Tender For Construction And Renovation Of Drain Including Laying 300 Mm Dia Sewer Line From Hunman Jute Mill Hospital To Shriramdang Road & Dameged Portion Upto Fultala Ghat Under Hmc Ward No 1,4 & 11.
Tender Value
93.45 Lakhs
Estimated cost
Bid Submission
02 Dec 2026
9 days left
EMD
1.86 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Howrah → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction And Renovation Of Drain Including Laying 300 Mm Dia Sewer Line From Hunman Jute Mill Hospital To Shriramdang Road & Dameged Portion Upto Fultala Ghat Under Hmc Ward No 1,4 & 11.
BOQ
| Sl. No. | Item Description |
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar [Ref : CPWD Vol-II Page-220, It- 15.7.4] |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) [Ref : CPWD Vol-II Page-220, It- 15.2.1] |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. [Ref : CPWD Vol-I Page-87, It-2.8.1] |
| 4 | Supply of Fine sand (zone IV) [Ref : CPWD Vol-I Page-15, It-0983] |
| 5 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 [Ref : CPWD Vol-I Page-227, It-16.12.1] |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : ii) 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) [Ref : CPWD Vol-I Page-96, It-4.1.6] |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) [Ref : CPWD Vol-I Page-118, It- 6.1.1] |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) [Ref : CPWD Vol-I Page-118, It- 6.23.2] |
| 9 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush. White sand stone [Ref : CPWD Vol-I Page-178, It- 11.28.2] |
| 10 | 20 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) [Ref : CPWD Vol-II Page-200, It- 13.6.1] |
| 11 | Neat cement punning. [Ref : CPWD Vol-II Page-201, It- 13.18] |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) [Ref : CPWD Vol-I Page-96, It-4.1.2] |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns [Ref : CPWD Vol-I Page-98, It- 4.3.1] |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Mild steel and Medium Tensile steel bars [Ref : CPWD Vol-I Page-110, It- 5.22A.1] |
| 15 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arockincluding cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth ofcushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. WBPHED-2019, Item no-2.A.ii,l, Pg no-L3 |
| 16 | Constructing gully pit to a depth of 1.50m (Inside) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (225mm dia) with topping RCPC gully grid (15MT load bearing capacity) constructing invert with brick-on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 150mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials. Inside measurement of gully pit, 1100mm × 600mm |
| 17 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal , where continuous flow of water from a source other than natural or ground water in encountered in case of emergency maintenance works related to leakage, breakage and making wet connections [Ref : K.M.D.A. (Water supply), Page-24, It. -7.2]. |
| 18 | Supply of empty cement bags in good condition.[Ref : P.W.D.(Rds.), Page -325, Item-18.28] |
| 19 | Labour for filling up cement bags with sand and placing them up in position including tying and sewing mouth (cost of thread included) and all incidental charges complete but excluding cost of sand and sunny bags. [Ref : P.W.D.(Rds.), Page -325, Item-18.29] |
| 20 | Add 18% GST |
| 21 | Add 1% Cess Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysDec 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.