Tender For Repairing Of Link Road Jhala Pich Road To Chakaiya. (Premixing And Seal Coat Work By Hotmix Plant)
Tender Value
58.26 Lakhs
Estimated cost
Bid Submission
26 Nov 2026
5 days left
EMD
4.95 Lakhs
Bank guarantee accepted
Document Fee
10502
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Gonda → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repairing Of Link Road Jhala Pich Road To Chakaiya. (Premixing And Seal Coat Work By Hotmix Plant)
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8\\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100\\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee. |
| 2 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 3 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 4 | Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 5 | Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hotmix Plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Hotmix Plant. |
| 8 | S/F of signboard as per direction of engineer in charge |
| 9 | S/F of NP3 Humepipe including fixing of Collar with 1:2 cement mortar as per MORD/MORTH specification Dia 350mm Dia Pipe. |
| 10 | Brick soling with Straigh Over Burnt bricks laid on edge (S.O.B.) & dry including preperation of subgrade to prescribed camber filling ,joints with local earth spreading blinding coat 1 cm depth of local earth over entire surface &including labour and T&P etc required for proper completion of work 100 sft. preperation of subgrade |
| 11 | (Item No. 01 To 10) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% |
| 12 | (Item No. 01 To 10) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75% |
| 13 | (Item No. 01 To 10) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50% |
| 14 | (Item No. 01 To 10) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25% |
| 15 | (Item No. 01 To 10) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00% |
| 16 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clayor sand) including lift upto1.5 m. lead upto 50 m and dressing of side sand rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C with in a lead of 30 m.(251) |
| 17 | Providing and laying Cement concrete 1:4:8 (1cement :4 Course sand :8 graded stone Ballast 40mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(S.I. No. 275) |
| 18 | Class-150 brick work in1:4 (1 cement and 4 coarse sand) mortarin foundationand plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(S.I. 305b) |
| 19 | Providing and laying Cement concrete 1:2:4 (1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(279b) |
| 20 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 21 | Supply Of Rubber module reflective Zig Zag 80 mm Thick.Precist Compressed C.C. Inter Locking as lock compressive strngth shall not be less then 30MPA and wight not less then 5.50kg each block including of 50mm thich bedding sand joint filling with sand all material labour T&P etc.required for proper complation of the work over the prepared base concrete as directed by Engineering-in-charge . |
| 22 | (Interlocking Work) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% |
| 23 | (Interlocking Work) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% |
| 24 | (Interlocking Work The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% |
| 25 | (Interlocking Work)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% |
| 26 | (Interlocking Work) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender