Tender For General-Bridge In Neyyar River Basin-Site Investigation - Construction Of A Bridge Across Chittar / Kudayal Stream Connecting Thathiyoor Aqueduct And Edanji-Investigation Work
Tender Value
2.37 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
3 days left
EMD
5930
Bank guarantee accepted
Document Fee
555
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvananthapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for General-Bridge In Neyyar River Basin-Site Investigation - Construction Of A Bridge Across Chittar / Kudayal Stream Connecting Thathiyoor Aqueduct And Edanji-Investigation Work
BOQ
| Sl. No. | Item Description |
| 1 | Investigation work |
| 2 | 60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high \\"TBM\\" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation. |
| 3 | 60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day ) |
| 4 | OD10618/2026-2027:Conducting topographic survey in banks of river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan, cross sections, longitudinal sections etc ), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of copies CD/DVD, 5 numbers of hard copies of print outa etc complete as per the direction of departmental officers at site ( outturn 3 hect/day) |
| 5 | OD10619/2026-2027:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale ( plan, cross sections, longitudinal sections etc ), indicating the contour lines 2m interval in digitized forms including supplying 5 numbers of copies CD/DVD, 5 numbers of hard copies of print outa etc complete as per the direction of departmental officers at site ( outturn 6 hect/day) |
| 6 | OD38179/2026-2027:Specification code: 56.1.a- Mobilization including transportation of all necessary plant and equipment's and materials ofboring, field testing and sampling and demobilization after completing the work - For machineboring |
| 7 | OD38178/2026-2027:Specification code: 56.2.a- Setting up boring at each bore hole locations including carrying all necessary plant, equipmentand materials of boring and field tests and collection of samples at each bore hole location - Formachine boring. |
| 8 | OD38172/2026-2027:Specification code: 56.4 - Boring through all type of hard rock or similar refusal strata of N value greater than 50 usingdiamond core drilling bit for in land under water and banks of river. |
| 9 | OD38173/2026-2027:Specification code: 56.5.b - Boring through all classes of rock excluding hard rocks having N value greater than 50 usingtungsten carbide drilling bit - In Water |
| 10 | OD38174/2026-2027:Specification code: 56.5.a - Boring through all classes of rock excluding hard rocks having N value greater than 50 usingtungsten carbide drilling bit - In land |
| 11 | OD38175/2026-2027:Specification code: 56.3.a.2 - Boring with rotary power drilling equipment's in - all types of soil having N value less than 50excluding hard rock, soft rock or medium rock for strata upto 10m including conductingnecessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. |
| 12 | OD38176/2026-2027:Specification code: 56.3.a.1- Boring with rotary power drilling equipment's in - all types of soil having N value less than 50excluding hard rock, soft rock or medium rock for strata upto 10m including conductingnecessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
| 13 | 56.5:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire charges of boats. Note: A Platform of minimum size 6.00 m x 5.00 m will be required. |
| 14 | OD38012/2026-2027:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc. |
| 15 | 56.14.2:Preparing Geotechnical Investigation Report for Minor/Major Bridge Projects in standard format as prescribed by the Department, containing site details, project description, regional geological conditions, regional natural hazards (seismicity, landslides, land subsidences), adopted soil exploration methods, field tests conducted, laboratory tests carried out, analysis and discussion of test results, recommendations for geotechnical parameters as instructed by Department Officers based on field/laboratory test results for design of bridge foundations, retaining structures/techniques for approach roads, if any, ground improvement techniques for supporting earthen embankment, if any, etc. with necessary supporting calculations, comments on issues which may encounter during excavation, foundation construction and remedies suggested, comments on geotechnical parameters affected by natural hazards such as earthquake, landslides, land subsidence(piping), if any, etc. complete in three hard copies with soft copy in pdf format. Note: The field test results, laboratory test results and recommendations shall be approved by a Geotechnical Engineer. The recommendation shall be based on maximum of 5 machine borings. For each extra bore holes additional amount may be paid separately. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender