Tender For Tender For Providing 11 Kv Ht Line, 11/0.4 Kv, 100 Kva Sub Station And 3 Phase Lt Line At Rakh Balla (Mahasa Basti) In (E) Section Nagri Under Electrical Sub Division No. Ii, Hpsebl Palampur. (Ht T.S. No. 142/2026-27) (Dtr T.S. No. 143/202
Tender Overview
Project Description
Tender for Tender For Providing 11 Kv Ht Line, 11/0.4 Kv, 100 Kva Sub Station And 3 Phase Lt Line At Rakh Balla (Mahasa Basti) In (E) Section Nagri Under Electrical Sub Division No. Ii, Hpsebl Palampur. (Ht T.S. No. 142/2026-27) (Dtr T.S. No. 143/2026-27) (Lt T.S. No. 144/2026-27).Sub Work:- Erection Of 11 Kv Ht Line, 100 Kva S/Stn. A/W Lt Line. (Ped 83-2026-27).
BOQ
| Sl. No. | Item Description |
| 1 | Erection of HT Line, DTR and LT Line |
| 2 | Prov. Steel Tubular pole 9 mtr long (Prov. By HPSEBL) |
| 3 | Prov.RCC Muff with concerete feeling |
| 4 | Prov. C.I.X-arm (2400x 100x50x5)x2x2 mm for Double pole Str. |
| 5 | Prov. A.I. X-Arm (2800x50x50x6)mmx2 for guarding of D/P |
| 6 | Prov. C.I.X-arm (1500x100x50x5)x3 mm for single pole str. |
| 7 | Prov. A.I. X-Bracing Set (750x50x50x6)x2mmx3 for guarding |
| 8 | Prov. A.I. X-Arm (1800x50x50x6)x3 mm for guarding of GI wire |
| 9 | Prov. A.I. X-Bracing Set (2800x50x50x6) (1500x50x50x6)x2x2 mm for Double pole Str. |
| 10 | Prov. C.I. (2400x 100x50x5) mm for GO Switch (Length 2x2400)mm |
| 11 | Prov. C.I. (2400x 75x40x6) mm for D.O Fuse Unit (Length 2x2400)mm |
| 12 | Prov. GO Switch Handle Supporting: Channel Iron (460x75x40x6)mm |
| 13 | Prov. Pin Insulator with pin hellically formed fitting (Prov. By HPSEBL) |
| 14 | Prov. Discs Insulator set cleaves with tongue helically formed (Porcelain: 12 kV, BS, 90 KN) |
| 15 | Prov. H.T.Stay set Complete (Prov. By HPSEBL) |
| 16 | Prov.Stay Clamp for Stay Set (Prov. By HPSEBL) |
| 17 | Prov. Half Clamp for Cross arms |
| 18 | Prov. H.T Earthing Set Complete (Prov. By HPSEBL) |
| 19 | Prov. Stay wire 7/3.15 mm (@ 8.0 kg Per Stay set ) |
| 20 | Prov G.I.wire 8 SWG for guarding Across the road |
| 21 | Danger Plate ( 203x200x1.6mm) |
| 22 | Prov. Nut & Bolt ( off sizes ) |
| 23 | Barbed wire |
| 24 | Aluminum Paint |
| 25 | Prov.AAAC 7/3.15mm ( 50mm2 ) (Prov. By HPSEBL) |
| 26 | Prov. Earth Hook HT 8\\" Long |
| 27 | Prov. 11 KV GO Switch |
| 28 | Prov. DO Fuse unit |
| 29 | Prov. Egg insulator HT (Prov. By HPSEBL) |
| 30 | Add Erection charges of AAAC 7/3.15 mm sq. i.e. Laying, Stringing and sagging, Binding with insulator for 0.350 KM |
| 31 | 11/0.4 KV 100 KVA Distribution Transformer (Prov. By HPSEBL) |
| 32 | S/T Pole 9Mtr. W/L 200 kg (Prov. By HPSEBL) |
| 33 | RCC Muff |
| 34 | X-Arm {C.I. (100X50X6 mm) length 2800mm x2} for incomer line (Prov. By HPSEBL) |
| 35 | M.S Angle Iron (50x50x6 mm) length (2800mm)x1 Nos. for LA's (Prov. By HPSEBL) |
| 36 | X-Arm {C.I. (75x40x6 mm) length 2800mm x4} for supporting DO fuse unit & DO switch (Prov. By HPSEBL) |
| 37 | X-Arm {C.I. (100X50X6 mm) length 2800mm x2} for Transformer Bed (Prov. By HPSEBL) |
| 38 | X-Arm {C.I. (100X50X6 mm) length 460mm x2} for Supporting Main Channel of Transformer} (Prov. By HPSEBL) |
| 39 | MS Angle Iron (50X50X6 mm) length 2800mm x2 (Prov. By HPSEBL) |
| 40 | MS Angle Iron (35x35X6 mm) length 460mm x2 (Prov. By HPSEBL) |
| 41 | MS Angle Iron (50x50X6 mm) length 950mm x2} for Bed Knee Bracing (Prov. By HPSEBL) |
| 42 | MS Angle Iron (50X50X6 mm) length 2800mm x2 (Prov. By HPSEBL) |
| 43 | MS Angle Iron (50x50x6 mm) length 450mm x1 (Prov. By HPSEBL) |
| 44 | GO Switch Handle Supporting (C.I. 75x40x6 mm) length 460mm (Prov. By HPSEBL) |
| 45 | G.O.Switch 400 Amp. |
| 46 | D.O.Fuse unit |
| 47 | Lightning Arrestors (Porcelain) (Prov. By HPSEBL) |
| 48 | Disc Insulator with Fitting (Prov. By HPSEBL) |
| 49 | HT Stay Set complete (Prov. By HPSEBL) |
| 50 | Stay Wire 7/3.15 mm ( @ 8.0 kg Per Stay Set) |
| 51 | LT Distribution Panel Box with MCCB 160 Amp. |
| 52 | Pipe Earthing |
| 53 | 6 SWG GI wire for earthing |
| 54 | Half Clamp (M.S. Flat 50X6 mm) |
| 55 | Full Clamp (M.S. Flat 50X6 mm) |
| 56 | M.S. Nuts and Bolts (Off Sizes) |
| 57 | A. Thimble |
| 58 | Cu. Thimble (Prov. By HPSEBL) |
| 59 | Danger Plate |
| 60 | Barbed Wire |
| 61 | LT AB Cable 3.5x120 mm2 |
| 62 | AAAC 7/3.15 mm 50mm2 conductor for earthing, connections and tapping (Prov. By HPSEBL) |
| 63 | LT Energy Meter (3 Phase 4 wire) CT Operated 200/5 A. |
| 64 | Aluminium Paint. |
| 65 | Civil work i.e Chain Link Fencing, Angle Iron, Gate etc. for Transformer fencing |
| 66 | Erection of Sub-Station Complete in all respect |
| 67 | Steel Tubular Pole 8 Mtr. Long (Prov. By HPSEBL) |
| 68 | RCC Muff |
| 69 | Prov. Shackle insulator with D-Iron |
| 70 | Prov. Egg Insulator |
| 71 | Prov. Eye Hook Bolt |
| 72 | LT Stay Set Complete |
| 73 | Stay Wire 7/3.15mm @ 6.0Kg.Per Stay Set |
| 74 | Prov. GI wire 8 SWG |
| 75 | Prov. AAAC 7/3.15 mm (55mm2) (Prov. By HPSEBL) |
| 76 | Prov. Stay Clamp (Prov. By HPSEBL) |
| 77 | M.S Nuts & Bolts (off sizes) |
| 78 | Prov. Aluminium Paint |
| 79 | Add Erection charges of AAAC 7/3.15 mm sq i.e string & sagging, binding with insulator for 0.420 km Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender