Tender For Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Janipur Of Electric Division-Iii Jpdcl Bhagwati Nagar Jammu For The Financial Year 2026-27 Or Till The Tender For The Fy 2027-28 Is Finalised.
Tender Overview
Project Description
Tender for Fixing Of Rate Contract For Handling Of Various Material In Divisional Stores At Janipur Of Electric Division-Iii Jpdcl Bhagwati Nagar Jammu For The Financial Year 2026-27 Or Till The Tender For The Fy 2027-28 Is Finalised.
BOQ
| Sl. No. | Item Description |
| 1 | Unloading of PCC Poles 11 Mtr Long |
| 2 | Unloading of PCC Poles 9 Mtr Long |
| 3 | Unloading of PCC Poles 8 Mtr Long |
| 4 | Unloading of ST Poles 13 Mtr Long |
| 5 | Unloading of ST Poles 11Mtr Long |
| 6 | Unloading of ST Poles 9 Mtr Long |
| 7 | Unloading of ST Poles 8 Mtr Long |
| 8 | Loading of PCC Poles 11 Mtr Long |
| 9 | Loading of PCC Poles 9 Mtr Long |
| 10 | Loading of PCC Poles 8 Mtr Long |
| 11 | Loading of ST Poles 13 Mtr Long |
| 12 | Loading of ST Poles 11Mtr Long |
| 13 | Loading of ST Poles 9 Mtr Long |
| 14 | Loading of ST Poles 8 Mtr Long |
| 15 | Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accessible place for loading/Unloading Purpose and its stacking |
| 16 | Unloading of /New ACSR Conductor |
| 17 | Loading of Old/New ACSR Conductor |
| 18 | Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking |
| 19 | Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking |
| 20 | Unloading of 25 KVA Transformer (New/Write Back Transformer) |
| 21 | Unloading of 63 KVA Transformer (New/Write Back Transformer) |
| 22 | Unloading of 100 KVA Transformer (New/Write Back Transformer) |
| 23 | Unloading of 250 KVA Transformer (New/Write Back Transformer) |
| 24 | Unloading of 400 KVA Transformer (New/Write Back Transformer) |
| 25 | Unloading of 630 KVA Transformer (New/Write Back Transformer) |
| 26 | Loading of 25 KVA Transformer |
| 27 | Loading of 63 KVA Transformer |
| 28 | Loading of 100 KVA Transformer |
| 29 | Loading of 250 KVA Transformer |
| 30 | Loading of 400 KVA Transformer |
| 31 | Loading of 630 KVA Transformer |
| 32 | Dragging of existing /New /Damaged 25 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 33 | Dragging of existing /New 63 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 34 | Dragging of existing /New /Damaged 100 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 35 | Dragging of existing /New /Damaged 250 KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 36 | Dragging of existing /New/Damaged 400KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 37 | Dragging of existing /New/Damaged 630KVA Transformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 38 | Dragging of existing /New /Damaged 25 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 39 | Dragging of existing /New 63 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 40 | Dragging of existing /New /Damaged 100 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 41 | Dragging of existing /New /Damaged 250 KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 42 | Dragging of existing /New/Damaged 400KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 43 | Dragging of existing /New/Damaged 630KVA Transformer at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 44 | Unloading of Channel/Angle/Flat Iron |
| 45 | Loading of Channel/Angle/Flat Iron |
| 46 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly |
| 47 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking |
| 48 | Unloading of Link/Knife/HG/DO/LA Set |
| 49 | Loading of Link/Knife/HG/DO/LA/GO Set |
| 50 | Unloading of CT/PT Unit |
| 51 | Loading of CT/PT Unit |
| 52 | Unloading of DPC CU/AL Wire |
| 53 | Unloading of Bush Rods and other allied workshop material |
| 54 | Unloading of allied material for HT/LT Line/Substations (i.e., Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc.) |
| 55 | Loading of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bush rods etc etc) |
| 56 | Shifting of allied material for HT/LT Line/Substations (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc) from unloading site to stacking site and stacking properly |
| 57 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material |
| 58 | Unloading/Loading of Bammboo Ladder |
| 59 | Unloading/Loading of Single/Three Phase Meters |
| 60 | Unloading of PVC Cable single core 95/120/185mmsq |
| 61 | Unloading of PVC Cable single core 300/400/630mmsq |
| 62 | Loading of PVC Cable single core 95/120/185mmsq |
| 63 | Loading of PVC Cable single core 300/400/630mmsq |
| 64 | Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines |
| 65 | Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines |
| 66 | Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines |
| 67 | Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines |
| 68 | Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly |
| 69 | Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly |
| 70 | Loading of Aluminium and Copper wire |
| 71 | loading of Bush Rods and other allied Workshop material |
| 72 | Unloading/Loading of Single phase/three phase meters |
| 73 | Stacking of Single/Three phase meters |
| 74 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines |
| 75 | Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc |
| 76 | Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc |
| 77 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc |
| 78 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. |
| 79 | Unloading of Cement Bags |
| 80 | Carrigae of Cement Bags from unloading site to stacking site (Upto 50 Mtr) |
| 81 | Stacking of Cement bags |
| 82 | Loading of Cement Bags |
| 83 | Fixing/Installation/Dismantaling of LED Larries/Stipes of 15 Mtr Length |
| 84 | Fixing/Installation/Dismantaling of LED Larries/Stipes of 30 Mtr Length |
| 85 | Rental charges for 15 Mtr/30 Mtr Larries/Stripes for consequtive days |
| 86 | Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents |
| 87 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store |
| 88 | Straightening of tilted fencing posts in the store premises for repair of fencing |
| 89 | Insertion of new fencing Posts in the store for repair of fencing |
| 90 | Dismantling of existing mesh fencing |
| 91 | Fixing of mesh Fencing |
| 92 | Fixing of CGI Sheets |
| 93 | Dismantling of CGI sheets |
| 94 | Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 25/63/100 KVA |
| 95 | Meggering, tightening of nuts and bolts, oil seals, breathers checking, visual inspections of Transformers 250/400/630KVA |
| 96 | Lifting of Unserviceable items like, Damaged Transformers (Outer frame of DTs), Broken Insulators of sorts, Al/ Cu/ Scrap/ Bush rods of sorts, Empty Barrells, Broken CGI Sheets, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking |
| 97 | Painting (Red oxide/Aluminium Paint) of Fabricated Material. |
| 98 | Fabrication of MS Angle/Channel/ Flat for making of Braces, Clamps, X-Arms etc. |
| 99 | Unloading of old loose conductor and making bundles |
| 100 | Checking & maggering of 11Kv LA set HG set GO set CT/PT unit Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender