Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dhenkanal → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of Opd And 50 Bedded Ipd Building At Sdh Talcher, Angul Under Health Action Plan 2023-24.

BOQ

Name of Work:- Construction of OPD and 50 Bedded IPD Building at SDH Talcher, Angul under Health Action Plan 2023-24.
Sl. No. Item Description
1CIVIL WORKDismantling brick or stone masonry in lime or cement mortar above 3m height including stacking the useful materials for re-use and removing the debris with in 50m lead including cost of all labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge.
2Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge.
3Removing white wash or colour wash by scraping using sand papering and preparing the surface smooth including necessary repairs to scratches etc Including cost of all labour, sundries and T&P etc.complete in all respect as per the direction of Engineer-in-charge.
4Dismantling and removing old tiled flooring including removing the base course and stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge.
5Dismantling and removing old tiled cladding from walls including racking out joints 12 mm deep stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge.
6Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by manually means ,including loading , transporting, unloading to approved dumping ground within 5 Kms lead and lift.Including cost of all labour, sundries and T&P etc.complete in all respect as per the direction of Engineer-in-charge.
7Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead including cost of all labour with T&P etc. complete as per the specification and direction of the Engineer-in-charge.
8Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost of all labours, T & P, sundries etc. as required for the work complete as per the direction of the Engineer-in-charge.
9Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.Upto 1.5 Mtr Depth
10From 1.5 Mtr upto 3.0 Mtr Depth
11Disposal of building rubbish / malba /rock/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including all lifts involved.etc as per the direction of Engineer-in-charge.
12Filling available (excavated or stacked at site) earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering etc.all complete as per the direction of Engineer-in-charge.
13Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge.
14Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge.
15Fly Ash brick masonry in cement mortar (1:6) in foundation & plinth using Fly Ash bricks of 25 x 12 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge.
16Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.R.C.C. foundation and footing bases of columns mass concrete pre-cast slab etc.
17R.C.C. Grade beams
18R.C.C. Beams, columns, grider and bressmer etc.Stilt floor
19First Floor
20Second Floor
21Third Floor
22Fourth Floor
23Terrace
24R.C.C. Floor and Roof slab, landing, balconies up to 4.3Mtr. Height.Stilt floor
25First Floor
26Second Floor
27Third Floor
28Fourth Floor
29Terrace
30R.C.C. stairs excluding landing but including railing Stilt floor
31First Floor
32Second Floor
33Third Floor
34Fourth Floor
35R.C.C. Lintels.Stilt floor
36First Floor
37Second Floor
38Third Floor
39Fourth Floor
40Terrace
41R.C.C. Chajjas & sunshadeStilt floor
42First Floor
43Second Floor
44Third Floor
45Fourth Floor
46Terrace
47R.C.C. WallsStilt Floor
48Supplying Cutting, straightening coiled or bent up M.S. Rod or tor steel of primary steel producers such as SAIL / Tiscon / RINL / JINDAL STEEL / SHYAM STEEL (grade Fe-500D) etc. including bending, binding, welding, wastage & over lapping and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors with labour cess etc. (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge.Stilt floor
49First Floor
50Second Floor
51Third Floor
52Fourth Floor
53Terrace
54Fly Ash brick masonry in cement mortar (1:6) in super structure using Fly Ash bricks of 25 x 12 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge.Stilt floor
55First Floor
56Second Floor
57Third Floor
58Fourth Floor
59Terrace
60Fly Ash brick masonry in cement mortar (1:4) in super structure using Fly Ash bricks of 25 x 12 x 8 cm size having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge.First Floor
61Second Floor
62Third Floor
63Fourth Floor
64Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge.Stilt floor
65First Floor
66Second Floor
67Third Floor
68Fourth Floor
69Terrace
70Providing 16 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge.Stilt floor
71First Floor
72Second Floor
73Third Floor
74Fourth Floor
75Terrace
76Providing 6 mm thick cement plaster with cement mortar of mix (1:4) with screened and washed sharp sand for mortar and finished smooth to R.C.C. work after closed deep chipping & slurry treatment including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour, T&P, and scaffolding required for the work etc. complete in all respect as directed by the Engineer in charge.Stilt floor
77First Floor
78Second Floor
79Third Floor
80Fourth Floor
81Terrace
82Providing 2.5cm thick Grading Concrete over roof slab with cement concrete (1:2:2) using 6mm size black hard granite crusher broken chips and screened & washed sharp sand for mortar and finished smooth to the rough surface of slab including watering and curing with cost, conveyance, royalties of all materials with cost of all labour, labour cess and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. Terrace
83Supplying, fitting and fixing vetrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mm x 600mm Color / Printed series (Homogenous) of approved make (JOHNSON /RAK / SOMANY/ KAJARIA) in floors on 20mm thick bed of C.M. (1:4) (1cement:4course sand) and filling the joint with white cement mixed with pigment to match the shades of the tile including cost of all materials, labour, labour cess, T&P etc. required for the work complete in all respect as directed by the Engineer in charge.Stilt floor
84First Floor
85Second Floor
86Third Floor
87Fourth Floor
88Providing, fitting, fixing vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mm x 600mm plain (Ivory) of approved make (JOHNSON /RAK / SOMANY/ KAJARIA) as directed by Engineer-in-charge in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete with cost, conveyance, royalties of all materials all labour,labour cess complete in all respects as directed by the Engineer in charge.Stilt floor
89First Floor
90Second Floor
91Third Floor
92Fourth Floor
93Supply and installation of 2mm Electrostatic dissipative flooring of Robust E17 as per selected shade Dissipative homogeneous PVC floor covenings in rolls or Tiles with permanent antistatic properties less than 2 KV The value of the electrical resistance is in the range of 106 to 1080 of Standards EN 1081 Static Electrical propensity less than 2 And as per standards EN1815. Abrasion Value according to EN 660.2 less than or equal to 4.0 mm3, group M. Fire class Bffs1, load class 34/43. After 28 days the TVOC 10 µg/m3 according to ISO 16000-6. REACH compliant ISO717-2 Weighted improvement of impact sound inslation is 4db. Price includes supply, welding rod. 30mm coming transportation(make-Gerfloor, Aeroceil) installationFirst Floor
94Fourth Floor Please Enable Macros to View BoQ information
95Fourth Floor Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58636316
AUTHORITY Government Departments
TENDER VALUE 23.68 Crore
LAST DATE 04-12-2026
Authority
Authority Name Civil Division
Work Description Tender for Construction Of Opd And 50 Bedded Ipd Building At Sdh Talcher, Angul Under Health Action Plan 2023-24.
Basic Detail
Tender No CE Bldg-I-43 / 2026-27
Bidding Type Tender
Location
City Dhenkanal
State Odisha
Key Dates
Publish Date 20 Nov 2026
Submission Date 04 Dec 2026
Open Date 05 Dec 2026
Finance
Tender Value 23.68 Crore
Tender Fee 10000
EMD 23.69 Lakhs
Exemption Available
Document List
2421827f-5351-4c16-9d21-309ffc50e77f.html
BOQ_622639.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Dec 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
html

2421827f-5351-4c16-9d21-309ffc50e77f.html

xls

BOQ_622639.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender