Tender For For Temporary Work In Kumbh Mela-2027
Tender Value
2.05 Crore
Estimated cost
Bid Submission
03 Dec 2026
12 days left
EMD
4.10 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Haridwar → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for For Temporary Work In Kumbh Mela-2027
BOQ
| Sl. No. | Item Description |
| 1 | BOQ OF TEMPORARY WORK OF ERECTION AND DISMANTLING 11 KV, LT LINE, STREET LIGHT CONNECTION, INSTALLATION OF TRANSFORMER, SHIFTING AND OTHER WORK IN KUMBH MELA-2027 IN EDD, URBAN, EDD, JWALAPUR AND EDD, RISHIKESH ETC. UNDER EDC, UPCL, HARIDWAR AGAINST E-TENDER NO- 92/SE/EDC/HDR/KM-2027/2026-27 Bidder's Name & Address S.N. Work Unit Qty. Rate Amount (In Rs.) A Decentrlized Material |
| 2 | 11 KV ACS AL-59,78 SQ MM Covered Conductor |
| 3 | 11 KV Mid span Jointing Kit |
| 4 | IPC With AL. BAIL for Earthing 11kv |
| 5 | 11 KV Sub. Ties/Cable Ties on pin Insulator |
| 6 | Disc fitting (B&S) type 70 KN for ACS |
| 7 | 11 KV tension clamp with bail &IPC |
| 8 | 11 KV IPC for Covered To Covered Connector |
| 9 | 11 KV IPC for Covered To Bare Connector |
| 10 | 33KV ACS AL-59, 232 SQ.mm COVERED CONDUCTOR |
| 11 | 33KV IPC for CC to CC Conn. in every sec |
| 12 | 33 KV IPC for covered to Bare conductor |
| 13 | 33 KV Cable ties for Pin insulator |
| 14 | 33 KV Mid span jointing kit |
| 15 | IPC with aluminium bail for earthing |
| 16 | 33 KV Disc insulator for AAAC conductor |
| 17 | TROLLY For 400 KVA |
| 18 | G.I Pipe for Street Light - 32 MM to 50 MM (Street Light RACKET 32 MM DIA) |
| 19 | G.I Clamp for Street Light (D Clamp) |
| 20 | Street Light Bend Pipe |
| 21 | Flexible Conduit Pipe 20 MM |
| 22 | Stay Clamp for Sp-23 with Nut & bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 65mm) |
| 23 | Dead End Clamp with J hook |
| 24 | Suspension clamp with J hook |
| 25 | P.P with Holding clamp with Nut & Bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 100mm) |
| 26 | Bottom-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 27 | MCCB FOR 63 KVA T/F WITH EARTH RELAY |
| 28 | MCCB FOR 100 KVA T/F WITH EARTH RELAY |
| 29 | MS CLAMP BOOTOM FOR SP-55 FOR MCCB |
| 30 | stud Stay Clamp for Sp-23 with Nut & bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 65mm) (for pole stay) |
| 31 | Piercing connector for 120-50 sq mm |
| 32 | Piercing connector for 70-25 sq mm |
| 33 | Piercing connector for neutral size 95-50sq mm |
| 34 | Piercing connector 120-25sq mm |
| 35 | LT distribution box 3ph,4wire |
| 36 | LT XLPE Cable 1x50sq mm |
| 37 | LT XLPE Cable 1x25sq mm |
| 38 | stone pad 300x300x75mm |
| 39 | Danger board &No.plate with clamp |
| 40 | earth wire clamp for st pole sp-23 with N&B |
| 41 | LT Armoured PowerCable 4x25sq mm |
| 42 | LT Armoured Power Cable 3.5x70sq mm |
| 43 | LT XLPE AB Cable 3x50+1x35+1x16 sq mm |
| 44 | Dead end Clamp for st pole sp-23 |
| 45 | Piercing connector for neutral size 25-25 sq mm |
| 46 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 47 | PVC cable aluminium 2 x 10 Sq.mm |
| 48 | 415V, 32A Double Pole Iron Clad Main Switch |
| 49 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 50 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 51 | 120 watt LED light fitting with all accessoies (for street light) i. 120 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 52 | Aluminium Dowel crimping lugs (for HT & LT side) |
| 53 | Lug 120 Sqmm |
| 54 | LT ACB for 50 KA for 250KVA/400 KVA S/S |
| 55 | Crimping type Lugs for 630 sq mm cable |
| 56 | Crimping type Lugs for 240 sq mm cable |
| 57 | Al Lug 240Sqmm |
| 58 | Al Lug 400 Sqmm |
| 59 | G.I. Pipe 6\\" dia, 3 mtr long |
| 60 | Holding clamp for holding xlpe cable(SP-23 top) |
| 61 | Holding clamp for holding xlpe cable(SP-23 middle) |
| 62 | Holding clamp for holding xlpe cable(SP-23 Bottom) |
| 63 | P.P & holding clamps for SP-55 with Nut & Bolt (Flat size 75mm x 10mm) |
| 64 | Earth-wire Clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 65 | Bottom-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 66 | Top-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 67 | P.G. clamp for Rabbit conductor |
| 68 | Al binding wire |
| 69 | 11 Kv HS Kit 3x70MM Indoor type |
| 70 | 11 Kv HS Kit 3x70MM Outdoor type |
| 71 | Anti climbing device |
| 72 | Barbed wire |
| 73 | Stay Insulator |
| 74 | Stay clamp with Nut & Bolt (Flat size 50mm x 6mm) for SP-10/SP-21/SP-23/SP-55 |
| 75 | 11 KV H/S Jointing Kit 185 SQ MM (O/D) |
| 76 | LT XLPE Al. Armoud Cable 3.5x400 Sq.mm |
| 77 | LT Armoured Cable 3.5x150 Sqmm |
| 78 | Cable AL 3x185 Sq.mm XLPE 11 KV-D |
| 79 | AL. Crimping Type Lugs 70 Sq.mm |
| 80 | T Connector |
| 81 | 11KV XLPE HS J/KIT 3x300mm²(Straight) |
| 82 | 11KV CABLE T/K 3X300mm² XLPE O/D |
| 83 | Straight Through LT O/D 3.5x400 sq.mm. |
| 84 | Straight Through LT O/D 3.5x240 sq.mm |
| 85 | LT Straight Through J/Kit of 3.5x150 Sqm |
| 86 | LT Straight Through J/Kit of 3.5x95 Sqm |
| 87 | LT Straight though 3.5x70sqmm |
| 88 | LT Straight though 3.5x50sqmm |
| 89 | LT J/K KIT 3.5X400 SQ.MM |
| 90 | LT J/K KIT 3.5X240 SQ.MM |
| 91 | LT J/K KIT 3.5X150 SQ.MM |
| 92 | LT J/K KIT 3.5X95 SQ.MM |
| 93 | LT J/K KIT 3.5X70 SQ.MM |
| 94 | LT J/K KIT 3.5X50SQ.MM |
| 95 | LT J/K KIT 4X25 SQ.MM |
| 96 | LT Cable Kit for Cable 4x16/4x10/2x10etc |
| 97 | LT Cable Kit for Cable 4x6 |
| 98 | LT Cable Kit for Cable 2x6 |
| 99 | LT XLPE Al. Armoud Cable 3.5X240 sq.mm. |
| 100 | LT XLPE Al. Armoud Cable 4X95 sq.mm. |
| 101 | LT Armoured Power Cable 3.5x70sq mm |
| 102 | LT XLPE Al. Armoud Cable 3.5X50 sq.mm. |
| 103 | LT PVC Cable 4X25sq.mm Al Armoured |
| 104 | LT PVC Cable 4X16sq.mm Al Armoured |
| 105 | LT XLPE Al. Armoured Cable 4X10 sq.mm. |
| 106 | LT XLPE Al. Armoured Cable 4X6sq.mm. |
| 107 | LT PVC Cable 2X10sq.mm Al Armoured |
| 108 | LT XLPE Armoured Cable 2x6 sq mm-D |
| 109 | Brass Gland for LT XLPE Cable 3.5x400sqm |
| 110 | Brass Gland for LT XLPE Cable 3.5x240sqm |
| 111 | Brass Gland for LT XLPE Cable 3.5x150sqm |
| 112 | Brass Gland for LT XLPE Cable 3.5x95sqm |
| 113 | Brass Gland for LT XLPE Cable 3.5x70sqm |
| 114 | Brass Gland for LT XLPE Cable 3.5x50sqm |
| 115 | Brass Gland for LT XLPE Cable 4X25 sqm |
| 116 | Brass Gland for LT XLPE Cable 4X16 sqm |
| 117 | Brass Gland for LT XLPE Cable 4X10 sqm |
| 118 | Brass Gland for LT XLPE Cable 4X6 sqm |
| 119 | Brass Gland for LT XLPE Cable 2X10 sqm |
| 120 | Brass Gland for LT XLPE Cable 2X6 sqm |
| 121 | SUPPLY AL BUSBAR OF L.T C PANNEL 50X5 |
| 122 | INSULATR FOR PANNEL BUS BAR Total (A) 0.0 B Labour |
| 123 | Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 20KM) (i) 63 KVA, 11/0.4 KV Transformer No. 1.0 0.0 (ii) (ii)100 KVA, 11/0.4 KV Transformer No. 1.0 0.0 (iii) (iii) 250 KVA, 11/0.4 KV Transformer No. 1.0 0.0 (iv) (iv) 400 KVA, 11/0.4 KV Transformer No. 1.0 0.0 |
| 124 | ST Pole SP-55 |
| 125 | ST Pole SP-23 |
| 126 | small line material. |
| 127 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing. |
| 128 | Erection of Double pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting,muffing & fabrication of angle channel etc.) |
| 129 | Erection of single pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fabrication of angle channel etc.) and muffing |
| 130 | Mounting of 63 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work). |
| 131 | Mounting of 100 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work). |
| 132 | Installation / mounting of 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 133 | Installation / mounting of 400 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 134 | Mounting & fixing of G.O. Switch & Fuse set on double pole structure including making all connections (complete work). |
| 135 | Mounting and fixing of Lightning Arrestor (complete work). With GI Strip. (G.I. strip (35X6 sqmm) will be provided by the contractor) |
| 136 | INSTALLATION FOR DIGITAL (MCCB) FOR 63 KVA S/S |
| 137 | INSTALLATION FOR DIGITAL (MCCB) FOR100 KVA S/S |
| 138 | Installation of LT ACB with complete work |
| 139 | Double pole of Substation with channel & angle |
| 140 | Laying & jointing of LT cable |
| 141 | CHEMICAL EARTHING FOR 63 KVA S/S |
| 142 | CHEMICAL EARTHING FOR 100 KVA S/S |
| 143 | CHEMICAL EARTHING FOR 250 KVA S/S |
| 144 | CHEMICAL EARTHING FOR 400 KVA S/S |
| 145 | Erection of Delta earthing as per RESPO norms( for eathing of T/F neutral, T/F body ) with GI Strip. (G.I. strip (35X6 sqmm) will be provided by the contractor) |
| 146 | Construction of T/F plinth by using Gatter (C- shape 152x75 mm) |
| 147 | Wire mash fencing height 3 Mtrs and 3x3x3 Mtr. |
| 148 | Providing and Fixing 6 mm thick exterior-grade decorative wooden-finish HPL sheet fencing/enclosure |
| 149 | Erection of stay with comlete grouting, tigthing and nozzling as per RESPO norms |
| 150 | Fixing of Tee-off Channel with complete accessories |
| 151 | Fixing of IPC with AL BAIL for Earthing |
| 152 | Fixing of 11 KV tension clamp with BAIL & IPC |
| 153 | Fixing of 11KV MID SPAN Jointing Kit |
| 154 | Fixing of 11 KV Cable Ties |
| 155 | Fixing of 11 KV IPC for Covered - Covered |
| 156 | Fixing of 11 KV IPC for Covered To Bare Connector |
| 157 | Chemical earthing |
| 158 | Cost of providing and fixing self-adhesive bitumen sheet membrane of 1.5 mm thickness on single steel tubular pole |
| 159 | Erection of ST Pole SP-23 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) with muffing |
| 160 | Erection of ST Pole SP-23 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) (for pole stay) |
| 161 | Laying of 11 KV XLPE Cable underground by excavation work as per RESPO, climbing of cable on D/P through G.I. Pipe, making connection both side complete work |
| 162 | Laying Spreading, stringing, sagging of 33 KV ACS AL-59, 232 SQ MM Covered Conductor |
| 163 | Laying Spreading, stringing, sagging of 11 KV ACS AL-59, 78 SQ MM Covered Conductor |
| 164 | Laying ,Spreading,stringing, sagging LT XLPE AB Cable3x120+1x95+1x16 sq mm |
| 165 | Laying ,Spreading,stringing, sagging LT XLPE AB Cable 3x50+1x35+1x16 sq mm |
| 166 | Laying Spreading,stringing, sagging of LT XLPE Cable AB Cable of size 3Cx25+25 sq mm |
| 167 | Painting of Pole (Two coat enamel aluminium paint) (including cost of red oxide & enamal paint) |
| 168 | fixing of Piercing connector for neutral |
| 169 | fixing of LT distribution box with clamp |
| 170 | fixing of Suspension clamp with Jhook |
| 171 | fixing of Dead end Clamp for st pole sp-23 |
| 172 | chemical earthing for st pole |
| 173 | Installation of 1 ph. Meter |
| 174 | Installation of 3ph. Meter |
| 175 | Installation of LT PRMC |
| 176 | fixing of Piercing connector |
| 177 | Cartage of following material form store to work site including loading, unloading & safe stacking (average distance - 1 to 30 Km) |
| 178 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 179 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 180 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 181 | 120 watt LED light fitting with all accessoies (for street light) i. 120 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 182 | Fixing of following street light material on pole |
| 183 | 150 watt HPSV Flood light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 184 | 70 watt HPSV light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 185 | 70 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 186 | 120 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 120 watt LED - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 187 | Fixing of 11 KV Cable Jointing kit |
| 188 | Erection of earthing of pole by earth-rod Complete as per RESPO norms |
| 189 | Fixing of G-I Clamp for street light in bridge |
| 190 | Laying of conduit pipe for street light in bridge |
| 191 | Fixing of G-I pipe for street light in bridge |
| 192 | Fixing of 33 KV Tension Clamp with IPC |
| 193 | Fixing of 33 KV Mid Span Jointing Kit |
| 194 | Fixing of 33 KV Cable Ties |
| 195 | Fixing of 33 KV IPC for CC to CC Cond. |
| 196 | Fixing of 33 KV IPC for CC to Bare Cond. |
| 197 | Construction of Metering Room |
| 198 | Erection of SP-23 Double Pole |
| 199 | Dismantling of SP-23 Double Pole |
| 200 | Dismantling of 500 KVA DTR |
| 201 | Installation of HT PRMC |
| 202 | Excavation of Earth for DTR Plinth |
| 203 | Cement Concreting work DTR Plinth |
| 204 | Brick work in 1:4 Ratio DTR Plinth |
| 205 | RR Massonary work for DTR Plinth |
| 206 | RCC work of DTR Plinth |
| 207 | Cement Plaster on DTR Plinth |
| 208 | Inst. 400/500 KVA DTR Plinth |
| 209 | Fixing of Fuse Set |
| 210 | Fixing of 11 KV T-Connector |
| 211 | Manual Shifting of 11 KV PRMC |
| 212 | Supply and Laying of HDPE Pipe |
| 213 | Erection & Laying LT ARM Cable 3.5x400 |
| 214 | Installation of 400 SQ.MM LT AL Lugs |
| 215 | Dismantling of 11 KV PRMC |
| 216 | EXCAVATION IN SOIL |
| 217 | SUPPLY & FIXING OF TOUCH PROOF J/KT 400 |
| 218 | ERECTION & LAYING LT ARM CABLE 3.5X240 |
| 219 | LAYING OF CABLE OF 3.5X150 SQMM. |
| 220 | ERECTION & LAYING LT ARM CABLE 3.5X95 |
| 221 | LAYING OF LT XLPE CABLE 3.5X70SQMM |
| 222 | ERECTION & LAYING OF LT ARM CABLE 3.5X50 |
| 223 | ERECTION & LAYING LT ARM CABLE 4X25 |
| 224 | ERECTION & LAYING LT ARM CABLE 4X16 |
| 225 | ERECTION & LAYING LT ARM CABLE 4X10 |
| 226 | ERECTION & LAYING LT ARM CABLE 4X6 |
| 227 | ERECTION & LAYING OF LT AR. CABLE 2x10 |
| 228 | ERECTION & LAYING OF LT XLPE CABLE 2X6 |
| 229 | RECONNECTIONS OF 11 KV RMU |
| 230 | INSTALLATION OF STRAIGHT THR. 11KV 3X300 |
| 231 | FILLING & FIXING OF LT STRAIGHT THROUGH |
| 232 | FILLING & FIXING OF LT J/K |
| 233 | INSTALLATION OF J/KIT 11KV 3X300 O/D |
| 234 | INSTALLATION OF LT GLANDS |
| 235 | SUPPLY & FIXING WATER PROOF TENT 15'X15' ON RENTAL BASIS |
| 236 | CONSTRUCTION OF 3 WAY RMU PLINTH |
| 237 | MOUNT FIX TEST WITH ALL CONNEC. 3WAY RMU |
| 238 | OPENING OF 11 KV RMU TERMINAL |
| 239 | SHIFTING OF 11 KV RMU |
| 240 | DISMETALING 3 WAY RMU & INSTALLATION |
| 241 | FENCING OF RMU WITH ALL ACCESSORIES |
| 242 | MAKING FOUNDATION OF RMU WITH ALL WORK |
| 243 | DISMENTALING OF C PANNEL |
| 244 | INSTALLATION OF LT & C PANEL |
| 245 | SUPPLY & FIXING FLEXIBLE LIGHT TUBE ON POLE |
| 246 | DISMENTLAING OF A PANNEL |
| 247 | INSTALATION OF A PANNEL |
| 248 | DISMENTLAING OF LT (B) PANNEL |
| 249 | INSTALATION OF LT (B) PANNEL |
| 250 | DISCONNECTION & RECONNECTION OF CONsumer |
| 251 | ROAD CUTTING AND REPAIRING |
| 252 | PAINTING WORK ON PALE FENCING |
| 253 | FENCING OF C TYPE DISTRIBUTION BOX Supply of Manpower |
| 254 | Skilled worker about 80 manpower (As per S.No-12* of Annx-1) |
| 255 | Clerk/Operator for lodging electricity complaints (As per S.No- 12* of Annx-1) |
| 256 | Hiring of Hydraulic Truck to attend shutdown / breakdown Generator |
| 257 | Hiring of 63 KVA Silent Generator (without diesel) including operator, Changeover switch, Cable, Al. Lug , Of appropriate size,Earth rod/Chemical Earhing. & loading & unloading at site & making connection for alternate supply for continuity of supply during Kumbh Mela 2027.(All the DG Sets should comply with the latest CPCB-IV norms as required by notifications of Govt. of India). |
| 258 | Hiring of 35 KVA Silent generator (without diesel) including operator, Changeover switch, Cable, Al. Lug , Of appropriate size,Earth rod/Chemical Earhing. & loading & unloading at site & making connection for alternate supply for continuity of supply during Kumbh Mela 2027.(All the DG Sets should comply with the latest CPCB-IV norms as required by notifications of Govt. of India). Total (B) 0.0 C Dismantling work |
| 259 | Dismantling 33KV ACS AL-59, 232 SQ.mm COVERED CONDUCTOR |
| 260 | Dismantling of 11 KV ACS AL-59,78 SQ MM Covered Conductor |
| 261 | Dismantling of 11 kv XLPE Cable & M.S. Channel safely with opening connection from both sides |
| 262 | Dismantling of LT XLPE AB Cable3x120+1x95+1x16 sq mm |
| 263 | Dismantling of LT XLPE AB Cable3x50+1x35+1x16 sq mm |
| 264 | Dismantling of of LT XLPE Cable AB Cable of size 3cx25+25 sq mm |
| 265 | Dismantling of 11KV Tee-off with complete accessories |
| 266 | Dismantling of 11 KV Double pole(on SP-55) with complete accessories(including opening of stay-wire) |
| 267 | Dismantling of 11 KV Single pole(on SP-55) with complete accessories(including opening of stay-wire) |
| 268 | Dismantaling of 63 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes |
| 269 | Dismantaling of 100 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes |
| 270 | Dismantaling of 250 KVA Transformer from plinth with opening connection of HT side & LT side, opening of fuse set, G.O.Switch,L.A,Capacitor, DTR meter,along with LT cable, DTR LT distribution boxes & fancing |
| 271 | Dismantaling of 400 KVA Transformer from plinth with opening connection of HT side & LT side, opening of fuse set, G.O.Switch,L.A,Capacitor, DTR meter,along with LT cable, DTR LT distribution boxes & fancing |
| 272 | Dismantling of ST pole SP-23 complete (including opening of stay-wire) |
| 273 | Dismantling of ST pole SP-23 (for pole stay) |
| 274 | Dismantling of 1 ph. Meter |
| 275 | Dismantling of 3ph. Meter |
| 276 | Dismantling of LT PRMC |
| 277 | Dismantling of following street light materials from poles |
| 278 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 279 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 280 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 281 | 120 watt LED light fitting with all accessoies (for street light) i. 120 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 282 | Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM) a 63 KVA, 11/0.4 KV Transformer. No. 1.0 0.0 b 100 KVA, 11/0.4 KV Transformer. No. 1.0 0.0 c 250 KVA, 11/0.4 KV Transformer. No. 1.0 0.0 d 400 KVA, 11/0.4 KV Transformer. No. 1.0 0.0 |
| 283 | ST Pole SP-55.. |
| 284 | ST Pole SP-23 |
| 285 | small line material.. |
| 286 | Back Cartage of following material form work site to store including loading, unloading & safe stacking (average distance - 1 to 30Km) |
| 287 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 288 | 70 watt HPSV light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 289 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 290 | 120 watt LED light fitting with all accessoies (for street light) i. 120 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter Total (C) 0.0 D TRANSFORMER TROLLY (TRANSFORMER TROLLY CARTAGE AND MOUNTING WORK) |
| 291 | Mounting of 400 KVA Transformer on trolly with making connection of HT side & LT side |
| 292 | Trolly movement chagres |
| 293 | Dismantling of 400 KVA Transformer from trolly with opening of connection of HT side & LT side(if have) Total (D) 0.0 Total (A+B+C+D) 0.0 Note :- GST will be paid extra as actuals. Company/Firm Name Name Designation Date |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysDec 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.