Tender For Repair/ Maintenance Of ‘B Vehicles Of Mt And Connected Works Alongwith Accessories Under Ge New Delhi
Tender Value
16.50 Lakhs
Estimated cost
Bid Submission
09 Dec 2026
18 days left
EMD
33000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
New Delhi → Delhi
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance Of ‘B Vehicles Of Mt And Connected Works Alongwith Accessories Under Ge New Delhi
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority : GE NEW DELHI Name of Work: REPAIR/ MAINT OF ‘B’ VEHICLES OF MT AND CONNECTED WORKS ALONGWITH ACCESSORIES UNDER GE NEW DELHI Contract No: GE/ND-69/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Rates only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sch. itemNo. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Rs. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | M&L for carrying out general periodical servicing and checking of the complete engine / transmission system / suspension system / exhaust system /cooling system / Electrical system and braking system complete along with carrying out wheel Rotation /Alignment along with greasing of wheel bearings and rectify the minor complaints defects as per manufacturer's recommendations / particular specification including along with replacement of required necessary minor spares such as nut, bolts, fuses tuning and testing of engine under ideal and load conditions complete all as specified and directed for as 4 wheeler and two wheeler vehicles listed in item no. 1.01 to 1.03 here-in-after :- Note (i) Engine Oil and Coolant , air filter, spark plugs etc shall be measured and paid under relevant Item.(ii) Major Unserviceable items shall be measured and paid under relevant Items here-in-after. |
| 3 | Swift Dzire -01 Nos ,Tata Xenon-02 Nos,Tata Yodha -02Nos (Two service in a year) |
| 4 | Eicher 10.75 E (one service in a year) |
| 5 | Tata LPT 709 (one service in a year ) |
| 6 | M&L for carrying out general periodical servicing of Hero HF delux 06 Nos and Bajaj Platina -03 Nos (two service in a year) and checking of the complete suspension system/ exhaust system electrical system and braking system complete along with rectify for the minor complaints defecects as per manufacturer recommendation/ particular specification including complete all as specified and directed.Note (i) Engine Oil, spark plugs and air filter shall be measured and paid under relevant Item.(ii) Major Unserviceable items shall be measured and paid under relevant Items here-in-after.(iii) Replace the old sticker letters, indicating sign as per direction |
| 7 | S&F in replacement the following Spares with accessories suitable for Eicher 10.075 E-01 Nos & TATA LPT-709-01 Nos complete all as specified and directed :-Make: As per Existing/ as per OEM recommendation |
| 8 | Air Filter |
| 9 | fuel filter |
| 10 | Oil filter |
| 11 | Dust evacuation cap, Air cleaner |
| 12 | Oil seal hub front and rear wheel |
| 13 | Wheel Bearings Rear-02 nos and Front -02 nos |
| 14 | Engine oil seals complete set |
| 15 | Engine Top cover gasket |
| 16 | Head Light lamp |
| 17 | Side turn indicators with lamp assembly |
| 18 | Clutch pedal Cable with inner and Outer |
| 19 | Mirror RH rear view adjustable as per OEM |
| 20 | Mirror LH rear view adjustable as per OEM |
| 21 | Suspension shock absorber Front/Rear |
| 22 | Horn 12V LF/HF |
| 23 | Battery terminal |
| 24 | Radiator Fan Relay |
| 25 | Fan belt |
| 26 | Seat cover driver and pillion |
| 27 | Brake shoes all as per directed by EIC |
| 28 | Front Mirror |
| 29 | Removing of the complete Top cover of the rear cabin and supply and fixing of Best Quality water Proof Tarpaulins of size 12.5 x 15 feet of approved colour (dark grey) with side 4 nos windows on left and right and fixing the entire top cover with nylon rope support iron angle and necessary accessories complete as approved and directed by Engineer-in-charge. |
| 30 | Removing of the complete worn out up holster and foam/coil of the cabin seats and making/stitching and fixing of the upholster and cabin seats driver and co pilion seats with good quality of water resistant cloth, heat resistant fiber /glass wool sheets foam/coir for Eicher 10.75-01 nos and TATA 709-01 Nos complete all as specified and directed. |
| 31 | S&F Wind screen for vehicle (Eicher) complete all as specified and directed by Engr in Charge. |
| 32 | Dismantling of self starter and repair/replacement of unserviceable accessories and refitting of self starter including starter motor (For Eicher ,Tata LPT-709) complete all as specified and directed. |
| 33 | M&L for Complete wheel balancing to be done by computerized mechanical equipment (Eicher-01 & Tata LPT 709-01) complete all as specified and directed by Engr in-Charge. |
| 34 | Dismounting the fuel tank of Eicher for cleaning and replacement of , float indicator -01 Nos and refixing the fuel tank after cleaning including necessary fuel/electrical connection (for Eicher 10.75-01 nos, TATA 709-01Nos) complete all as specified and directed. |
| 35 | M&L for opening of all wheels front and rear removing of wheel drum, all hubs, greasing of hub bearing, painting of wheel drum & hubs replacement of unserviceable wheel drum nut & bolts including fitting of vehicles (for Eicher-01 Nos ,TATA LPT-709-01 Nos) complete all as specified and directed by Engr in charge. |
| 36 | Dismantling and maintenance of Dynamo and repair/ replacement of unserviceable accessories and refitting of dynamo (for Eicher-01 Nos,Tata 709-01 No) complete all as specified and directed. |
| 37 | M&L for preparation of old painted surface by scrapping and cleaning agent and painting with two coats of enameled paint over a coat of red oxide primer including making number plate and marking veh BA No., formation / UNIT name sign with fluorescent / reflective stickers , and all other sign (for Eicher-01 nos, tata 709 -01 nos) complete all as specified and directed by Engr in charge. |
| 38 | M&L for Strip opening of motor cycle Hero HF Delux and Bajaj Platina engine by the dismantling of serviceable / unserviceable parts over haul and refixing of serviceable parts after cleaning including servicing and greasing and fixing of the unserviceable spares with new ones complete all as specified and testing of vehicle after repair for satisfaction of Engineer-in -Charge. Note:-Unserviceable parts will be paid and measured separately under relevant items |
| 39 | S&F in replacement only the spares/ accessories for motor cycle Hero HF Delux and Bajaj Platina 2 wheeler complete all as specified and directed as per following :- |
| 40 | Horn 12V |
| 41 | Air Filter /oil filter /fuel filter |
| 42 | Petrol tank Cover |
| 43 | Seat Cover complete rider and pillion |
| 44 | Darin Plug with Washer |
| 45 | Spark Plug |
| 46 | CDI Unit |
| 47 | Front or rear MUD guard |
| 48 | Carburetor assembly complete |
| 49 | Accelerator Cable with inner and Outer |
| 50 | Front Brake Cable with inner and Outer |
| 51 | Clutch Cable with inner and outer |
| 52 | Clutch /Mesh Plates set |
| 53 | Rear View Mirror LH/RH |
| 54 | Chain set |
| 55 | Fuel tank cleaning |
| 56 | Side indicator |
| 57 | Stand |
| 58 | Side beg |
| 59 | M&L for preparation of old painted surface by scrapping and cleaning agent and painting with two coats of enameled paint over a coat of red oxide primer including making number plate and marking veh BA No., formation / UNIT name sign with fluorescent / reflective stickers , and all other sign ( for HF delux -06 nos and Bajaj Platina -03 Nos) complete all as specified and directed. |
| 60 | M&L for Strip opening of the vehicle along with engine for overhaul, of veh TATA -Yodha /TATA Xenon,Maruti swift Dzire and segregating of serviceable / unserviceable parts and refixing of serviceable parts after cleaning including servicing and greasing complete and replacing the unserviceable spares parts complete all as specified and testing of vehicle after repair for satisfaction of Engineer-in -Charge (Tata Yodha-2 nos,Tata xenon -02 Nos Maruti Swift Dzire -01 Nos) complete all as specified and directed. Note:-Unserviceable parts will be paid and measured separately under respective items |
| 61 | S&F in Replacement of the following spare parts / accessories suitable for TATA yodha/Tata crew/Tata Xenon/Maruti swift Dzire complete all as specified and directed :- |
| 62 | Oil filter Element |
| 63 | Universal joint cross |
| 64 | RV Mirror outer LH/RH |
| 65 | RV Mirror inside |
| 66 | Horn 108 Dia |
| 67 | Fuel filter element |
| 68 | Door lock |
| 69 | Door latch |
| 70 | Assy 240 Dia Clutch pressure plate |
| 71 | Assy Oil pump |
| 72 | Break Drum Rear |
| 73 | Clutch Cable |
| 74 | Accelerator Cable |
| 75 | Seat cover ( complete front & Back) |
| 76 | Air filter |
| 77 | Turn indicator |
| 78 | Shock absorbers Front/Rear |
| 79 | Radiator Fan Motor |
| 80 | Wiper blade with accessories |
| 81 | Mud guard for front and rear wheels |
| 82 | Safety seat belt |
| 83 | Grease supper grade |
| 84 | Vehicle mat |
| 85 | Front Mirror |
| 86 | Brake shoes all as per directed by EIC |
| 87 | M&L for opening of all wheels front and rear removing of wheel drum, all hubs, greasing of hub bearing, painting of wheel drum & hubs replacement of unserviceable wheel drum nut & bolts including fitting of vehicles (for Tata Yodha-02 nos, tata xenon-02 nos maruti Swift Dzire -01) complete all as specified and directed. |
| 88 | M&L for Complete wheel balancing (all wheels) to be done by computerized mechanical equipment (for ata Yodha-02 nos, tata xenon-02 nos maruti Swift Dzwire -01) complete all as specified and directed by engineer in charge. |
| 89 | Dismounting the fuel tank of Tata Yodha ,tata xenon Maruti Swift Dzire for cleaning and replacement of float indicator -01 Nos, and refixing the fuel tank after cleaning including necessary fuel/electrical connection-01 Job complete all as specified and directed by engineer in charge. |
| 90 | M&L for surface preparation by removing old paint by scrapping with emery paper, cleaning with suitable cleaning material and painting the vehicle by applying approved quality existing colour paint by spray gun and other instruments including making number plate and marking veh BA No., formation / UNIT name sign with fluorescent / reflective stickers (for Tata Yodha, tata xenon ) complete all as specified and directed. |
| 91 | S&F Wind screen for vehicle for tata Yodha-02 nos, nos, tata xenon-02 nos maruti Swift Dzwire -01) complete all as specified and directed by engineer in charge. |
| 92 | M&L For repair of flywheel ring with connected items complete all as specified and directed by EIC |
| 93 | S&F only for renewal of brake booster complete standard tata spare parts complete all as specified and directed by EIC |
| 94 | S&F only for renewal of crown pinion complete standard tata spare parts complete all as specified and directed by EIC |
| 95 | Dismantling of Alternator and repair/replacement of unserviceable accessories and refitting of dynamo (for TATA yodha, tata crew, tata xenon) complete all as specified and directed. |
| 96 | Dismantling of self starter and repair/ replacement of unserviceable accessories and refitting of self starter (for TATA yodha, tata xenon) complete all as specified and directed. |
| 97 | M&L for attending any break down of any type of vehicle in any location with veh machenic,helper and T&P etc including vehicle toeing arrangement from breakdown location to MT Yard or workshop complete all as specified and directed by engineer in charge. |
| 98 | M&L for denting of body for any type of vehicle by removing of unserviceable body parts and making serviceable by welding of new sheet, plate channel etc including replacement of unserviceable nut, bolt & washer (for TATA yodha, tata xenon Eicher,Tata 709 complete all as specified and directed by Engineer-in-charge. |
| 99 | S&F First aid box in all 4 wheelers and Eicher and Swift Dizre including basic accessories complete all as specified and directed by engineer in charge. |
| 100 | Repalcement of engine oil in TATA 709, Eicher, Tata yodha/crew, TATA xenon and Maruti Swift Dzire and bike as per sample/grade complete all as specified and directed by engineer in charge. |
| 101 | Repalcement of diffrential engine oil in TATA 709, Eicher, Tata yodha/crew, TATA xenon and Maruti Swift Dzire as per sample complete all as specified and directed by engineer in charge. |
| 102 | Replacement of steering oil in TATA 709, Eicher, Tata yodha/ and TATA xenon as per sample complete all as specified and directed by engineer in charge. |
| 103 | Replacement of Brake oil in TATA 709, Eicher ,Tata yodha/crew TATA xenon as per sample complete all as specified and directed by engineer in charge. |
| 104 | Replacement of coolant in TATA 709, Eicher, Tata yodha/crew, TATA xenon and Maruti Swift Dzire as per sample complete all as specified and directed by engineer in charge.Note: (a) Materials in respect of Freakishly low declared items if any at the time of acceptance of contract shall be procured within one month after placing of work order and submit the same in the office of Engg in charge alongwith original purchase vouchers in their safe custody and shall obtain a certificate from Engg in charge. Purchase vouchers of subject items shall be produce during technical check of payment. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 09, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysDec 11, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender