Tender For Supplying, Fiiting & Fixing S.S Flap Shutter And Actuator At Chandpal Ghat Outfall Including Allied Civil Works
Tender Value
51.45 Lakhs
Estimated cost
Bid Submission
11 Dec 2026
20 days left
EMD
1.60 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supplying, Fiiting & Fixing S.S Flap Shutter And Actuator At Chandpal Ghat Outfall Including Allied Civil Works
BOQ
| Sl. No. | Item Description |
| 1 | TOTAL |
| 2 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIALWORKS. III. EVENT MANAGEMENT : 1) Hire and labour charges for75 mm dia bamboo railing on Jhau/Eucalyptus or other approvedtimber posts 1.4 m above G.L. and 0.60 m below G. including tyingstrongly with coir ropes and boring holes for posts in any soil/concrete surface/Bituminious surface packing the sides etc includingcost of carriage of all materials and labour complete including cost ofrestoration to the damages of the ground to its original condition asper direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid separately.) (a) 75mm. dia bamboorailing & 125mm. dia Jhau/Eucalyptus/other approved timber posts @1.60m apart. (i) Railing with 4 rows |
| 3 | BUILDING WORKS (E) ROOFING, SHEET WALLING&WATERPROOF TREATMENT . A. ROOFING & SHEETWALLING30. Walling or roofing fitted and fixed complete with cut drum sheetsincluding the cost of drums, cost of cutting drums andflattening the sheets and cost of necessary nails and screws. (Cost ofempty bitumen drums issued by the Deptt. will berecovered at Rs. 100.00 for each drum) |
| 4 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELSAND OTHER FLOOD PROTECTIVE MEASURES 2.24.Supplying tosite empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50kg) |
| 5 | MATERIALS AND LABOUR 1. Building (A) Materials delivered andstacked at site: 6)d)Silver Sand. Note: 1. The above rates areinclusive of all charges such as Royalty, Supervision Charges, etc.and also include allowance for sinkage, as applicable, and/orshrinkage and 10% Contractor?s Profit but exclusive of GST2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates atsite and no other costs need to be considered. For other items,necessary loading-unloading & carriage charges are admissible.3. Laterrite Boulder &Moorum are available in the districts asmentioned in Sl. No. ? 23 & 24 respectively, remaining districts mayadd necessary carriage cost as applicable. |
| 6 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELSAND OTHER FLOOD PROTECTIVE MEASURES 2.27.Labourcharges for filling empty cement gunny bag / polythene bag (capacity50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone /brick) and sewing as done in case of cement bags ,( tying with a knotafter filling will not be accepted ) , and stacking within a lead of 30metre as per direction of Engr-in-charge (cost is excluding the cost ofany types of filling materials). NB:- Volume of earth/ sand filled bagsshould not be less than 0.028 cum/bag |
| 7 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELSAND OTHER FLOOD PROTECTIVE MEASURES 2.29.Dumping inposition earth / sand filled gunny / poly bags (capacity 50kg) within alead of 30 metre inclusive of all lifts |
| 8 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. fromroad side masonary open drain/ nikashi etc. by mathor labour afterremoving concrete slab / manhole cover etc.without damaging thesame and refixing the same properly after cleaning as necessary andremoving the sludge etc. by using iron pans,buckets including alllabour, tools & plants including expulsion of impure / inflammable /asphyxiating gases from the drains etc. and removing the spoils in drycondition and disposing the same by truck beyond the area ofMunicipal Corporation / Municipality / Notified Area Authority /Industrial Township Authority etc. for such disposal including the costof loading, unloading, transportation and making arrangement ofnecessary land for disposal, spreading and leveling as necessary etc.and cleaning the road side in all respects, complete as per directionof the Engineer- in-Charge. (Land for disposal to be arranged by thecontractor).(Payment will be made on the basis of actual stackmeasurment of spoils in dry condition at roadsid(e) For Day |
| 9 | PROTECTIVE AND LINING WORKS IN CANALS & CHANNELSAND OTHER FLOOD PROTECTIVE MEASURES 2.32.Removingearth/sand filled poly bags/gunny bags from the channel bed/slopeand initially depositing the same near channel bank at a place asdirected by the Engineer-in Charge for measurement of Bag. & thendisposing off the same at a distance not less than 150 metre from thechannel site. |
| 10 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Comp machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff,carriage, fuel, Tools and plants all complete for cutting Road / hardcrust cutting with pneumatic hammer at desired point in water supplyworks as per direction of EIC . a) With Pneumatic hammers Forminimum engagement of 8 hrs. In a day |
| 11 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT2. Earth work in excavation of foundation trenches or drains, in allsorts of soil (including mixed soil but excluding laterite or sandstone)including removing, spreading or stacking the spoils within a lead of75 m. as directed. The item includes necessary trimming the sides oftrenches levelling, dressing and ramming the bottom, bailing outwater as required complete. (a) Depth of excavation not exceeding1,500 mm |
| 12 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT2. Earth work in excavation of foundation trenches or drains, in allsorts of soil (including mixed soil but excluding laterite or sandstone)including removing, spreading or stacking the spoils within a lead of75 m. as directed. The item includes necessary trimming the sides oftrenches levelling, dressing and ramming the bottom, bailing outwater as required complete (b) Depth of excavation for additionaldepth beyond 1,500 mm. and upto 3,000 mm. but not requiringshoring |
| 13 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT2. Earth work in excavation of foundation trenches or drains, in allsorts of soil (including mixed soil but excluding laterite or sandstone)including removing, spreading or stacking the spoils within a lead of75 m. as directed. The item includes necessary trimming the sides oftrenches levelling, dressing and ramming the bottom, bailing outwater as required complete (c)Depth of excavation for additionaldepth beyond 3000 mm. upto 4000mm. excluding cost of shoring asnecessary. |
| 14 | Earth work in excavation of foundation trenches or drains, in all sortsof soil (including mixed soil but excluding laterite or sandston(e)including removing, spreading or stacking the spoils within a lead of75 m.as directed. The item includes necessary trimming the sides oftrenches, levelling, dressing and ramming the bottom, bailing outwater as required complete. (Excluding cost of shoring). (a) Beyond4000 mm to 6000 mm below G.L |
| 15 | Earth work in excavation of foundation trenches or drains, in all sortsof soil (including mixed soil but excluding laterite or sandston(e)including removing, spreading or stacking the spoils within a lead of75 m.as directed. The item includes necessary trimming the sides oftrenches, levelling, dressing and ramming the bottom, bailing outwater as required complete. (Excluding cost of shoring). (a) Beyond6000 mm to 7500 mm below G.L. |
| 16 | Hire and labour charges for shoring with Sheet pile (12 mm thick) &ISMB-250 runner, struts, anchor, tie etc. complete. Beam sectionconforming to IS-226 IS:808 & SP(6)-1964 including cutting torequisite length, fabrication with necessary welding conforming to IS:816-1956 & IS: 1995 using electrodes of approved make and brand conforming to IS: 814-1957 including driving and complete removingthem as per direction of the Engineer-in-Charge. For overall depth ofexcavation from G.L., a) 4.0 M to below 5.0 M |
| 17 | BUILDING WORKS(P) SOLING, EDGING ANDMETALLING??(1)Brick soling with picked jhama bricks includingpreparation of bed as necessary with brick joints properly filled in andpacked with powdered earth and including necessary cushion ofsimilar material below the soling (and in between layers when morethan one layer is used) completes as per direction.(a) Single brick flatsoling (thickness 75 mm.) |
| 18 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hireand labour charges for shuttering with centering and necessarystaging upto 4 m using approved stout props and thick hard woodplanks of approved thickness with required bracing for concrete slabs,beams and columns, lintels curved or straight including fitting, fixingand striking out after completion of works (upto roof of groundfloor) |
| 19 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADEDSTONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDINGSHUTTERING AND REINFORCEMENT, IF ANY, IN GROUNDFLOOR AS PER RELEVANT IS CODES (BASED ON PWDSCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDADT.04.06.2018) |
| 20 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADEDSTONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDINGSHUTTERING AND REINFORCEMENT, IF ANY, IN GROUNDFLOOR AS PER RELEVANT IS CODES (BASED ON PWDSCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDADT.04.06.2018) |
| 21 | Reinforcement for reinforced concrete work in all sorts ofstructures including distribution bars, stirrups, binders etc initialstraightening and removal of loose rust (if necessary), cutting torequisite length, hooking and bending to correct shape, placing inproper position and binding with 16 gauge black annealed wire atevery intersection, complete as per drawing and direction.(a) Forworks in foundation and upto roof of ground floor/upto 4 m.(i) Torsteel/Mild Steel.II. Other than SAIL/ TATA/RINL |
| 22 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,ceiling etc.) with sand and cement mortar including rounding off orchamfering corners as directed and raking out joints includingthroating, nosing and drip course, scaffolding/staging wherenecessary (Ground floor).[Excluding cost of chipping over concretesurface](ii) With 1:4 cement mortar (a) 20 mm thick plaster |
| 23 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punningabout 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement0.152 cu.m per100 sq.m. |
| 24 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumpsincluding all leads, lifts and making all arrangements of disposal.where continuous flow of water from a source other than natural orground water is encountered in case of emergency maintenanceworks related to leakage. breakage and making wet connections.[Note ;- In case of any other situation demanding such emergencydewatering. use of this item is to be approved by the SuperintendingEngineer/Tender Accepting Authority. This item shall be executed onthe specific direction duly supported by proper clarification of theE.I.C. who will be satisfied in absolute discretion that such work hasnot been necessitated due to any natural source of water or any faultof the Contractor] |
| 25 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT3. Earth work in filling in foundation trenches or plinth with good earth,in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete. (Payment to be made on the basis ofmeasurement of finished quantity of work) (a) With earth obtainedfrom excavation of foundation. |
| 26 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLESETC 13. Removal of rubbish,earth etc. from the working site anddisposal of the same beyond the compound, in conformity with theMunicipal / Corporation Rules for such disposal, loading into truckand cleaning the site in all respect as per direction of Engineer incharge |
| 27 | Supplying, fitting and fixing C.I. Steps of approved quality anddesign.. |
| 28 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICKWORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a)In foundation and plinth |
| 29 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICKWORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b)In superstructure, ground floor |
| 30 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 31 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works incolumns, beams etc. with simple rolled structural members (e.g.joists, angle, channel sections conforming to IS: 226, IS: 808 & SP(6)- 1964 connected to one another with bracket, gussets, cleats asper design, direction of Engineer-incharge complete including cuttingto requisite shape and length,fabrication with necessary bolting, metalarc welding conforming to IS: 816- 1969 & IS: 1995 using electrodesof approved make and brand conforming to IS:814- 2004, haulage,hoisting and erection all complete. The rate includes the cost of rolledsteel section, consumables such as electrodes, gas and hire chargeof all tools and plants and labour required for the work including allincidental chages such as electricity charges, labour insurancecharges etc. Payment to be made on the basis of calculated weight ofstructural members only in finished work as per IS specified weight.Payment for gusset, bracket, cleat, rivets, bolts and nuts may bemake by adding the actual weight of such items with the weight offinished structural members or 7% of weight for finished structuralmembers weighing not less than 22.5 Kg. / m. or 15 % of weight forfinished structal members weighing less than 22.5 Kg. / m. may beincreased allow for bracket, cleat, rivet, bolts and nuts etc. and noseperate payment being made for these items, as per direction ofEngineer In Charge. The rates are considered for a height of erection8m. / 2nd floor level from the ground. Add 1.5% extra over the rate foreach additional floor or 4m. beyond initiial 8m. or part thereof. I) Forstructural members of specified sections weighing less than 22.5Kg./m |
| 32 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamentalgrill of approved design joints continuously welded with M.S, W.I.Flats and bars of windows,railing etc. fitted and fixed with necessaryscrews and lugs in ground floor. (Add extra @ 1% for each addl. floorupto 4th floor and @ 1.25%for each addl. floor above 4th floor) (i)Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. (MODEOF MEASUREMENT):-The weight of grill per sq.m. will bedetermined by taking thephysical weight of fabricated grill anddividing the same by covered area of the same. N.B. No shop primingwill be allowed to facilitate inspection of workmanship. Weight of grillis to be taken after final grinding and finishing the weld. |
| 33 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :13)Santras. |
| 34 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :3)Mazdoor (Male). |
| 35 | (C) III: Labour Rate for Sanitary and Plumbing 4.Methor Mazdoor |
| 36 | Estimated amount |
| 37 | 18% GST |
| 38 | 1% CESS |
| 39 | FIXING OF REINFORCEMENT IN EXISITING RCC MEMBER BYCHEMICAL GROUTING. THE RATE INCLUDES COST OFSCANNING TO IDENTIFY POSITION OF EXISTINGREINFORCEMENT,COST OF ALL MATERIALS (EXCEPTREINFORCEMENT), TOOLS AND PLANTS AND LABOURCOMPLETE AS PER SPECIFICATION AND DIRECTION OFENGINEER IN CHARGE--- 12 MM DIA |
| 40 | MANUFACTURING, SUPPLYING AND INSTALLATION OF SS FLAPSHUTTER INCLUDING ALL NECESSARY FITTING FIXING ANDPOLISHING |
| 41 | SUPPLY AND INSTALLATION OF ROTORK SYNCROPAK ELECTRICAL ACTUATOR SCADA COMPATIBLE FOR OPERATION OF PENSTOCK GATES INSTALLED Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 11, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysDec 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender