pole PART J
336Dismantling of 11kV Pin Insulator with Pin PART J
337Dismantling of 11kV Disc Insulator with Hardware PART J
338Dismantling / Removal of MS Channel from Double Pole Structure / pole PART J
339Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 25 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J
340Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 63 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J
341Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer below 100 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J
342Dismantling of existing 11/0.4kV, 33/0.4kV three-phase distribution transformer 250 KVA incl. removal of HT/LT leads, earth connections and unloading by crane PART J
343Dismantling of ACSR/AAAC 80/100 mm2 from overhead line PART J
344Dismantling of various size of LT AB Cable PART J
345Dismantling of 11 kV / 33 kV GO/AB Switch/Isolator/DD fuse/fuse set PART JN:B: Salvage value to be deducted from the contracto's bill. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58645952
AUTHORITY Government Departments
TENDER VALUE 74.79 Lakhs
LAST DATE 05-12-2026
Authority
Authority Name Road And Building Department
Work Description Tender for Shifting Of Subdstations, 11Kv Lines And Lt Lines For Improvement And Widening Of Road From Jagamara To Nh-16 (Ch.0/000 To Ch.0/780Km).
Basic Detail
Tender No Bid Identification No.S.E.E.C (RandB) 42/2026-27
Bidding Type Tender
Location
City Khordha
State Odisha
Key Dates
Publish Date 20 Nov 2026
Submission Date 05 Dec 2026
Open Date 07 Dec 2026
Finance
Tender Value 74.79 Lakhs
Tender Fee 10000
EMD 74796
Exemption Not Available
Document List
7c666f8d-9b5c-42c2-821d-5708dc99486d.html
BOQ_622753.xls
DTCN.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Dec 07, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
html

7c666f8d-9b5c-42c2-821d-5708dc99486d.html

xls

BOQ_622753.xls

pdf

DTCN.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender