Tender For Construction Work Of Kanha Gaushala/Animal Shelter Home Under Napp Gursarai.
Tender Value
1.65 Crore
Estimated cost
Bid Submission
03 Dec 2026
13 days left
EMD
3.31 Lakhs
Bank guarantee accepted
Document Fee
19838
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jhansi → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Work Of Kanha Gaushala/Animal Shelter Home Under Napp Gursarai.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing jungle including uprooting of the rank vegetations grass, bush, woodtrees and sapilings of grith up to 30cm measured at a height of 1.0m above ground level and removal of rubbsh up to a distance of 50mtr outside the pariphery of area cleared. Pg no-27 si no-259 |
| 2 | Earthwork in cutting or in filling in ordinary soil,excavation to be in the form of regular pits not excceeding 1/2 mtr (20\\")in deapth and earthwork in embankment to be 20cm (8\\")layers including ramming & dreshing the surface two required levels & slops & also including 1.5Mtr(5 Fts) lifts & 30 Mtr (100 Fts) leed. the earthform cutting to be used in making filling or to be disposited as spoil banks with in 30Mtr.(100Fts)distance as directed by engineer -in-charge.With out royalities. pg-26 Si No-253 |
| 3 | Excavation in soil mixed with moorum/shingle/kankar requiring the use of special T&P such as pickaxes, subbals etc.including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches.Si. No.-252 |
| 4 | Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 8 : 4 : I including supply of all materials, labour and T & P etc. required for proper completion of the work. S.i no-281 |
| 5 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in foundation and footing, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no -287 (I) |
| 6 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in lighter beam, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no -285 (I) pg-29 |
| 7 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in coloum, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no -289 pg-29 |
| 8 | Random course rubble masonary in 1:4 cemnt and course sand mortar in foundation and plinth including supply of materials as order by the engineer in charge, labour, T&P etc required for proper completion of the work si no-2 pg no-46 |
| 9 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI. No. 305 |
| 10 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work.SI No. 303+309 |
| 11 | Mild steel or iron work in havy sizes such as trusses , builts up gate, door frame, recourd rack roof work,gilts etc wrought to required from including drilling holes, rivetting or welding where necessary and also including supply of steel, bolts, nuts etc & their fixing required for proper completion of the work. Si No.-503 |
| 12 | Mild steel or iron work in plain work such as reinforced concrete/brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks, and authorized over lapping shall be measured. SI. No. 504 |
| 13 | 12 mm thick plaster on brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.58(3) |
| 14 | 15 mm thick plaster on rough side brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.59(3) |
| 15 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade including supply of all materials labour, tools and plants etc. required for proper completion of work.SI No.660+661 |
| 16 | Painting or varnishing new iron work in small areas or new wood work with one coat (up to one Sq. meter) of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950.SI No. 641+642 |
| 17 | Cement concrete with 4 cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 4 : 2 : I in plateform including supply of all materials, labour and T & P etc. required for proper completion of the work. S.i no-279 pg-40 |
| 18 | Main building for Vetinari Hospital and Accommodation block - |
| 19 | For teen shed and Godown- |
| 20 | Earth work in cutting or in filling in ordinary soil, excavation to be in th form of regular pits not exceeding 1/2 meter (20\\") in depth and earthwork in embankment. Si No-253 |
| 21 | Excavation in foundation in ordinary soil(Loam clay or sand).including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. S.I no - 251 |
| 22 | Supply and laying of stone dust in road surface for leveling the ground. |
| 23 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.PCC SI No.281 |
| 24 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in Slab and shelf, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 284 (I) |
| 25 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (Si. N0. 303) |
| 26 | 15 mm thick plaster on rough side brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.59(III) |
| 27 | Bio gas Genrator 5 KVA |
| 28 | Add 5% for Electricals fitting and light |
| 29 | Add Gst @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
TodayDec 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysDec 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender