Tender For Development Of Visitor Amenities And Infrastructure In Samiyarpettai Beach Silambimangalam Panchayat Parangipettai Block
Tender Value
75 Lakhs
Estimated cost
Bid Submission
02 Dec 2026
12 days left
EMD
75000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuddalore → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Development Of Visitor Amenities And Infrastructure In Samiyarpettai Beach Silambimangalam Panchayat Parangipettai Block
BOQ
| Sl. No. | Item Description |
| 1 | Two Wheeler Parking Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation and compacting the excavated soil in the sides of the corewall. |
| 2 | Supplying and Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed |
| 4 | Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers |
| 5 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 6 | Cement concrete 1:1.5:3 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 7 | Provision for Bitumen Pad |
| 8 | Provision for White Marking |
| 9 | Providing CC Pavement Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation and compacting the excavated soil in the sides of the corewall. |
| 10 | Supplying and Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 11 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed |
| 12 | Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers |
| 13 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 14 | construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 |
| 15 | Cement concrete 1:1.5:3 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 16 | Provision for Bitumen Pad |
| 17 | Provision for 110mm dia PVC Pipe |
| 18 | Development of Visitor Amenities Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 19 | msand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications |
| 20 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling including all cost and conveyance of all materials and all labour charges etc., complete. |
| 21 | Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. |
| 22 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 23 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 24 | Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete |
| 25 | Providing Multi Sports Flooring with Flexible Polypropylene Tile(0.30m x 0.30m) etc complete.., |
| 26 | Supplying and erection of Portable Basket Ball Post including cost and all charges |
| 27 | Car Parking Yard Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation and compacting the excavated soil in the sides of the corewall. |
| 28 | Supplying and Sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 29 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed |
| 30 | Supplying & Erecting centering for sides & soffits including necessary supports etc., complete complying with standard specifications and as directed by the departmental officers |
| 31 | Cement concrete 1:2:4 mix Using 20mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 32 | Cement concrete 1:1.5:3 mix Using 20 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. |
| 33 | Provision for Bitumen Pad |
| 34 | Provision for White Marking |
| 35 | Provision for Name board |
| 36 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 20, 2026
11:30 IST
Tender Published
Tender notice published.
TodayDec 02, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysDec 02, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender