Tender For Expression Of Interest (Eoi) For Empanelment Of Consultancy Firms For detail project report Preparation, Design Review / Proof Checking And Allied Services For Roads, Buildings, Water Supply And Sewerage Work In The Ut Of Dadra And Nagar H
Tender Overview
Project Description
Tender for Expression Of Interest (Eoi) For Empanelment Of Consultancy Firms For detail project report Preparation, Design Review / Proof Checking And Allied Services For Roads, Buildings, Water Supply And Sewerage Work In The Ut Of Dadra And Nagar Haveli And Daman And Diu
BOQ
| Sl. No. | Item Description |
| 1 | Consultancy services. |
| 2 | Topographic and Contour Survey work with level at every 10m interval up to ROW |
| 3 | (a) For ROW of 60 meter |
| 4 | (b) For ROW of 40 meter |
| 5 | (c) For ROW 25 meter |
| 6 | (C) For ROW of up to 18 meter |
| 7 | Collection of Subgrade soil sample and Necessary Laboratory Investigation |
| 8 | Conducting BBD test, Condition survey and condition survey on existing pavement including truck rent |
| 9 | Conducting FWD test, Condition survey and condition survey on existing pavement |
| 10 | Pavement design for the Overlay & widening |
| 11 | Geometric Design (Horizontal and Vertical alignment) and Junction improvement with shyness and Road Marking/Furniture as per the IRC Guide lines with Typical cross section of the road |
| 12 | Bill of Quantities and Cost estimate for Road work |
| 13 | Pipe Culvert design and Drawing (New / Widening) including Inventory |
| 14 | Box slab Culvert design and Drawing (New / Widening) including Inventory |
| 15 | Major bridge design and Drawing (New / Widening) including Inventory |
| 16 | Minor bridge design and Drawing (New/Widening) including Inventory |
| 17 | Preparation of BOQ for the Cross-drainage work like Major bridge, Minor bridge, Box culvert, Pipe culvert |
| 18 | (a) Major Bridge |
| 19 | (b) Minor bridge |
| 20 | ( c) Box/slab Culvert |
| 21 | (d) Pipe culvert |
| 22 | Tender Preparation include RFP, NIT and Technical Specification |
| 23 | Conducting traffic Survey |
| 24 | Conducting Axle load |
| 25 | Origin-Destination and Commodity Movements Surveys |
| 26 | Turning Movement Surveys |
| 27 | Speed-Delay Surveys |
| 28 | Pedestrian Surveys |
| 29 | Traffic Demand Estimates |
| 30 | Mapping of heritage structure |
| 31 | Drainage System Design |
| 32 | Road furniture plan |
| 33 | Parking Areas and Rest Areas |
| 34 | Project Reports |
| 35 | Geo technical Investigation forp proposed structures including Drilling of boreholes,Collection of Disturbed and Undisturbed samples,Conducting SPT,Carrying out necessary |
| 36 | (a) For Soil |
| 37 | (b) For Soft Rock |
| 38 | (C) For Hard Rock |
| 39 | Land Acquisition Plan |
| 40 | Conducting FWD test on Existing road surface |
| 41 | Conducting NSV test on existing road surface |
| 42 | Pond Design and Estimate |
| 43 | Rebound Hammer Test: Preparing the surface of RCC structural members such as beams, columns, slabs etc by chipping the plastered surface/finishing /cladding to expose the concrete, smoothening the area using carborandum stone all in terms of relevant IS code and conducting rebound hammer test all as per IS 13311-1992 (Part 2) or as directed by consultant including analysis of the test result & preparation of separate report for each building with observations and recommendations for remedial measures if any. |
| 44 | UPV ( Ultrasonic Pulse Velocity) Test: Preparing the surface of RCC structural members such as beams, columns, slabs etc. by chipping the plastered surface/ finishing/cladding to expose the concrete,smoothening the area using carborandum stone all in terms of relevant IS code and conducting ultrasonic pulse velocity test all as per IS 13311-1992 (Part 1) or as directed by consultant including analysis of the test result & preparation of separate report for each building with observations and recommendations for remedial measures if any. |
| 45 | Half Cell Potential Test for Corrosion mapping. Preparing the structural members as directed to expose the reinforcement steel, cleaning the area with blower/wire brush and carrying out half-cell potentiometer test for measuring the level of corrosion of reinforcement steel in the RCC member including analysis of the test result & preparation of separate report for each building with observations and recommendations for remedial measures if any. |
| 46 | Carbonation Depth Test: Preparing the surface of RCC structural member such as beams, columns, slabs, water tank walls & slab etc by chipping the plastered surface/finishing/cladding to expose the concrete, cutting etc as per relevant code and conducting carbonation test at various depth as directed by consultant using phenolphthalein of specified concentration to assess depth of carbonation including separate report for each building with analysis of the test result, observations and recommendations for remedial measures if any. |
| 47 | Concrete Core Extraction and Testing: To carry out Concrete Core Extraction and testing of concrete cores from RCC structural members as per IS 516 / IS 1199 / IS 456, including making good the cored hole, analysis of the test result and preparation of separate report for each building with observations and recommendations for remedial measures if any. |
| 48 | Cover meter survey with report (as in the earlier schedule of this RFP) |
| 49 | Preliminary inspection of all the exposed components of the building, Preliminary Inspection Report and important observations shall be considered in the preliminary inspection report. For upto 400 sqmt built up area of particular building |
| 50 | Preliminary inspection of all the exposed components of the building, Preliminary Inspection Report and important observations shall be considered in the preliminary inspection report. From 401 to 2000 sqmt built up area of particular building |
| 51 | Preliminary inspection of all the exposed components of the building, Preliminary Inspection Report and important observations shall be considered in the preliminary inspection report. From 2001 to 5000 sqmt built up area of particular building |
| 52 | Preliminary inspection of all the exposed components of the building, Preliminary Inspection Report and important observations shall be considered in the preliminary inspection report. Above 5001 sqmt built up area of particular building |
| 53 | Consultancy charges for preparation of building wise structural audit report which includes The findings from detailed visual inspection ,Non-destructive test results, Suggested remedial measures, Bill of quantities item wise & detailed specification with cost estimate for each building, Classification of severity, Photos of distressed location, including inspection of rectification of short comings for all the premises pointed out during the execution and subsequent inspection and provision, required certification of stability of building as directed by Engineer In Charge. For upto 400 sqmt built up area of particular building |
| 54 | Consultancy charges for preparation of building wise structural audit report which includes The findings from detailed visual inspection ,Non-destructive test results, Suggested remedial measures, Bill of quantities item wise & detailed specification with cost estimate for each building, Classification of severity, Photos of distressed location, including inspection of rectification of short comings for all the premises pointed out during the execution and subsequent inspection and provision, required certification of stability of building as directed by Engineer In Charge. From 401 to 2000 sqmt built up area of particular building |
| 55 | Consultancy charges for preparation of building wise structural audit report which includes The findings from detailed visual inspection ,Non-destructive test results, Suggested remedial measures, Bill of quantities item wise & detailed specification with cost estimate for each building, Classification of severity, Photos of distressed location, including inspection of rectification of short comings for all the premises pointed out during the execution and subsequent inspection and provision, required certification of stability of building as directed by Engineer In Charge. From 2001 to 5000 sqmt built up area of particular building |
| 56 | Consultancy charges for preparation of building wise structural audit report which includes The findings from detailed visual inspection ,Non-destructive test results, Suggested remedial measures, Bill of quantities item wise & detailed specification with cost estimate for each building, Classification of severity, Photos of distressed location, including inspection of rectification of short comings for all the premises pointed out during the execution and subsequent inspection and provision, required certification of stability of building as directed by Engineer In Charge. Above 5001 sqmt built up area of particular building |
| 57 | Measured survey and drawings of existing building |
| 58 | Architectural design and drawings of building |
| 59 | Structural design and drawings of building (RCC / steel) with foundation |
| 60 | Electrical design and drawings of building |
| 61 | Plumbing, drainage and fire-fighting design and drawings |
| 62 | HVAC and lift design and specifications |
| 63 | Design of retrofitting / rehabilitation of existing building |
| 64 | Preliminary estimate on CPWD Plinth Area Rates |
| 65 | Detailed estimate and BOQ of building works on CPWD DSR with cost index |
| 66 | Tender preparation of building works, including RFP, NIT and technical specifications |
| 67 | Preparation of Detailed Project Report of building works |
| 68 | Asset inventory and GIS mapping of water supply system |
| 69 | Pipeline route and levelling survey with plan and longitudinal section |
| 70 | Condition assessment of sump / reservoir |
| 71 | Condition assessment of elevated service reservoir with NDT |
| 72 | Condition assessment of water treatment plant |
| 73 | Pressure, flow and leakage test of distribution network |
| 74 | Pump performance test |
| 75 | Water quality sampling and testing (IS 10500) |
| 76 | Non-revenue water study and water audit |
| 77 | Population forecast and water demand projection |
| 78 | Hydraulic modelling and design of distribution network |
| 79 | Design of intake and raw water main |
| 80 | Process, hydraulic, structural and mechanical design of water treatment plant |
| 81 | Structural design of ESR / ground level reservoir / sump (IS 3370) |
| 82 | Design of pumping station with pump selection and surge analysis |
| 83 | Design for rehabilitation of existing pipes and structures |
| 84 | BOQ and estimate of water supply works |
| 85 | Tender preparation of water supply works, including RFP, NIT and technical specifications |
| 86 | Preparation of Detailed Project Report of water supply scheme |
| 87 | Asset inventory and GIS mapping of sewerage system |
| 88 | Route and topographic survey with plan and longitudinal section |
| 89 | Manhole and invert level survey |
| 90 | Flow measurement |
| 91 | Sewage sampling and testing |
| 92 | CCTV inspection of sewer with condition report |
| 93 | Catchment study, population forecast and sewage generation |
| 94 | Hydraulic modelling and design of sewer network with manholes |
| 95 | Design of house sewer connections |
| 96 | Design of sewage pumping station and rising main |
| 97 | Process, hydraulic, structural and mechanical design of sewage treatment plant |
| 98 | Design of decentralised treatment and faecal sludge and septage management |
| 99 | Design for rehabilitation of existing sewers |
| 100 | BOQ and estimate of sewerage works |
| 101 | Tender preparation of sewerage works, including RFP, NIT and technical specifications |
| 102 | Preparation of Detailed Project Report of sewerage scheme |
| 103 | Proof checking of building design, drawings and BOQ |
| 104 | Proof checking of bridge: (a) major bridge, (b) minor bridge |
| 105 | Proof checking of road design, drawings and BOQ |
| 106 | Proof checking of pipe culvert |
| 107 | Proof checking of box / slab culvert |
| 108 | Proof checking of retaining wall |
| 109 | Proof checking of gabion wall |
| 110 | Proof checking of gabion facia wall |
| 111 | Geotechnical investigation for building / plant site: boring, field and laboratory tests with report |
| 112 | Topographic survey of building / plant / reservoir site |
| 113 | Preparation of GIS database and maps |
| 114 | Environmental and social impact assessment and clearance documents |
| 115 | Value engineering of a design or estimate |
| 116 | Third-party technical audit of works with testing of materials and workmanship |
| 117 | Advisory report on a technical issue referred by the Client |
| 118 | Tender preparation of combined packages of more than one discipline, including RFP, NIT, technical specifications and BOQ |
| 119 | Tender support: pre-bid queries and bid evaluation |
| 120 | Execution support: shop drawing review |
| 121 | Execution support: site inspection visit with report |
| 122 | Verification of as-built drawings Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender