Tender For Strengthening Of Double Kundha Conductor Strung Bus Of Existing 230Kv Main Bus I & Ii, 110Kv Main Bus And Single Kundha Of 230Kv Jack Bus And Auto Transformer Lv Bus Into Double Zebra Conductor Strung Bus And Replacement Of Non Standard Al
Tender Overview
Project Description
Tender for Strengthening Of Double Kundha Conductor Strung Bus Of Existing 230Kv Main Bus I & Ii, 110Kv Main Bus And Single Kundha Of 230Kv Jack Bus And Auto Transformer Lv Bus Into Double Zebra Conductor Strung Bus And Replacement Of Non Standard Aluminium Bus Bars By New Aluminium Bus Bars, Supply And Erection Of Clamps & Connectors, Etc., At 230/110Kv Singaperumal Koil Substation.
BOQ
| Sl. No. | Item Description |
| 1 | 230kV & 110kV Bus strengthening work at SP Koil 230kV SS. |
| 2 | Labour charges for erection of support/up right/under hang 230 KV insulators or disc insulator. (Under LC Condition) |
| 3 | Labour charges for erection of support/up right/under hang 110 KV insulators(Under LC Condition) |
| 4 | Labour for stringing of 230 kV strung bus with Double Zebra conductor (1 span 6 runs) including hoisting of insulator including supply of yoke plate suitable for 1 x 15 Nos , 120 KN Disc insulators as directed by the field engineer at site(On LC condition) |
| 5 | Labour for stringing of 230 KV strung bus using Single zebra conductor, fixing Bolted type tension fitting (1Span -3ph x 1 Wire = 3 wires) including hoisting of insulators (Uder LC Condition). |
| 6 | Labour for stringing of 110 KV strung bus using Twin zebra conductor, fixing Bolted type Tension fitting & spacers (1Span -3ph x 2 Wire = 6 wires) and eye bolts etc.,) including hoisting of insulators(Under LC Condition). |
| 7 | Labour for erection of Bus bar including fabrication and any modification of end clamp and joint the bus wherewere necessary and as directed by the field Enhgineer.Using 75mm IPS Aluminium tube without bend(Under LC Condition) |
| 8 | Labour for providing Jumper / Dropper by Zebra ACSR Conductor(Under LC Condition) |
| 9 | Labour for loading /unloading/Shifting of materials without using Boards crane (One operation) - Non- Fragile |
| 10 | Labour for loading /unloading/Shifting of materials without using Boards crane (One operation) - Fragile |
| 11 | Hire charges for crane provided (12 Tonne) for any erection loading, unloading, or shifting of equipments , done by department. |
| 12 | Manufacturing and supply of bolt of required length of 18 - 20 mm dia GI rod including cost of GI rod and 2Nos GI nuts & washer as directed by the field Engineer. Grout bolt & Eye bolt. |
| 13 | Supply and provision of M8,M9,M10,M12, & M16 full thread GI bolt & nuts & GI Washer of various sizes for erection AB Switches & insulators and any other purpose wherever required and as dircted by the field Engineer. |
| 14 | Fabrication and fixing of bellmouth providing jumper connection in the solid core/PT insulators including the cost of GI pipe & other consumables & as directed by the field Engineer. |
| 15 | Supply of 100mmX10mm Al.flat bars for fitting switch end clamps and where ever necessary and as directed by the Field Engineer |
| 16 | Supply and fixing of flexible copper tape/rope of size 1 inch for interlinking panel earthing and for any other purpose, on any sizes,including the cost of copper lugs at both ends as directed by the field engineer. |
| 17 | Labour for dismantling of existing 230KV twin Kundha conductor strung bus (one span - 6 conductors) including Disc insulators, hardwares & ext., & released materials shifted to pocket store. (Under LC Condition) |
| 18 | Labour for dismantling of existing 230KV Kundha conductor strung bus (single conductor, one span - 3 Conductors) including Disc insulators, hardwares & ext., & released materials Handed over to SP koil SS.(Under LC Condition) |
| 19 | Labour for dismantling of existing 110KV Kundha conductor strung bus (Twin conductor, one span - 6 conductors) including Disc insulators ,hardwares & ext., & released materials Handed over to SP koil SS (Under LC Condition) |
| 20 | Labour for dismantling of existing, Aluminium bus bars, including end clamps & etc., for erection of new 75 mm Alu.bus bars.(Under LC Condition) & released materials Handed over to SP koil SS. |
| 21 | Labour for dismantling of existing, droppers & jumpers including end clamps & etc., for erection of new droppers & jumpers with zebra conductor. (Under LC Condition) & released materials Handed over to SP koil SS. |
| 22 | Labour for dismantling of Under hang insulator & SPT insulator. 230KV (On LC condition) |
| 23 | Labour for dismantling of Under hang insulator & SPT insulator. 110KV (On LC condition) |
| 24 | Transportation Charges including Toll Plaza charges for Equipments and their accessories, Control Cables, Conductors, Bus bars etc from GCC Ambattur Stores or GCC Sriperumbudur Stores or from Allotted stores or SS anywhere in Tamilnadu to SP Koil 230/110kV SS and vice versa using LCV Type Lorry like Asok Leyland/ TATA etc. Single axis truck. |
| 25 | Supply and fixing of `T`Clamp for Double zebra to double zebra confirm to latest IS. |
| 26 | Supply and fixing of `T`Clamp for Double zebra to single zebra confirm to latest IS. |
| 27 | Supply and fixing of `T` Clamp for single zebra to single zebra confirm to latest IS. |
| 28 | Supply and fixing of `T ` Clamp for75mm bus to Double zebra confirm to latest IS. |
| 29 | Supply and fixing of `T` Clamp for 75mm bus to single zebra confirm to latest IS. |
| 30 | Supply and fixing of Switch end clamp for 75mm bus bar confirm to latest IS. |
| 31 | Supply and fixing of Switch end clamp for double zebra confirm to latest IS. |
| 32 | Supply and fixing of Switch end clamp for single zebra confirm to latest IS. |
| 33 | Supply and fixing of Reduer clamp for 75mm bus to zebra confirm to latest IS. |
| 34 | Supply and fixing of Free end clamp for 75mm bus bar confirm to latest IS. |
| 35 | Supply and fixing of Corona cup for 75mm bus bar confirm to latest IS. |
| 36 | Supply and fixing of Seating block for 75mm bus bar confirm to latest IS. |
| 37 | Supply and fixing of 6 Bolted Tension fitting for zebra confirm to latest IS. |
| 38 | Supply and fixing of 75 mm joint clamp confirm to latest IS. |
| 39 | Supply and fixing of PG clamp for zebra confirm to latest IS. |
| 40 | Supply and fixing of Spacer clamp for zebra (225MM Spacing) confirm to latest IS. |
| 41 | CGST in % (For Bidders inside TamilNadu) |
| 42 | SGST in % (For Bidders inside TamilNadu) |
| 43 | IGST in % (For Bidders outside TamilNadu) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender