Bids Are invited for Operation And Maintenance Power House / Power Plant - Complete System - Round The Clock Operation & Maintenance And Routine & Breakdown Maintenance Of Permanent Station Lighting System The Lighting Systems & Installation Of New E
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Power House / Power Plant - Complete System - Round The Clock Operation & Maintenance And Routine & Breakdown Maintenance Of Permanent Station Lighting System The Lighting Systems & Installation Of New Electrical Points, Light Fittings/Fixtures, Lighting Transformers, Welding Receptacle, Electrical Wiring To Provide New Connection, Erection/Repair Of G.I. Conduit Pipe Etc , Jointing And End Termination Of Control Cables Of All Sizes , Jointing And End Termination Of Lt Power Cables Of All Sizes , Jointing And End Termination Of Ht Power Cables Of All Sizes , Routine And Preventive Maintenance Of Ht, Lt& Dc Motors Of Main Plant And Ahs ,Offsite Bop Area And Awrs,Ctps , Lt Motor (<=2.2Kw) Attend Defect , Lt Motor (>2.2-5.5Kw) Attend Defect , Lt Motor (>5.5-18.5Kw) Attend Defect , Lt Motor (>18.5-37Kw) Attend Defect , Lt Motor (>37-55Kw) Attend Defect , Lt Motor (>55-90Kw) Attend Defect , Lt Motor (>90Kw) Attend Defect , Dc Motors(<=10Kw)-Attend Defect , Dc Motors(>10-20Kw)-Attend Defect , Dc Motors(>20Kw) Attend Defect , Lt Motor (<=5.5Kw) Connection , Lt Motor (>5.5-18.5Kw) Connection , Lt Motor (>18.5-37Kw) Connection , Lt Motor (>37-55Kw) Connection , Lt Motor (>55-90Kw) Connection , Lt Motor (>90Kw) Connection , Ht Motors Terminal Connection / Disconnection , Lt Motor (<=10 Kw) Shifting/Replacement , Lt Motor (>10- 30 Kw) Shifting/Replacement , Lt Motor (>30-75Kw) Shifting/Replacement , Lt Motor (>75-90 Kw) Shifting/Replacement , Lt Motor (>90Kw) Shifting/Replacement , Miscellaneous Machining/ Repairing Works , Rewinding Of 3-Phase 440V Induction Motor , Up To1.0 Kw , Above 1.0 Kw Up To 5 Kw , Rewinding Of Single Phase 240V Ac Induction Motor , Up To 1.0 Kw , Rewinding Of 220V Dc Motor/Generator , Up To 1 Kw , Round The Clock Maintenance And Routine & Preventive Maintenance Work Of Ht, Lt Switchgear,Pmcc, Mcc, Pccmodules, Local Control Panels, Ac Dbs,Dcdbs, Hvac Panels And Including Dc Motor Panels Of Main Plant . , Breakdown Maintenance Of Ht Breakers Switchgear Boards (11Kv & 3.3 Kv)& Ht Bus Bars , Breakdown Maintenance Lt Breakers, Modules Pmcc/Mcc /Pcc/Dc Control Panels And Power & Control Bus Bars Of Lt Panels , Routine, Preventive &Breakdown Maintenance Of All Eot Cranes, Hoists &Winches Of Tg & Bop Areas. , Testing Engineer , Skilled Manpower Deployment For Unscheduled Jobs , Semi- Skilled Manpower Deployment For Unscheduled Jobs , Routine Check Of Various Ratings Power Transformers Up To 40 Mva , Preventive Maintenance Of Various Rating Power Transformer Up To 40Mva , Breakdown Maintenance Of Various Rating Power Transformer Up To 40Mva , Oil Filtration Of Recti. Transformers Rating Up To 40Mva (Except Switchyard) , Bushing Replacement Of Transformer Up To 40 Mva , Arresting Of Oil Leakage From High Voltage Rectifier Transformer , Checking, Cleaning And Inspection Of Esp Area Electrical Equipments , Annual Preventive & Break-Down Maintenance Of Esp Fields/Tr Panels , Annual Preventive & Breakdown Maintenance Of Esp Rectifier Transformers , Oil Filtration Of Rectifier Transformer Of Esp , Cleaning And Inspection Of High Voltage Rectifier Transformer , Deployment Of Highly Skilled Manpower For Unscheduled Jobs , Skilled Manpower Deployment For Unscheduled Jobs , Semi Skilled Manpower Deployment For Unscheduled Jobs , Replacement Of Damaged With New/Repaired Esp Transformer Along With Negative Bushing Chamber By Dismentalling,Lowering Down, Shifting,Lifting Up & Recommissioning And Associated Works And Connecting It To Field , Assistance In Daily Checking Of Generator Parameters Upkeep And Routine Maintenance Of Various Panels Of Generator & Its Auxiliaries Including Ip,Sp,Nspbd, Air Pressurization Units, Pt Cubicles, Ct & Pt, Marshalling Boxes, Ecup , Transportation/Loading/Unloading Of H2 Gas Filling , Servicing / Overhauling/Replacement Of Ac/Dc Seal Oil Pump Or Float Trap Valveof Seal Oil System As Per Scope Of Work , Servicing / Replacement Of Valves Of H2 Gas/Seal Oil System / Primary Water System Valve As Per Scope Of Work , Removal/ Filling Of H2 Gas From Generator As Per Scope Of Work , Alignment Of Primary Water/Seal Oil Pumps With Ac/Dc Motor As Per Standard Procedure. , Replacement Of Bearing/ Mechanical Seal Of Seal Oil Pump By Isolating & Dismantling And Assembling & Installation After Completion Of Work , Servicing /Overhauling/Bearing Replacement Of Primary Water Pump , Replacement/Cleaning Of Seal Oil System Duplex Filter , Replacement/Cleaning Of Swcs Cooler Filter , Replacement Of Resins , Servicing Of Duplex Filter Of Seal Oil System As Per Scope Of Work , Attending Leakage From Generator Gas Coolers Coolers As Per Scope Of Work , Replacement Of Defective Generator Hydrogen Gas Cooler , Detecting Hydrogen Gas Leakage With Help Of Soap Solution And Attending Minor Gas Leakage From Entire Generator System , Breakdown Maintenance Of Thyristor Cooling Fans , Replacement Of Rubber Expansion Bellows Of Phase And Neutral Side Of Generator Terminal/Phase , Work On Ip/Nspbd/Sp Bus Ducts Of Ut/Uat/Gt , Cleaning/Replacement Of Flexible Links Of Phase/Neutral Side Of Generator Terminal As Per Scope Of Work , Replacement Of Phase/Neutral Side Protection Ct , Deployment Of Highly Skilled Manpower For Unscheduled Jobs , Deployment Of Skilled Manpower For Unscheduled Jobs , Deployment Of Semi-Skilled Manpower For Unscheduled Jobs , Oem Based Services As Per Scope Of Work (Emergency Visit) , Routine And Breakdown Maintenance Of 765 Kv Ais/400 Kv Gis Switchyard And Gts/Icts/Reactors Above 63 Mva/Mvar And 11 Kv Construction Power Supply System , Shift Duty Of Operating Personnel In 3 Shifts In A Day Of 765Kv Ais/400 Kv Gis Switchyard Of Obra Ctps. , 2 Nos. Shift Operator For Operation Of Main Plant Mv, Lv Switchgear, Mcc Rooms And Dc Battery Rooms. , 2 Nos. Shift Operator For Operation Of Mv, Lv Switchgear, Mcc Room Of Esp & Fgd , 2 Nos . Shift Operator For Operation Of Lv Switchgear, Mcc Room Of W& Wwtp , 2 Nos. Shift Operator For Operation Of Mv, Lv Switchgear, Mcc Room Of Ahp , Round The Clock Routine, Preventive & Breakdown Maintenance Awrs (Ctps) System & Its Auxiliaries And Associated 2 Nos. 11 Kv Line (7 Km Long) At Chakari Village Obra.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Round the clock operation & maintenance and Routine & breakdown maintenance of permanent station lighting system the lighting systems & Installation of new electrical points, light fittings/fixtures, lighting transformers, welding receptacle, Electrical wiring to provide new connection, Erection/repair of G.I. conduit pipe etc | Round the clock operation & maintenance and Routine & breakdown maintenance of permanent station lighting system the lighting systems & Installation of new electrical points, light fittings/fixtures, lighting transformers, welding receptacle, Electrical wiring to provide new connection, Erection/repair of G.I. conduit pipe etc |
| 2 | Jointing and end termination of control cables of all sizes | Jointing and end termination of control cables of all sizes |
| 3 | Jointing and End termination of LT power cables of all sizes | Jointing and End termination of LT power cables of all sizes |
| 4 | Jointing and End termination of HT power cables of all sizes | Jointing and End termination of HT power cables of all sizes |
| 5 | Routine and Preventive Maintenance of HT, LT& DC motors of main plant and AHS ,offsite BOP area and AWRS,CTPS | Routine and Preventive Maintenance of HT, LT& DC motors of main plant and AHS ,offsite BOP area and AWRS,CTPS |
| 6 | LT MOTOR (<=2.2KW) Attend Defect | LT MOTOR (<=2.2KW) Attend Defect |
| 7 | LT MOTOR (>2.2-5.5KW) Attend Defect | LT MOTOR (>2.2-5.5KW) Attend Defect |
| 8 | LT MOTOR (>5.5-18.5KW) Attend Defect | LT MOTOR (>5.5-18.5KW) Attend Defect |
| 9 | LT MOTOR (>18.5-37KW) Attend Defect | LT MOTOR (>18.5-37KW) Attend Defect |
| 10 | LT MOTOR (>37-55KW) Attend Defect | LT MOTOR (>37-55KW) Attend Defect |
| 11 | LT MOTOR (>55-90KW) Attend Defect | LT MOTOR (>55-90KW) Attend Defect |
| 12 | LT MOTOR (>90KW) Attend Defect | LT MOTOR (>90KW) Attend Defect |
| 13 | DC MOTORS(<=10KW)-Attend Defect | DC MOTORS(<=10KW)-Attend Defect |
| 14 | DC MOTORS(>10-20KW)-Attend Defect | DC MOTORS(>10-20KW)-Attend Defect |
| 15 | DC MOTORS(>20KW) Attend Defect | DC MOTORS(>20KW) Attend Defect |
| 16 | LT MOTOR (<=5.5KW) Connection | LT MOTOR (<=5.5KW) Connection |
| 17 | LT MOTOR (>5.5-18.5KW) Connection | LT MOTOR (>5.5-18.5KW) Connection |
| 18 | LT MOTOR (>18.5-37KW) Connection | LT MOTOR (>18.5-37KW) Connection |
| 19 | LT MOTOR (>37-55KW) Connection | LT MOTOR (>37-55KW) Connection |
| 20 | LT MOTOR (>55-90KW) Connection | LT MOTOR (>55-90KW) Connection |
| 21 | LT MOTOR (>90KW) Connection | LT MOTOR (>90KW) Connection |
| 22 | HT MOTORS Terminal connection / disconnection | HT MOTORS Terminal connection / disconnection |
| 23 | LT MOTOR (<=10 KW) Shifting/Replacement | LT MOTOR (<=10 KW) Shifting/Replacement |
| 24 | LT MOTOR (>10- 30 KW) Shifting/Replacement | LT MOTOR (>10- 30 KW) Shifting/Replacement |
| 25 | LT MOTOR (>30-75KW) Shifting/Replacement | LT MOTOR (>30-75KW) Shifting/Replacement |
| 26 | LT MOTOR (>75-90 KW) Shifting/Replacement | LT MOTOR (>75-90 KW) Shifting/Replacement |
| 27 | LT MOTOR (>90KW) Shifting/Replacement | LT MOTOR (>90KW) Shifting/Replacement |
| 28 | Miscellaneous machining/ repairing works | Miscellaneous machining/ repairing works |
| 29 | Rewinding of 3-Phase 440V induction motor | Rewinding of 3-Phase 440V induction motor |
| 30 | Up to1.0 KW | Up to1.0 KW |
| 31 | Above 1.0 KW up to 5 KW | Above 1.0 KW up to 5 KW |
| 32 | Rewinding of Single phase 240V AC induction motor | Rewinding of Single phase 240V AC induction motor |
| 33 | Up to 1.0 KW | Up to 1.0 KW |
| 34 | Rewinding of 220V DC Motor/Generator | Rewinding of 220V DC Motor/Generator |
| 35 | Up to 1 KW | Up to 1 KW |
| 36 | Round the clock maintenance and Routine & Preventive maintenance work of HT, LT switchgear,PMCC, MCC, PCCmodules, local control panels, AC DBs,DCDBs, HVAC panels and including DC motor panels of main plant . | Round the clock maintenance and Routine & Preventive maintenance work of HT, LT switchgear,PMCC, MCC, PCCmodules, local control panels, AC DBs,DCDBs, HVAC panels and including DC motor panels of main plant . |
| 37 | Breakdown maintenance of HT breakers switchgear boards (11KV & 3.3 KV)& HT Bus Bars | Breakdown maintenance of HT breakers switchgear boards (11KV & 3.3 KV)& HT Bus Bars |
| 38 | Breakdown maintenance LT breakers, Modules PMCC/MCC /PCC/DC Control Panels and Power & control bus bars of LT panels | Breakdown maintenance LT breakers, Modules PMCC/MCC /PCC/DC Control Panels and Power & control bus bars of LT panels |
| 39 | Routine, preventive &breakdown maintenance of all EOT cranes, Hoists &winches of TG & BOP areas. | Routine, preventive &breakdown maintenance of all EOT cranes, Hoists &winches of TG & BOP areas. |
| 40 | Testing Engineer | Testing Engineer |
| 41 | Skilled manpower deployment for unscheduled jobs | Skilled manpower deployment for unscheduled jobs |
| 42 | Semi- Skilled manpower deployment for unscheduled jobs | Semi- Skilled manpower deployment for unscheduled jobs |
| 43 | Routine Check of various ratings power transformers up to 40 MVA | Routine Check of various ratings power transformers up to 40 MVA |
| 44 | Preventive Maintenance of various rating power transformer up to 40MVA | Preventive Maintenance of various rating power transformer up to 40MVA |
| 45 | Breakdown Maintenance of various rating power transformer up to 40MVA | Breakdown Maintenance of various rating power transformer up to 40MVA |
| 46 | Oil filtration of Recti. transformers rating up to 40MVA (except Switchyard) | Oil filtration of Recti. transformers rating up to 40MVA (except Switchyard) |
| 47 | Bushing Replacement of Transformer up to 40 MVA | Bushing Replacement of Transformer up to 40 MVA |
| 48 | Arresting of oil leakage from high voltage rectifier transformer | Arresting of oil leakage from high voltage rectifier transformer |
| 49 | Checking, Cleaning and inspection of ESP area electrical equipments | Checking, Cleaning and inspection of ESP area electrical equipments |
| 50 | Annual Preventive & Break-down maintenance of ESP fields/Tr panels | Annual Preventive & Break-down maintenance of ESP fields/Tr panels |
| 51 | Annual Preventive & breakdown maintenance of ESP rectifier transformers | Annual Preventive & breakdown maintenance of ESP rectifier transformers |
| 52 | Oil filtration of Rectifier Transformer of ESP | Oil filtration of Rectifier Transformer of ESP |
| 53 | Cleaning and Inspection of High Voltage rectifier transformer | Cleaning and Inspection of High Voltage rectifier transformer |
| 54 | Deployment of highly skilled manpower for unscheduled jobs | Deployment of highly skilled manpower for unscheduled jobs |
| 55 | Skilled manpower deployment for unscheduled jobs | Skilled manpower deployment for unscheduled jobs |
| 56 | Semi Skilled manpower deployment for unscheduled jobs | Semi Skilled manpower deployment for unscheduled jobs |
| 57 | Replacement of damaged with New/repaired ESP transformer along with negative bushing chamber by dismentalling,lowering down, shifting,lifting up & recommissioning and associated works and connecting it to field | Replacement of damaged with New/repaired ESP transformer along with negative bushing chamber by dismentalling,lowering down, shifting,lifting up & recommissioning and associated works and connecting it to field |
| 58 | Assistance in Daily checking of Generator parameters Upkeep and routine maintenance of various panels of Generator & its auxiliaries including IP,SP,NSPBD, Air pressurization units, PT cubicles, CT & PT, Marshalling boxes, ECUP | Assistance in Daily checking of Generator parameters Upkeep and routine maintenance of various panels of Generator & its auxiliaries including IP,SP,NSPBD, Air pressurization units, PT cubicles, CT & PT, Marshalling boxes, ECUP |
| 59 | Transportation/Loading/Unloading of H2 gas filling | Transportation/Loading/Unloading of H2 gas filling |
| 60 | Servicing / Overhauling/Replacement of AC/DC seal oil pump or float trap valveof seal oil system as per scope of work | Servicing / Overhauling/Replacement of AC/DC seal oil pump or float trap valveof seal oil system as per scope of work |
| 61 | Servicing / Replacement of valves of H2 Gas/Seal Oil System / Primary Water System Valve as per scope of work | Servicing / Replacement of valves of H2 Gas/Seal Oil System / Primary Water System Valve as per scope of work |
| 62 | Removal/ Filling of H2 gas from Generator as per scope of work | Removal/ Filling of H2 gas from Generator as per scope of work |
| 63 | Alignment of Primary Water/seal oil pumps with AC/DC motor as per standard procedure. | Alignment of Primary Water/seal oil pumps with AC/DC motor as per standard procedure. |
| 64 | Replacement of Bearing/ Mechanical seal of seal oil pump by isolating & dismantling and assembling & installation after completion of work | Replacement of Bearing/ Mechanical seal of seal oil pump by isolating & dismantling and assembling & installation after completion of work |
| 65 | Servicing /Overhauling/Bearing replacement of Primary Water Pump | Servicing /Overhauling/Bearing replacement of Primary Water Pump |
| 66 | Replacement/Cleaning of seal oil system duplex Filter | Replacement/Cleaning of seal oil system duplex Filter |
| 67 | Replacement/Cleaning of SWCS cooler Filter | Replacement/Cleaning of SWCS cooler Filter |
| 68 | Replacement of Resins | Replacement of Resins |
| 69 | Servicing of Duplex filter of seal oil system as per scope of work | Servicing of Duplex filter of seal oil system as per scope of work |
| 70 | Attending Leakage from Generator gas coolers Coolers as per scope of work | Attending Leakage from Generator gas coolers Coolers as per scope of work |
| 71 | Replacement of defective generator hydrogen gas cooler | Replacement of defective generator hydrogen gas cooler |
| 72 | Detecting Hydrogen gas leakage with help of soap solution and attending minor gas leakage from entire generator system | Detecting Hydrogen gas leakage with help of soap solution and attending minor gas leakage from entire generator system |
| 73 | Breakdown maintenance of thyristor cooling fans | Breakdown maintenance of thyristor cooling fans |
| 74 | Replacement of rubber expansion bellows of phase and neutral side of generator terminal/phase | Replacement of rubber expansion bellows of phase and neutral side of generator terminal/phase |
| 75 | Work on IP/NSPBD/SP bus ducts of UT/UAT/GT | Work on IP/NSPBD/SP bus ducts of UT/UAT/GT |
| 76 | Cleaning/replacement of flexible links of phase/neutral side of generator terminal as per scope of work | Cleaning/replacement of flexible links of phase/neutral side of generator terminal as per scope of work |
| 77 | Replacement of phase/neutral side protection CT | Replacement of phase/neutral side protection CT |
| 78 | Deployment of highly skilled manpower for unscheduled jobs | Deployment of highly skilled manpower for unscheduled jobs |
| 79 | Deployment of skilled manpower for unscheduled jobs | Deployment of skilled manpower for unscheduled jobs |
| 80 | Deployment of semi-skilled manpower for unscheduled jobs | Deployment of semi-skilled manpower for unscheduled jobs |
| 81 | OEM based Services as per scope of work (emergency visit) | OEM based Services as per scope of work (emergency visit) |
| 82 | Routine and Breakdown maintenance of 765 KV AIS/400 KV GIS switchyard and GTs/ICTs/Reactors above 63 MVA/MVAR and 11 kV construction power supply system | Routine and Breakdown maintenance of 765 KV AIS/400 KV GIS switchyard and GTs/ICTs/Reactors above 63 MVA/MVAR and 11 kV construction power supply system |
| 83 | Shift duty of operating personnel in 3 shifts in a day of 765KV AIS/400 KV GIS Switchyard of Obra CTPS. | Shift duty of operating personnel in 3 shifts in a day of 765KV AIS/400 KV GIS Switchyard of Obra CTPS. |
| 84 | 2 nos. Shift Operator for Operation of Main Plant MV, LV Switchgear, MCC rooms and DC battery rooms. | 2 nos. Shift Operator for Operation of Main Plant MV, LV Switchgear, MCC rooms and DC battery rooms. |
| 85 | 2 nos. Shift Operator for Operation of MV, LV Switchgear, MCC room of ESP & FGD | 2 nos. Shift Operator for Operation of MV, LV Switchgear, MCC room of ESP & FGD |
| 86 | 2 nos . Shift Operator for Operation of LV Switchgear, MCC room of W& WWTP | 2 nos . Shift Operator for Operation of LV Switchgear, MCC room of W& WWTP |
| 87 | 2 Nos. Shift Operator for Operation of MV, LV Switchgear, MCC room of AHP | 2 Nos. Shift Operator for Operation of MV, LV Switchgear, MCC room of AHP |
| 88 | Round the clock Routine, Preventive & Breakdown Maintenance AWRS (CTPS) System & its Auxiliaries and associated 2 nos. 11 kV line (7 km long) at Chakari village Obra. | Round the clock Routine, Preventive & Breakdown Maintenance AWRS (CTPS) System & its Auxiliaries and associated 2 nos. 11 kV line (7 km long) at Chakari village Obra. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender