Tender For Construction Of Ht Line, Lt Line And Sub-Station For Releasing Of New Service Connection Under Edsd, Mohanpur Under Edd, Mohanpur With Supply And Fixing Of Decentralized Material.

Issued by Boards / Undertakings / PSU · Dehradun, Uttarakhand
Tender Value
50 Lakhs
Estimated cost
Bid Submission
04 Dec 2026
11 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dehradun → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Ht Line, Lt Line And Sub-Station For Releasing Of New Service Connection Under Edsd, Mohanpur Under Edd, Mohanpur With Supply And Fixing Of Decentralized Material.

BOQ

Name of Work:- Construction of HT Line, LT line and Sub-Station for releasing of new service connection under EDSD, Mohanpur under EDD, Mohanpur with supply and fixing of decentralized material.
Sl. No. Item Description
1Total Amount of the \\"Rate Schedule\\" sheet Please Enable Macros to View BoQ information SCHEDULE OF QUANTITY AND RATE FOR CONSTRUCTION OF HT LINE, LT LINE & SUB-STATION FOR RELEASING OF NEW SERVICE CONNECTION UNDER EDSD, MOHANPUR UNDER EDD, MOHANPUR WITH SUPPLY AND FIXING OF DECENTRALIZED MATERIALAGAINST E-TENDER SPECIFICATION NO.98/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion)
211KV XLPE HS Cable J/K 3X70/120 mm sq I/D
311KV XLPE HS Cable J/K 3X70/120 mm sq O/D
4Alu.toAlu. Connector ABCable 16 Sqr.mm to 16 Sqr.mm.
5Alu.toAlu. Connector ABCable 95 Sqr.mm to 95 Sqr.mm.
6Connecting Cable AB Cable to Dist. Box 1X16 Sqr.mm
7Connecting Cable AB Cable to Dist. Box 1X25 Sqr.mm
8Danger Board with Clamp Made of flat 25X3 mm with N&B
9Dead End Clamp with Eye Hook ABCable ST Pole SP-10
10Dead End Clamp with Eye Hook ABCable ST Pole SP-21
11Dead End Clamp with Eye Hook ABCable ST Pole SP-23
12Dead End Clamp with Eye Hook ABCable ST Pole SP-33
13Dead End Clamp with Eye Hook ABCable ST Pole SP-55
14Dead End Clamp with Eye Hook AB cable PCC pole
15Distribution Box with N&B ABCable 3Ph 8-Way
16Earth Wire Clamp with N&B PCC Pole 8.5M.Long(MS flat 50X6mm)
17Earth Wire Clamp with N&B ST Pole SP-10 (MS flat 50X6mm)
18Earth Wire Clamp with N&B ST Pole SP-21 (MS flat 50X6mm)
19Earth Wire Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
20Earth Wire Clamp with N&B ST Pole SP-33 (MS flat 50X6mm)
21Earth Wire Clamp with N&B ST pole 1sP-55 (Ms flat 50x6mm)
22F-Clamp for 11KV PCC pole Line made of flat 65X6mm with N&B
23LT Clamp with N&B PCC Pole 8.5Mtr.Long (MS flat 50X6mm)
24LT Clamp with N&B ST Pole SP-10 (MS flat 50X6mm)
25LT Clamp with N&B ST Pole SP-21 (MS flat 50X6mm)
26LT Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
27LT Clamp with N&B ST Pole SP-33 (MS flat 50X6mm)
28LT Clamp with N&B ST Pole SP-55 (MS flat 50X6mm)
29Lug Alu Alloy Al. Lug 120 mm sq
30Lug Alu Alloy Al. Lug 70 mm sq
31Lug Alu Alloy AI Lug 95mm Sq
32MS flat PCC Pole 8.5M (50X6mm) with N&B
33PP&Clamp with N&B PCC Pole 8.5Mtr Long (MS flat 50X6mm)
34PP&Clamp with N&B ST Pole SP-21 (MS flat 50X6mm)
35PP&Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
36PP&Clamp with N&B ST Pole SP-33 (MS flat 50X6mm)
37PP & Clamp with N&B ST pole SP-55 (Ms flat 50x6mm)
38Shackle Insulator 100X115 mm with N&B
39Shackle Insulator 100X115 mm without N&B
40Shackle Insulator 75X90 mm with N&B
41Stay Clamp with N&B PCC Pole 8.5Mtr.Long (MS flat 50X6mm)
42Stay Clamp with N&B ST Pole SP-10 (MS flat 50X6mm)
43Stay Clamp with N&B ST Pole SP-21 (MS flat 50X6mm)
44Stay Clamp with N&B ST Pole SP-23 (MS flat 50X6mm)
45Stay Clamp with N&B ST Pole SP-33 (MS flat 50X6mm)
46Stay Clamp with N&B ST Pole SP-55 (MS flat 50X6mm)
47Stay Insulator 90X65 mm
48PG Clamp 70-70 Sqmm
49Stud Clamp with N&B PCC Pole to PCC Pole 8.5Mtr Long
50Stud Clamp with N&B ST Pole SP-33 to SP-23
51Suspension Clamp with Eye Hook ABCable SP-10 ST Pole
52Suspension Clamp with Eye Hook ABCable ST Pole SP-21
53Suspension Clamp with Eye Hook ABCable ST Pole SP-23
54Suspension Clamp with Eye Hook ABCable ST Pole SP-33
55Suspension clamp with Eye Hook AB Cable PCC pole
56Top Bracing Clamp with N&B ST pole (Ms flat 50x6mm)
57Botton Bracing Clamp with N&B ST pole (Ms flat 50x6mm) Total - Part [A] 0.0 Part [B] (Labour Portion)
58Cartage of ST pole and PCC Poles from store centre to construction site with loading, unloading at both points and oroper stacking. SP-10 No. 1.0 0.0 SP-21 No. 1.0 0.0 SP-23 No. 1.0 0.0 SP-33 No. 1.0 0.0 SP-55 No. 1.0 0.0 PCC Poles No. 1.0 0.0
59Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends. Rs.Per Qtl. Qtl. 1.0 0.0
60Cartage of the following capacity transformers from store center to construction site with loading and unloading at both points 25/16 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No. 1.0 0.0 11 KV VCB(l/c,0/g) bus cupler,Pannels/PRMC No. 1.0 0.0
61Head load cartage of following Poles from road to site Upto 0 to 1 Km. SP-10 No. 1.0 0.0 SP-23 No. 1.0 0.0 SP-21 No. 1.0 0.0 SP-33 No. 1.0 0.0 SP-55 No. 1.0 0.0 PCC Poles No. 1.0 0.0
62Head load cartage of Small material. Rates are per Km/Quintal including loading and Unloading. Upto 0 to 1 Km. Qtl. 1.0 0.0
63Head load cartage/ mannual shifting / lifting with crane/hydra of the following transformers along with loading/Unloading at both points Upto 0 to 1 Km. 16 KVA No. 1.0 0.0 25 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No. 1.0 0.0
64Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
65Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESPO construction Manual. SP-10 No. 1.0 0.0 SP-21 Nos 1.0 0.0 SP-23 Nos 1.0 0.0 SP-33 Nos 1.0 0.0 SP-55 Nos 1.0 0.0 PCC Poles Nos 1.0 0.0
66Erection of following Double support pole in proper level and alignment alongwith fixing rjf dil accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. SP-23 Nos 1.0 0.0 SP-33 Nos 1.0 0.0 SP-55 Nos 1.0 0.0 PCC Pole Nos 1.0 0.0
67Grouting of pole in size 0.45x0.45x1/5 of the support in CC ratio 1:4:8 (1 cement: 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
68Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement: 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
69Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO sehedule and local approved drawing.
70Fixing of D-type bracket in LT line
71Fixing of triangular type bracket in 11 KV line
72Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
73Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing / RESPO manual. LT stay Nos 1.0 0.0 11 KV line Nos 1.0 0.0
74Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cernent,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
75Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the helpof G.I. wire as per construction manual.
76Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart. ACSR Weasel CktKm. 1.0 0.0 ACSR Rabbit CktKm. 1.0 0.0 ACSR DOG CktKm. 1.0 0.0
77Laying. Spreading, Stringing and sagging of L.T. Lines of the following wire as phase wire vith G.I. earth wire complete with binding and jumpering as per RESSPO Specn. ACSR Weasel Conductor 1 phase 2 wire length CktKm. 1.0 0.0 3 phase 4 wire length CktKm. 1.0 0.0 ACSR Rabbit Conductor 1 phase 2 wire length CktKm. 1.0 0.0 3 phase 4 wire length CktKm. 1.0 0.0
78Making Special type separate earthing for neutral /body of Power transformer by digging 3x4x12 feet deep pit at corner of Swithchyard with duly provided 1 No. coal iron earth plate of size 18\\"kl8\\"xX\\" jointing them with 6\\" long bolt duly coverod with layer of softcoal 60 Kg and salt 20 Kg. (Total 80 Kg.) , The earth plate shall be connected with 35x.6 mm Gl tftrip and Gl strip shall be laid upto the neutral and T/F body separately (Including supply of steel).
79Chemical Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode (to be supplied by contractor as per drawing No-A) as drawing B, connecting the same with G.I Strip (to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6m treatment of soil with highly conductive substance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in M.B before and after installation of earthing. The earth resistance after earthing should be less then 1 Ohm.
80Guarding of Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESPO manual. LT./11KV /33KV LT./11KV Line. Per Span 1.0 0.0 33KV line (max 70 Mtr) Per Span 1.0 0.0
81Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material)
82Mounting & Fixing of TPMO on double pole structures including making of connections complete work
83Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work
84Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.l. strip size 35x6 mm to earth point complete work excluding cost of G.t.Strip)
85Jointing and Fixing of cable jointing Kits indoor /outdoor cable boxes. 11 KV XLPE heat shrinkable No 1.0 0.0 Fixing & Installation of LT Fuse set Nos. 1.0 0.0
86Installation / mounting of new Tranformer on plinth pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. On Double Pole 16 KVA No. 1.0 0.0 25 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No. 1.0 0.0
87Route cleareance by cutting of tree branches / pronmg, loping and chopping of trees fc L.T., 11 &33 KVline.
88T-off Connection Complete 11 KV line.
89T-off Connection Complete 33 KV line.
90Providmg and fixing of Danger Board complete by providing clamps of MS. Flat 50x5 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11\\"x7\\" size Including cost of all material)
91Disconnection/Reconnection of existing service connection by jumpering as per RESSPO Schedule.
92Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone blast
93Making of section pole for existing LT/HT/33KV line complete in all respect.
94Installation of 33/11 KV Metering cubical in the Metering room with grouting and making all connection
95Fixing of Gl pipe.
96Fixing of RCC cable route marker Including cost material
97Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F tc PRMC.
98Mannual shifting /Pulling from existing site to plinth/ nearby place distance upto 200 mtrs. 11 KV VCB l/C 350 MVA, 600/300/5A, 110 V AC/PRMC Nos. 1.0 0.0
99Laying ,Sagging & binding of AB cable of size 25/120 sqmm these rates are only for cable additional provisions to be made for matching accessories installation, case of any network modification ie. Additional pole etc. and for actual connection disconnection as per site condition.
100Release of Single Phase Conncetion: Complete errection of LT PVC Cable 2x4 sqmm/2x6 sqmm and installation of single phase electronic meter 10-60 Amp on pole or outside the premises of applicant
101Release of Three Phase Conncetion: Complete errection of LT PVC Cable 4x6 sqmm/4x10 sqmm and installation of single phase electronic meter 10-60 Amp on pole or outside the premises of applicant
102Jumpering and connection complete on the D/P conductor to TPMO fuse set & T/F
103Making of complete T/F Base on the D/P.
104Laying, Stringing, Sagging of 11KV XLPE Cable 3x120sqmm
105Laying, Stringing, Sagging of 11KV XLPE Cable 3x35/3x70 sqmm
106Fixing of Suspension Clamp with eye hook
107Fixing of dead end clamp with eye hook
108Fixing of IPC
109Fixing of netural conector Pg Clamp
110Fixing of LT DB with its clamp
111Fixing of stay clamp
112Dismantling of Transformers 25 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No 1.0 0.0
113Back cartage of following type of material from site to JE/Center Store 25 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No 1.0 0.0 11 KV VCB(l/c,0/g) bus cupler,Pannels/PRMC No. 1.0 0.0
114Back Head load cartage of following type of material from site to JE/Center Store 25 KVA No. 1.0 0.0 63 KVA No. 1.0 0.0 100 KVA No 1.0 0.0 11 KV VCB(l/c,0/g) bus cupler,Pannels/PRMC No. 1.0 0.0 Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer

AI Tender Summary

OUR REF NO 58631124
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 50 Lakhs
LAST DATE 04-12-2026
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Tender for Construction Of Ht Line, Lt Line And Sub-Station For Releasing Of New Service Connection Under Edsd, Mohanpur Under Edd, Mohanpur With Supply And Fixing Of Decentralized Material.
Basic Detail
Tender No 98/EDCRDDUN/2026-27
Bidding Type Tender
Location
City Dehradun
State Uttarakhand
Key Dates
Publish Date 20 Nov 2026
Submission Date 04 Dec 2026
Open Date 04 Dec 2026
Finance
Tender Value 50 Lakhs
Tender Fee 2360
EMD 1 Lakhs
Exemption Not Available
Document List
75df3d5f-d2de-47df-89db-b026f7e5dd63.html
BOQ_120927.xls
ImportantNotice.pdf
TenderDocument.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Dec 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
html

75df3d5f-d2de-47df-89db-b026f7e5dd63.html

xls

BOQ_120927.xls

pdf

ImportantNotice.pdf

pdf

TenderDocument.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender