Tender For Widening And Strengthening Work Of The Delhi Yamunotri Road Village Katha To Khekda Link Road In District Baghpat Under The Financial Year 2026-27.
Tender Value
7.04 Crore
Estimated cost
Bid Submission
26 Nov 2026
4 days left
EMD
14.09 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baghpat → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Widening And Strengthening Work Of The Delhi Yamunotri Road Village Katha To Khekda Link Road In District Baghpat Under The Financial Year 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Scarifying the existing bitumeinous rod surface to a depth of 50 mm and disposal of scarified material with in all lifts and laead upto 1000 metres as per cluase 3.15 (305.4.3). Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 2 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removaland disposal of top organic. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 4 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading-I Material. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 7 | Providing, laying and spreading fo graded stone aggregate (WMM) after mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform single layer with paver as cemented base on sub- base / subgrade (modified soil) and compacting with the road roller to achieve unconfined compressive as specified by Engr-in-charge. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 9 | Providing and applying primer coat with SS1 bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7 kg/sqm using mechanical means. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 10 | Providing and laying bituminous concrete with higher capacity batch Type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying Paver finisher hydrostatic with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ( Bitumen VG-30). Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 11 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Without Dowl Bar. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 12 | Providing and laying of interlocking tiles concrete block pavement having thickness 80 mm with 3 cm compacted fine sand bed as per drawings and technical specification as per direction of Engineer in charge. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 13 | Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 14 | PCC Grade M15 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical specifications. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 15 | PCC Grade M20 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 16 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 17 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 18 | Providing and laying reinforced cement concrete NP3 pipe for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works, backfilling concrete and masonary work in head wall and parapets clause 1106 (As per attached analysis). Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 19 | Providing and Fixing of Km. Stone. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 20 | Providing and Fixing of Hecto meter stone. Including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge |
| 21 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IInd Year 0.00% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 22 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IInd Year 0.25% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 23 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IIIrd Year 0.50% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 24 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IVrth Year 0.75% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO |
| 25 | Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.Vth Year 1.00% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysNov 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender