Tender For Development Of Parks With Toe Wall And Grill Fencing, Earth Filling In Sector-9 (Part-A) At U/E Jhajjar With Three Years Defect Liability Period Free Of Construction A/C Rs.49.92 Lacs E/M Rs.99840/- T/Limit : 04 Months
Tender Overview
Project Description
Tender for Development Of Parks With Toe Wall And Grill Fencing, Earth Filling In Sector-9 (Part-A) At U/E Jhajjar With Three Years Defect Liability Period Free Of Construction A/C Rs.49.92 Lacs E/M Rs.99840/- T/Limit : 04 Months
BOQ
| Sl. No. | Item Description |
| 1 | 4.7.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10sqm on plan including getting out and disposal of excavated earth and lift up to 1.5 m, as directed by Engineer-in- Charge:1..1 All kinds of soil 50m lead |
| 2 | 11.6.1 CEMENT PLASTER (IN FINE SAND) 15 mm cement plaster on the rough side of single or half brick wall of mix :2 1:6 (1 cement: 6 fine sand) |
| 3 | 11.25.1 POINTING ON BRICK WORK Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand):1 Flush / Ruled/ Struck or weathered pointing. |
| 4 | 13.29.2 SIGLE/BUILT-UP STEEL/TUBULAR SECTIONS Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 5 | 11.68.3 INTERIOR FINISHING Applying priming coat:3 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works. |
| 6 | 10.100.1 OTHER MISCELLANEOUS ITEMS USED FOR FLOORING 0 Cement Concrete 1:8:16 Flooring1 Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. |
| 7 | 11.78 INTERIOR FINISHING Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. |
| 8 | 7.20.2 BRICK WORK Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in:2 Cement Mortar 1:6 (1 cement : 6 coarse sand). |
| 9 | 30.24 FINISHING WORKS Distempering with dry distemper of approved brand and manufacture(one or more coats) and of required shade on old work to give an even shade. |
| 10 | 26.57.1 Clearing herbaceous wild growth1 Clearing by manual labour, collection and disposal of undesirable material including digging roots with Kassi and khurpa. |
| 11 | 6.1.2 A CEMENT CONCRETE (CAST IN SITU) Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level:2 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 12 | 6.2.2 A CEMENT CONCRETE (CAST IN SITU) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing:2 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 13 | 6.8.2 B DAMP-PROOF COURSE Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)2 40mm thick |
| 14 | 6.29.3 I CENTRING AND SHUTTERING (FORM WORK) Centering and shuttering including strutting, propping etc. And removal of form work for :3 Columns, piers, abutments, pillars, posts and struts |
| 15 | 6.33.3 J STEEL REINFORCEMENT Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level3 Cold twisted bars. |
| 16 | Job Work Supply of rubber hose pipe (Dunlop make) complete in all respect. |
| 17 | Job Work Supply and filling of good warth work including loading, unloading and carriage at site of work complete in all respect and satisfaction of engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender