Tender For Biennial Maintenance Contract (Bmc) For Jobs Related To All Boiler Pressure Parts & Auxiliaries For Unit No.-1 &2; Under Bm1; Sgtpp For 02 (Two) Years From 01.01.2027 To 31.12.2028.
Tender Value
6.71 Crore
Estimated cost
Bid Submission
21 Dec 2026
30 days left
EMD
13.43 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Murshidabad → West Bengal
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Biennial Maintenance Contract (Bmc) For Jobs Related To All Boiler Pressure Parts & Auxiliaries For Unit No.-1 &2; Under Bm1; Sgtpp For 02 (Two) Years From 01.01.2027 To 31.12.2028.
BOQ
| Sl. No. | Item Description |
| 1 | MANDATORY JOBS |
| 2 | DAILY OR RUNNING MAINTENANCE |
| 3 | Cost of Safety equipment |
| 4 | RATE CONTRACT FOR PIECEMEAL JOB |
| 5 | Coal mill Major overhauling as per scope of work in annexure 2A including the supply of all consumables, manpower, T&P, measuring instruments, Scaffolding etc. |
| 6 | Coal mill mini overhauling as per scope of work in annexure 2B including the supply of all consumables,manpower, T&P, measuring instruments, Scaffolding etc. |
| 7 | Gear Box Replacement as per annexure 2C including the supply of all consumables, manpower,T&P, measuring instruments, Scaffolding etc. |
| 8 | Servicing of Coal Mill Gear Bix Input Shaft |
| 9 | Coal Feeder overhauling as per annexure 2D |
| 10 | Additional tyre servicing |
| 11 | Cleaning, stacking, loading, carriage over pucca road and unloading at destination(within 5 km lead) of ash and coal mill rejects from rejection conveyor tunnel and surroundings with the scope of supply of manpower, Tools and tackles, conveying vehicle (like tractor) with operator andfuel.[PER 500 M3]. |
| 12 | All SADC internal checking in all corner of Boiler ,dismantling /freeness checking, replacement of bush /bearing, repairing of erosion ,coupling with power cylinder operation and complete box up of all doors of secondary air duct with gasket and necessary scaffolding |
| 13 | HFO/LDO/Air nozzle/Coal nozzle system Tilting checking by opening the boiler door, reach rod adjustment /cleaning /replacement (wherever needed) necessary full welding,door repairing with necessary scaffolding and complete box up of doors, Scrap removal & checking of operation |
| 14 | Coal nozzle tip,Oil nozzle tip,Air Nozzle tip, checking by opening Boiler door at bottom hopper with necessary scaffolding in furnace necessary rectification ,with all kinds of allied jobs, angle of burner tilting adjustment and complete boxup |
| 15 | Sky climber fitting in the Boiler & dismantling for burner check up & operation during burner checking |
| 16 | Replacement of damaged coal Compartment assembly with all associated work.(without scaffolding) |
| 17 | CCP bend dismantling, replacement welding, pipe alignment, with hanger support adjustment with necessary scaffolding and removal of scrap from site to scrap yard |
| 18 | CCP straight pipe dismantling replacement, welding, pipe alignment, with hanger support adjustment with necessary scaffolding and removal of scrap from site to scrap yard. |
| 19 | Replacement of Seal air fan with new bearing ,bearing housing, coupling, impeller , shaft bearing cooling water line modification after removal of old Seal air fan |
| 20 | Duct Repairing |
| 21 | Replacement of APH Guide Bearing assy. with all associated work APH(Model : LAP10320/3883) |
| 22 | Replacement of APH Support assy. with all associated work APH(Model : LAP10320/3883) |
| 23 | Replacement of Gear Box of APH along with all associated work(Time: 02 days (Model :LAP10320/3883). |
| 24 | Replacement of CCP O/L Gate |
| 25 | Checking/Replacement of CCP Orifice |
| 26 | Replacement of Coal Mill Rejection Pipe |
| 27 | Cleaning of ash/ Mill inside coal |
| 28 | ID Fan Bearing Replacement |
| 29 | PA Fan Blade Replacement |
| 30 | FD Fan Blade Replacement |
| 31 | HFO/ LDO Pump Replacement |
| 32 | Servicing Of PA Fan Rotor including Bearing replacement |
| 33 | Servicing Of FD Fan Rotor Including Bearing Replacement |
| 34 | Replacement of MPO(Spool Piece) |
| 35 | ID/FD/PA/MILL Motor shifting |
| 36 | Safety valve servicing |
| 37 | APH seal adjustment |
| 38 | Boiler Tube Leakage |
| 39 | Water Wall Tube Joint without |
| 40 | Economiser Coil/LTSH bottom bank/Steam Cooled Wall Joint without scaffolding |
| 41 | Roof Tube Joint without scaffolding |
| 42 | Spacer Tube Joint without scaffolding |
| 43 | LTSH and Eco. Hanger Tube Joint |
| 44 | Screen Tube Joint without scaffolding. |
| 45 | All Reheater Joint with scaffolding (except Wall Reheater and Medium Reheater where extra payment will be made for any scaffolding beyond 6 m Horizontal and 6 m Vertical) |
| 46 | LTSH middle / top bank Joint without scaffolding |
| 47 | Other Superheater Joint excluding LTSH with scaffolding upto 6 m Vertical and 6 m Horizontal. |
| 48 | Division Panel without scaffolding |
| 49 | Stress Relieving |
| 50 | Radiography |
| 51 | Vertical scaffolding for approaching Furnace/ Roof Tube/ Wall Reheater/ MRH/Platen/ Division panel |
| 52 | Horizontal scaffolding for approaching Medium & Wall RH/ Platen SH/ Divisional Panel/ SCW/ Roof Tubes/ Furnace (Total to exceed 10 m) |
| 53 | Membrane strip/Skin casing welding per METER |
| 54 | Removal, Fabrication and Fitting of Guard Tube and Guard Plate |
| 55 | Build up in eroded Tubes as |
| 56 | Economiser coil lifting, repairing, fitting & jointing with proper alignment |
| 57 | LTSH coil pulling , inspection, proper alignment of coil & panel with clit and support welding |
| 58 | Second pass scaffolding |
| 59 | Scaffolding of Economiser Zone and cleaning of Economiser Zone and LTSH by LP water |
| 60 | BOILER INSPECTOR SUNDRY EXPENSES (OTHER THAN FEES) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 30 daysDec 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 33 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender