Tender For Repair, Renovation, Addition, Alteration And Upgradation Of Existing Facilities At Government Hospital, Diu
Tender Value
4.07 Crore
Estimated cost
Bid Submission
07 Dec 2026
15 days left
EMD
8.15 Lakhs
Bank guarantee accepted
Document Fee
1500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Diu → Daman and Diu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair, Renovation, Addition, Alteration And Upgradation Of Existing Facilities At Government Hospital, Diu
BOQ
| Sl. No. | Item Description |
| 1 | Works |
| 2 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. |
| 3 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. |
| 4 | FILLING with selected & approved available excavated earth (exluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 5 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 6 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge |
| 7 | Providing and laying Granular subbase (GSB) for preparing base of road, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required by providing close graded Material, mixing in a mechanical mix plant at OMC(Optimum Moisture Content), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete. |
| 8 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. |
| 9 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Foundations, footings, Base of columns and Mass concrete, as directions of Engineer in charge Complete.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 10 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 11 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Lintels,Beams,Girders and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 12 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.200 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel ,scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs ,landing, shelves, Balconies, Lintels, Beams, Girders and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 13 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs, landing, shelves and Cantilever etcand including admixture complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 14 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering, scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Staircases, as directions of Engineer in charge Complete.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 15 | Providing, laying and fixing in position REINFORCEMENT High yield deformed bars/TMT/CRS/FE500D for R.C.C. works at all levels including cutting, bending and binding with 16 gauge M.S. annealed wire, providing cover blocks of C.M. 1:2 Embedded with binding wire etc.applying expoxy based chemical coating steel. complete. The reinforcement detailing to IS 456 or, if specified by engineer, shall conform to IS: 13920 (Ductile detailing of R. C. Structures), bars as per IS 1786 the rate shall be inclusive of executing such detailing. Laps to be measured shall be as shown in drawing and for reinforcement length longer than available in market. Chairs, pins and laps other than that specified shall not on be measured and paid for. No extra to be paid for height, rate remains same at all levels, complete as per drawings, specification, direction of engineer-incharge. Make: TATA, SAIL, JSW, or EQUIVALENT. |
| 16 | Providing fusion bonded Epoxy coating not less than 175 micron thickness and up to 300 micron to reinforcement bars as per IS- 13620-1993/ASTM-775 M including testing of coating at plant and all taxes as directions of chief engineer in charge Complete. (A) 8mm to 32mm dia bar |
| 17 | Providing material & labour for laying Rebar in Existing Column, Beam and Slab including all dia. Of bars 8mm to 32mm as per drawing and specification as directions of Chief Engineer in charge Complete. Make Hilti or Fischer or its equivalent as approved by engineer-in-charge |
| 18 | Providing and constructing White Stone Bela Masonry block work in superstructure, in courses, using approved quality white stone, laid in cement mortar 1:6 (1 part cement : 6 parts coarse sand), including dressing and proper bonding of stones, filling and packing of joints, maintaining line, level and plumb, and all necessary materials, labour, scaffolding, curing, tools and equipment, complete in all respects as directed by the Engineer-in-Charge. |
| 19 | Providing and fixing wooden office partition made of approved quality Aluminium frame of required sections, including 12 mm thick BWR grade plywood on both sides, finished with 1.0 mm thick decorative laminate of approved shade and make on exposed surfaces and balancing laminate on the inner surfaces, complete with necessary beadings, screws, nails, adhesive, hardware, and all fittings. The partition shall include glazing with 5.5 mm thick clear glass wherever required, complete with polishing/painting of exposed wooden members, making necessary openings for doors/windows, with Aluminium framing and all labour, materials, tools, tackles, scaffolding, transportation, and incidental works complete as directed by the Engineer-in-Charge. |
| 20 | Providing and laying 10mm thick in single coat CEMENT PLASTER in (i)Cement mortar 1:3 (1-cement:3-sand) at all height/all floors to internal surfaces of all elements, walls, R.C.C. work, Ceiling,[backing coat at places where glazed or ceramic tiles are to be fixed etc]. including hacking of concrete surfaces, racking of joints, scaffolding, curing, providing chicken mesh at all necessary joints, etc. complete. Final finished surface shall be little rough , so it has proper bonding to paint putty.The surfaces to be plastered to be hacked immediately on de-shuttering. The Brick/ RCC surface to be plastered to be cured sufficiently before start of plaster. Initial bare surface area to be Plastered shall be measured for payment unless noted otherwise, etc as directions of Engineer in charge Complete. |
| 21 | Providing and laying 20mm thick SANDFACED CEMENT PLASTER of required grain finishing upto all height/all floors including grooves, pattas etc. in two coats having the the base coat of not less than 12 mm thickness in CM 1:3 (1-cement : 3-sand) & finished coat 8 mm thk, in CM 1:1 (1-cement : 1-sand) to external surfaces of concrete & masonry including hacking of concrete surfaces, racking of joints, scaffolding, curing, providing chicken mesh at all necessary joints, etc. complete. Rate shall include addition of “Impermo” water proofing compound or equivalent as approved by engineer-in-charge, providing, adding & mixing of fine fibrillated 100% virgin polypropylene fibers in cement mortar to form homogeneous mixture @125 gms per a bag of cement in both the coats of plaster, 12mm long fibers shall be used in first coat & 6mm long fibers shall be used in second finished coat. providing drip mould 40mm wide and 12mm thick in cement mortar 1:3 on soffit of chajjas, canopies, gutters etc.complete. as directions of Engineer in charge Complete.The surfaces to be plastered to be hacked immediately on de-shuttering. The Brick/ RCC surface to be plastered to be cured sufficiently before start of plaster. Initial bare surface area to be Plastered shall be measured for payment unless noted otherwise, etc as directions of Engineer in charge Complete. |
| 22 | Providing material and labor for applying Two coats of gypsum including providing grooves at all the edges of windows/Doors with neat finish on new wall surface to give an even shade including thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered smooth.make the surface uniform and levelled and must be without any undulation as directed by engineer in charge complete.Make: Diamond gypsum or its equivalent. |
| 23 | Providing material and labor for applying Two coats of acrylic putty upto desired thickness for getting undulation free surface and accurate plumbness in walls. including providing grooves as per architectural drawings at all the edges of windows/Doors with neat finish on new/existing wall surface Work includes surface cleaning, removal of loose particles, minor leveling, and application of putty in one or more coats to accurately achieve the required thickness. After proper curing, the surface will be sanded to a smooth, even finish suitable for painting. Thickness will be checked for accuracy throughout the application to ensure compliance with project specifications. |
| 24 | Providing material & labour for Internal Wall painting (two coats) with Luxury Emulsion of approved brand and manufacture including suitable primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. One component waterborne 100% pure acrylic interior eggshell emulsion that must offer protection against different varieties of bacteria and fungus. Paint should free of HCHO, APEO and have crack bridging property of min 0.9 mm with class 1 flame spread resistance The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Asian paint Royale series or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or equivalent.Guidelines for application1. Surface Preparation - Inspection: Assess the wall surface for defects like cracks, moisture, or old paint layers. All imperfections must be fixed before starting the painting process. - Cleaning: Clean the wall to remove dust, grease, and loose particles. Use a mild detergent solution or a vacuum to ensure a clean surface. - Repair: Fill cracks, holes, and other imperfections with a suitable filler (e.g., putty or spackle). Sand the area smooth after drying. - Priming: Apply a suitable primer to the wall to ensure proper adhesion of the artistic paint. Choose a primer based on the wall material (e.g., masonry, drywall, plaster). Allow the primer to dry according to the manufacturer's instructions. 3. Application Process - Base Coat: - Apply a base coat of paint, using a roller for large areas and a brush for edges and corners. Choose a base color that complements the final artistic design. - Allow the base coat to dry completely - Artistic Painting: - As per details provided by architect, Plan the design by sketching it lightly on the wall with a pencil or chalk & get necessary approval from architect or engineer-in-charge. Post approval proceed for final application. 4. Finishing - Sealing (Optional): Apply a clear sealer or varnish over the artwork for added protection, a matte, satin, or gloss finish based on the desired effect.6. Quality Standards - Adhesion: Paint should adhere firmly to the wall without peeling or flaking. - Finish: The final surface should be even, free of brush marks, and match the intended artistic design. - Durability: The painted surface should withstand normal wear and cleaning without damage |
| 25 | Providing material & labour for Internal Wall painting (two coats) with Acrylic Emulsion of approved brand and manufacture including primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. One component waterborne 100% pure acrylic interior eggshell emulsion that must offer protection against different varieties of bacteria and fungus. Paint should free of HCHO, APEO and have crack bridging property of min 0.9 mm with class 1 flame spread resistance The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Fenomastic Hygiene Emulsion Silk of Jotun Paints or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun , Asian Paints, Berger Paints, Dulux Paints or equivalent. |
| 26 | Supplying & Providing two coat of primer and two coats of ANTIFUNGAL PAINT, water proof, dust proof Paint on Exterior Surfaces at all heights of surfaces. One component waterborne 100% pure acrylic emulsion that offers protection against concrete carbonation with an R Value of min 600m and an equivalent concrete layer thickness value of min 150cm. Paint should have crack bridging property of min 1.85 mm with Solar Reflective index of min 110 and IR reflectance property. The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike Carbon Dioxide Diffusion resistance, resistance to chloride diffusion, crack bridging and liquid water/ vapour transmission as well as SRI properties. The product can be like Jotashield WaterXtreme Topcoat of Jotun Paints or approved equivalents.Two Coats of above paint should be applied using a conventional Roller / Airless spray at the site after application and curing of applied Primer.including cleaning, preparing the surface, applying primer - scraping by sandpaper, scaffolding etc. including - (a) All surface preparation, suitable number of base coats required, primers and suitable finishing to the complete satisfaction of the Engineer in Charge, (b) Scaffolding and all leads and lifts,(c) Proper curing in between the two subsequent coats, (d) Touch ups to the paint after the scaffolding is removed, (e) All measurements for paints to be as per IS-1200. f) Minimum Guarantee of Ten Years Waterproofing and Paint performance for all external paints by manufacturer .For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.Make - Asian Paint Ultima Allura Torino, Jotun Jotashield Tex Fine OR Equivalent. |
| 27 | Providing and fixing lead-lined plywood Panelling for X-ray radiation protection to walls, partitions and ceilings wherever required, including supply and installation of lead sheets of specified thickness and lead equivalence, securely bonded/fixed to the approved plasterboard or plywood substrate. The item shall include all necessary framing, fixing accessories, screws, fasteners, cutting, drilling, jointing, overlapping of lead at all joints, corners and junctions, sealing of gaps and openings, and proper treatment around electrical, HVAC, plumbing and other service penetrations to maintain uninterrupted radiation shielding. The work shall be carried out in accordance with approved X-ray shielding drawings, specifications and radiation protection requirements, including all labour, materials, tools, equipment, wastage and incidental works, complete in all respects to the satisfaction of the consultant/engineer in charg. |
| 28 | ALUMINIUM WORKS -Doors and Windows workProviding material and labour for fixing in position frames, shutter for any type of aluminium work for any type of door, window, partition, made out of any type of aluminium sections of approved make having minimum 50 micron pure polyester powder coating of approved shade, texture & colour of approved make for all floors, all levels, all heights, all shapes, all sizes including cutting, bending, crimping, fabricating in best workmanship manner etc as per the drawing, specification and as directed by Architect or Engineer-in-Charge. Contractor shall prepare shop drawing based on concept drawing and get approved from the consultants before procurement of material. All loose material shall be approved. Mockup of one/two window shall be executed as per approved shop drawing with all hardware. Work shall carried out as per the approved shop drawings, approved mock-up and approved sample. Actual weight of installed Aluminium sections (for using fabrication without considering any wastage) shall only be measured and shall be considered for the payment. Glazing shall be paid as seperate item. Contractor shall provide guarantee for stability, water tightness etc for 12 months after defects liability period. Rate shall be inclusive of providing aluminium sections, cutting, fabrication, errection and fixing to the best workmanship manner, including 1) Sheet metal screws and casted solid aluminum corner cleats fixed with external byttins with a spring for rapid and secure joint assembly for casement and sliding shutter and frame; 2) Glazing clips for receiving infill panel; 3) Best quality wool pile where ever shutter touches the frame and compatible microwave cured EPDM rubber; 4) Dash Anchor fasteners of HILTI HRDUGT or equivalent for fixing the frame assembly to the RCC or masonry surfaces. Minimum 1 anchor fastener shall be used for every 600 mm length of section for stability of frame. 5) 10mm GI tie rod for connecting vertical stile at top and bottom for aluminum door shutter and 4mm thick solid aluminium corner cleat of full thickness of section for connecting style and horizontal rails; 6) providing and fixing packing (rough ground) in full periphery/ at every 600mm c/c with average 6 mm thick PVC spacer/ compact sheet of width (equal to section width less 30mm for backer rod and sealant); 7) Filling the gap between wall and frame on both sides (outside and inside) with polyethylene baker rod of avg. 10 mm thickness of approved make and color and then sealing the remaining gap with neutral grade G/M (Glazed & Metal) weather silicon sealant of approved make and color. 8) Termite treated seasoned teak wood as infill material to installe hardware in door shutter and frame as and when required, etc as per directions of Engineer in charge Complete. Make:- Jindal or equivalent as approved by Engineer-in-charge |
| 29 | Providing & Fixing Louvers and Fins (made out of Aluminium Section)Providing, fixing, designing aluminium fixed louver of any type of louver section of approved make having minimum 50 micron polyster powder coating on all the surfaces of approved shade, texture & make as per manufacturer's specifications. Contractor shall submit the shop drawing for louver/ fins based on concept design/ drawing and as per elevation. Aluminium louver section shall be fixed on aluminium framing/ carrier/ panel/ GI clip and necessary sub structure with required fastners, hardware as per approved shop drawing etc complete for all floor, all height including scaffolding as directed by engineer in charge. Louver, framing and sub structure shall be in proper line, level and plumb. Necessary MS work shall be paid in relevant tender item. |
| 30 | Providing and fixing 6mm thick one-way reflective float glass of approved make, colour and shade, installed in aluminium/UPVC/MS/wooden window frames, including all necessary accessories, labour and materials, complete as directed by the Engineer-in-Charge.The glass shall be 6mm thick float glass with one-way reflective coating, also known as vision-control or reflective glass, allowing one-way visibility during daytime. The glass shall be free from bubbles, scratches, waves, spots or manufacturing defects. The colour/shade such as blue, green, bronze, silver, smoke grey or any other shall be as approved.The one-way reflective coating shall be durable, non-peeling, scratch-resistant and vacuum-deposited or hard-coated. All glazing work shall comply with IS 14900 (Safety glass and glazed systems) and applicable provisions of IS 2553 (Part 1) for architectural glazing. Glass shall be cut to accurate sizes with machine-finished edges.The glass shall be fixed using EPDM rubber gasket, approved neutral-cure silicone sealant or snap-fit glazing beads, depending on the type of frame system. All sealing shall be dust-proof, water-tight and free from vibration gaps. Necessary accessories shall be corrosion-resistant.The scope includes cutting, wastage allowance, transportation, handling, scaffolding, installation materials and cleaning of glass after fixing. Protective film, if provided, shall only be removed after final inspection and approval.Measurement shall be taken in square metres (m²) of the actual glazed area fixed in position. The cost of window frames, beads or supporting systems shall be paid separately, wherever applicable.Approved makes include: Saint-Gobain, Asahi India (AIS), Guardian, Pilkington, Modi Guard, or another equivalent make as approved by the Engineer-in-Charge. |
| 31 | Providing and fixing lead-lined HPL door shutter suitable for radiation-protected hospital areas, comprising solid-core/engineered door shutter of 40 mm overall thickness, internally lined with 2.0 mm thick lead sheet providing 2.0 mm Pb lead equivalence, with both faces finished with high-pressure laminate (HPL) of approved make, colour, shade and texture.The door frame shall also be suitably lead-lined with 2.0 mm thick lead sheet / 2.0 mm Pb equivalence, with continuous lead protection at the shutter-frame junction and adequate overlap to prevent radiation leakage. The complete door set shall include heavy-duty hinges, mortise lock, lever handles, hydraulic door closer, door stopper, required beading, sealant, screws, fasteners and all other necessary hardware and accessories.The lead lining shall be continuous and properly jointed/overlapped, and the complete installation shall be carried out strictly as per the approved radiation-shielding design and applicable requirements of the competent radiation-safety authority. Complete in all respects as per approved drawings, specifications and instructions of the Engineer-in-Charge. |
| 32 | Providing and fixing 35mm thick factory-made solid core door shutter with block board core construction, infill of solid wood strips/blocks placed edge to edge having wooden strips of pine wood or any softwood, seasoned and treated, core sandwiched between two veneers/face plywood layers on both sides. Door manufactured as per IS: 2209 / IS: 1659 and hot-pressed using BWP grade synthetic resin adhesive conforming to IS: 848. The shutter shall have continuous stiles and rails, properly pressed and bonded, with hardwood lipping/edge banding on all exposed edges, fixed using approved adhesive and machine-finished as per IS: 4020 (test requirements).The shutter surface shall be factory-prepared to receive 1mm thick synthetic decorative laminate conforming to IS: 2046 (laminate to be paid separately).The rate shall include: complete manufacturing, block board core, stiles/rails, edge lipping, adhesive, edge finishing, and quality compliance as per IS standards.Note: Decorative laminate finish, door frame and all architectural hardware (hinges, locks, handles, door stopper, tower bolts, etc.) shall be paid separately under respective tender items. |
| 33 | Providing and fixing 35mm thick factory-made solid core door shutter with block board core construction, infill of solid wood strips/blocks placed edge to edge having wooden strips of pine wood or any softwood, seasoned and treated, core sandwiched between two veneers/face plywood layers on both sides. Door manufactured as per IS: 2209 / IS: 1659 and hot-pressed using BWP grade synthetic resin adhesive conforming to IS: 848. The shutter shall have continuous stiles and rails, properly pressed and bonded, with hardwood lipping/edge banding on all exposed edges, fixed using approved adhesive and machine-finished as per IS: 4020 (test requirements).The shutter shall be provided with a small glazed vision panel/window of suitable size, approximately 300 mm × 300 mm, suitably positioned in the door shutter to enable clear visual observation from inside to outside and outside to inside. The vision panel shall be provided with suitable clear toughened/safety glass, securely fixed with hardwood/approved beading and glazing sealant, complete with neat and flush finishing. The vision panel opening shall be properly reinforced and integrated into the door shutter without affecting its structural strength.The shutter surface shall be factory-prepared to receive 1mm thick synthetic decorative laminate conforming to IS: 2046 (laminate to be paid separately).The rate shall include complete manufacturing, block board core, stiles/rails, edge lipping, adhesive, vision panel frame/beading and fixing of clear safety glass, edge finishing and quality compliance as per relevant IS standards. |
| 34 | Providing and fixing 1.0 mm thick decorative laminate of approved make and shade, conforming to IS: 2046, on door shutters, partitions, cupboards, paneling or any other wood/board surface. The laminate shall be fixed using premium grade synthetic resin adhesive (Fevicol SH / SR type as applicable), confirming to IS: 851 or IS: 848, including proper surface preparation, edge finishing and complete workmanship.The laminate shall be machine pressed evenly to avoid air pockets and undulations, and all exposed edges shall be finished smooth and aligned to adjoining surfaces. Sharp corners shall be rounded as required to avoid peeling. The rate shall include cutting, edging, finishing of cutouts for handles/locks, provision of wooden lipping where required cleaning of adhesive residue, and final polishing/waxing where required.The laminate shall be free from waviness, bubbles, ripples, cracks and manufacturing defects and shall be provided only after approval of design, texture and shade by the Engineer-in-Charge.Rate shall include: Laminate sheet, adhesive, complete fixing, finishing at edges and cutouts, cleaning and final finishing.Note: Base surface such as plywood/MDF/block board/door shutter, and lipping/edge banding shall be paid separately under respective tender items. |
| 35 | Notes for Hardware : Supplying and fixing heavy quality fixtures and fittings for doors, windows, ventilators, partition wall, cabinets with necessary screws, nails, machine pins etc at all floor/ all levels/ all heights complete. Sample shall be approved by Architect before execution. As per description, SS hardware shall be of 304 grade or 316 grade as per item description and as per approved sample. The fixture & fastenings shall be provided as under :Providing material and labour for fixing single/ double action hydraulic floor spring with SS cover plate & adjustable concealed casted top pivot (two piece) and bottom strap of approved make for wooden/ aluminium doors of minimum 100kg capacity with minimum one year guarantee. Rate shall be inclusive of cutting of floor neatly, grouting the floor spring & cleaning/ polishing the floor & maintaining in good working condition until defect liability period. In case of Aluminium shutter bottom arm of floor spring & top pivot shall be firmly fixed in the aluminium members using required size of teak wood by making rabbet in the wood. The Floor Spring shall conform to EN 1154. a) Hold open having for shutter width upto 1200mm with standard spindle and cover plate. Closing force complying with EN 1154 2-4 |
| 36 | Providing & Fixing heavy quality SS 304 heavy pivot top & bottom (pair) of approved make with SS screws ect complete as directed by engineer in charge. |
| 37 | Providing material and labour for fixing hydraulic rack and pinion door closer with standard arm (Silver finish) with screws to pivoted/ hinged door of approved make for specified door width with minimum 100kg capacity and one year guarantee. All adjustment screws face fixed. Rate shall be inclusive of fixing with using the template as per manufacturer’s specification & maintain in good working condition until defect liability period. The door closer shall conform to EN 1154 standard.a) with standard/ hold open arm with two independent closing valves and latching speed adjustable by arm without mounting back plate, Closing force complying with EN 1154 2 - 4 for up to 900 mm door shutter width |
| 38 | Providing material and labour for fixing SS 316 grade butt hinge of average 100 x 75 x 3 mm - with ball bearing of approved make as per approved sample with necessary screws etc. complete for all floor all height all level as directed by Engineer in Charge. |
| 39 | Providing material and labour for fixing set of dead lock of approved make with 50mm backseat, 20mm square for end with 72 mm centers including strike plate in satin stainless steel finish as per DIN 18251-1, grade 2 and prepared for euro profile cylinder (EPC) including strike plate and EPC length 60/70 mm standard Euro profile Pin Cylinder/ Half pin cylinder with both side key/ one side key one side knob operation with one pair of SS 316 grade Escutcheons (key hole plate) for wooden/ aluminium/ metal doors with necessary SS Phillips head screws etc complete for all floor, all level, all height as per approved sample and as directed by engineer in charge. The lock shall be with 3 keys. |
| 40 | Providing material and labour for fixing SS 304 satin finished set of narrow style dead lock of approved make with 25mm /35 mm set back necessary euro profile pin cylindrical lock 60/ 70 mm for Key and or knob operation and one pair of SS 316 grade Escutcheons (key hole plate) for aluminium door with necessary SS Phillips head screws etc complete for all floor, all level, all height as per approved sample and as directed by engineer in charge. The lock shall be with 3 keys. |
| 41 | Providing material and labour for fixing Mortise lock of approved make having 72mm centre to centre, 55mm Backset 20mm Square forend and 60/ 70mm standard Europrofile Pin Cylinder with both side key /one side key - one side knob operation and SS 316 grade hollow tubular pipe pair of Mortise handle of 22mm dia 150mm long with a pair of SS 304 Escutcheons (key hole plate) for wooden /aluminium/ metal doors with necessary ss phillips head screws etc complete for all floor, all height, all level as per approved sample as directed by engineern in charge. The lock shall be with 3 keys. |
| 42 | Providing material and labour for fixing Mortise shaft dead bolt of approved make with key (Alen Key lock), sleeve with 57mm backset and 25mm square forend in stainless steel satin finish etc complete for all floor, all height, all level as per approved sample and as directed by engineer in charge. |
| 43 | Providing material and labour for fixing SS 316 grade push-pull pair of handle of size 200 mm long x 19mm dia made out of satin (brush) finish hollow pipe of 1.5mm thick having offset type (C or D shape)/ H-shape/ D-shape of approved make with necessary screws etc. complete for wooden doors/ aluminium doors/ metal doors for all heights, all floors and all level as per approved sample and as directed by Engineer-in-charge. Rate shall be The length of handle should be perfect center to center as below specified. |
| 44 | Providing material and labour for fixing SS 316 grade handles 150mm long D shape hollow tube handle of approved make with both end bracket with necessary screws etc. complete for all floor, all height, all level as per approved sample and as directed by engineer in charge. |
| 45 | Providing and Fixing SS 304 Grade Satin Finish 1.8 mm Thickness Aldrops of 16 mm dia x 250 mm including 3 nos. fixing Bracket and 1 NOS. locking bracket of approved make with necessary MS nickle Plating Bolts etc. complete for all floor, all height, all level as per approved sample and as directed by engineer in charge. |
| 46 | Providing and Fixing SS 304 Grade Satin Finish 1.8 mm Thickness Tadi of 12mm dia x 200mm including 3 nos.fixing Bracket of approved make with necessary screws, pins, bolts etc. complete for all floor, all height, all level as per approved sample and as directed by engineer in charge. |
| 47 | Providing material and labour for fixing SS 304 brush finish solid Door Stopper with magnet, fixed type, wall mounted (square/ round) of approved make with necessary screws etc. complete for all floor, all height, all level as per approved sample and as directed by engineer in charge. |
| 48 | Providing material and labour for fixing SS 304 grade brush finish solid Door bufer with pvc base, wall mounted (square/ round) of approved make with necessary screws etc. complete as approved by Engineer-in-charge in Charge. |
| 49 | Providing and executing cleaning of existing chamber/duct area including removal of debris, rubbish, loose soil and unwanted materials, disposal of surplus material at approved location, dressing and levelling of existing soil/subgrade to required levels and compaction; providing and laying Plain Cement Concrete (PCC) of specified grade and thickness over prepared/compacted surface, including mixing, laying, compacting, finishing and curing complete; providing and laying Kota stone flooring of approved quality and specified thickness over prepared PCC bed, including cutting, dressing, laying to required slope/level, fixing with cement mortar, jointing, rubbing, grinding, polishing and final cleaning, complete in all respects as directed by Engineer-in-Charge. |
| 50 | Providing and fixing hospital-grade homogeneous vinyl flooring of 2 mm thickness, of approved make, colour, shade and pattern, comprising high-quality PVC/vinyl flooring sheets, seamless, non-porous, hygienic, antibacterial, stain-resistant, abrasion-resistant and suitable for heavy hospital traffic. The flooring shall be laid over properly prepared, smooth, clean and levelled substrate using approved adhesive, with all joints hot-welded to form a continuous seamless and impervious surface. The work shall include surface preparation, primer wherever required, approved adhesive, cutting, laying, joint welding, 100 mm high coved skirting/upturn at walls, finishing, cleaning and all necessary materials, accessories, labour, tools and tackles, complete in all respects as per manufacturer's specifications, approved drawings and instructions of the Engineer-in-Charge. |
| 51 | Providing and Fixing Vitrified Floor Tiles (600×600mm, 10mm Thick) with work includes providing and fixing vitrified tiles of size 600×600 mm and 10 mm thickness, of approved make, shade, pattern and finish, conforming to IS:15622 (Vitrified Ceramic Tiles). Tiles shall have water absorption less than 0.08%, uniform in colour, thickness and tone, and shall be free from cracks, bends, edge chips or surface defects. The type of finish such as double charge, nano polished, matt shall be as directed by the Engineer-in-Charge.Before fixing, the existing floor or base surface shall be cleaned properly and made free from dust, grease or loose material. Any unevenness on the surface shall be corrected by applying cement mortar in proportion 1:4 (1 cement: 4 coarse sand). In case the tiles are laid over cement concrete flooring, the surface shall be well roughened and washed before laying. Tiles fixed using 20 mm average thick cement mortar 1:4 or using approved polymer-modified tile adhesive. When laying over mortar, cement slurry shall be applied on the back of the tile at the rate of 3.3 kg per sqm to ensure proper bonding. If adhesive is used, tiles shall be fixed strictly as per manufacturer’s instructions to ensure full bedding support without voids.Tiles shall be laid in proper line and level, with joints kept uniform. After laying, tile joints shall be neatly grouted using white or coloured cement mixed with matching pigments. The surface shall be cleaned immediately after fixing to remove mortar stains, adhesive marks or grout residues. Upon completion of work, the entire flooring shall be cleaned with a soft detergent and maintained until curing is completed. Care shall be taken to avoid damage, cracking or chipping of tiles during execution.The contractor shall provide tile samples before procurement and only the approved sample shade and batch shall be used at site. The quantity shall be measured in square metre of finished work, and the rate quoted shall include the cost of tiles, adhesive or mortar, grouting material, cutting, wastage, labour charges, curing, cleaning, loading, unloading, transportation and all other incidental works required to complete the job in all respects.Make: Nitco, Simpolo, Kajaria, johnson, Rak or as approved by engineer-in-charge complete. Please Enable Macros to View BoQ information |
| 52 | Providing and Fixing Vitrified Floor Tiles (600×600mm, 10mm Thick) with work includes providing and fixing vitrified tiles of size 600×600 mm and 10 mm thickness, of approved make, shade, pattern and finish, conforming to IS:15622 (Vitrified Ceramic Tiles). Tiles shall have water absorption less than 0.08%, uniform in colour, thickness and tone, and shall be free from cracks, bends, edge chips or surface defects. The type of finish such as double charge, nano polished, matt shall be as directed by the Engineer-in-Charge.Before fixing, the existing floor or base surface shall be cleaned properly and made free from dust, grease or loose material. Any unevenness on the surface shall be corrected by applying cement mortar in proportion 1:4 (1 cement: 4 coarse sand). In case the tiles are laid over cement concrete flooring, the surface shall be well roughened and washed before laying. Tiles fixed using 20 mm average thick cement mortar 1:4 or using approved polymer-modified tile adhesive. When laying over mortar, cement slurry shall be applied on the back of the tile at the rate of 3.3 kg per sqm to ensure proper bonding. If adhesive is used, tiles shall be fixed strictly as per manufacturer’s instructions to ensure full bedding support without voids.Tiles shall be laid in proper line and level, with joints kept uniform. After laying, tile joints shall be neatly grouted using white or coloured cement mixed with matching pigments. The surface shall be cleaned immediately after fixing to remove mortar stains, adhesive marks or grout residues. Upon completion of work, the entire flooring shall be cleaned with a soft detergent and maintained until curing is completed. Care shall be taken to avoid damage, cracking or chipping of tiles during execution.The contractor shall provide tile samples before procurement and only the approved sample shade and batch shall be used at site. The quantity shall be measured in square metre of finished work, and the rate quoted shall include the cost of tiles, adhesive or mortar, grouting material, cutting, wastage, labour charges, curing, cleaning, loading, unloading, transportation and all other incidental works required to complete the job in all respects.Make: Nitco, Simpolo, Kajaria, johnson, Rak or as approved by engineer-in-charge complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender