Tender For New Construction Work Of Daravar Baba Kuti Road To Chaansi Link Road In Daravar Village, Block Anoopshahr
Tender Value
1.38 Crore
Estimated cost
Bid Submission
26 Nov 2026
4 days left
EMD
8.95 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hathras → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for New Construction Work Of Daravar Baba Kuti Road To Chaansi Link Road In Daravar Village, Block Anoopshahr
BOQ
| Sl. No. | Item Description |
| 1 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 2 | Providing, laying and speading material on a prepared sub grade, adding cement @ 2% by weight to the spread materaial manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 3 | Providing, laying and speading material on a prepared sub grade, adding cement @ 4% by weight to the spread materaial manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 4 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 6 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 7 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 8 | Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 9 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 10 | Providing & Laying Cement Concrete Pipe NP3 (burried conduits) (350 mm dia) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 11 | Providing & Laying Cement Concrete Pipe NP3 (burried conduits) (600 mm dia) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 12 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 13 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 14 | Plain cement concrete (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 for Coping over B/W Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 15 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (With Patri Work) Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 16 | Providing & fixing reinforced cement concrete M15 grade Ordinary Kilometre Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 17 | Providing & fixing reinforced cement concrete M15 grade 200 m Hectometre Stone (precast) of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. |
| 18 | Cost of maintenance for IInd Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 19 | Cost of maintenance for IIIrd Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 20 | Cost of maintenance for IVth Year @ 2.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO |
| 21 | Cost of maintenance for Vth Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.