Tender For Construction Of Reinforced Cement Concrete Drain From Satsang Vihar Nh-16 Underpass To Main Drain No. 4 In Ward No. 17
Tender Value
2.69 Crore
Estimated cost
Bid Submission
07 Dec 2026
15 days left
EMD
2.69 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Reinforced Cement Concrete Drain From Satsang Vihar Nh-16 Underpass To Main Drain No. 4 In Ward No. 17
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling stone masonry/ brick Masonry in cement or lime mortar up to 3m. height including stacking the useful materials for reuse and removing the debris 50mt lead away from work site as per the direction of the engineer in charge. |
| 2 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries 50mt lead away from work site. |
| 3 | Dismantlling and removing R.C.C. columns, beams, slab, staircase, landing, lintels including stacking the useful materials for re-use and removing the debries 50mt lead away from work site. |
| 4 | Earth work excavation in foundation in all kinds of soil by mechanical meansincluding rough dressing and levelling the bed & depositing the excavated materials away from site with all labour, Machinery, T & P etc. Complete as per the direction of the engineer in charge |
| 5 | Filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. within 50mt initial lead and 1.5mt initial lift complete of all materials to work site as the specification approved by the department and direction of direction of Engineer -in-charge |
| 6 | Cement Concrete (1:3:6) with 4cm size Hard Granite Crusher Broken metal mixed with concrete mixer including all cost, conveyance, royalty & taxes etc.within 50mt initial lead and 1.5mt initial lift compete of all materials to work site as per specification and direction of Engineer-in-charge. |
| 7 | R.C.C M25 grade with crushed granite coarse aggregate of size 20mm down graded mixed with concrete mixer with all leads, lifts and delifts including cost, coveyance, royalty & taxes etc. of all materials, all labour charges, T&P, hire & running charges of all machinaries & equipment as required, watering & curing within 50mt initial lead and 1.5mt initial lift etc. complete as per direction of Engineer-in-charge. |
| 8 | Supplying fitting & placing uncoated HYSD reinforcement including cutting, bendind, binding & placing the steel rods as per drawing & technical specification approved by the department with cost of binding wire 18 to 20 gauge as per specification approved by the department within 50mt initial lead and 1.5mt initial lift & direction of Engineer in charge. |
| 9 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in A) R.C.C. foundation, plinth band, footing, base of columns mass concrete, precast slab etc |
| 10 | B) R.C.C. Roof slab upto 4.00 mtr. height. |
| 11 | Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessoriesfor walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system. Tilts form. table moulds battery |
| 12 | Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all completeas per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works ie hangers. All work un to fifth floor (Sor -2022 раде no.258) |
| 13 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum, laterite stone, washed gravel, flyash and earth away from the work site by mechanical means including loading and unloading and disposing the same within 5km truck lead as per the direction of the Engineer in charge. |
| 14 | Supplying fixing fitting and Chain link fencing over drain using ms Angles of size 65 x 65 x 6 mm. Ms flats of size 35 x 6 mm and chain link wire with cost conveyance taxes of all material and labour T & P complete as per direction of Engineer in charge. |
| 15 | Construction of Coffer Dam for diversion of water by collecting, supplying and stacking at worksite sand from approved quarry and filling the empty cement bags, sewing in strings and placing in proper position at all heights with all labour, T&P charges, cost of strings and labour welfare cess etc.complete as per direction of the Engineer-in-charge |
| 16 | Providing weep holes in masonry Plain/R.C.C abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V:20H towards drawing face complete including labour & all materials as per the direction of the Engineer-in-Charge. |
| 17 | Dewatering of water from running drains, foundation trenches & other water logging areas etc. using pumps with 5HP diesel engine including all labour charges, T&P, hire & running charges of all machinaries & equipment as required etc. complete as per direction of Engineer-in-charge. |
| 18 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works for compound wall fencing. complete as per drawing including priming with one coat of red ovide primer in all floors as per the |
| 19 | Cost of Transparency display board with colouring and lettering including all Cost, conveyance, labour charges etc. and other unforeseen item if any. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender