Tender For Preparation Of Emergency Action Plan (Eap), Dam Break Analysis And Flood Inundation Mapping Of Projects For Omerga, Lohara & Tuljapur Taluka Dist. Dharashiy
Tender Overview
Project Description
Tender For Preparation Of Emergency Action Plan (Eap), Dam Break Analysis And Flood Inundation Mapping Of Projects For Omerga, Lohara & Tuljapur Taluka Dist. Dharashiy |Item No, 1 Preparation Of Design Flood Study Of A Dam As Per Cwc Guidelines, Considering The Hydrological And I Meteorological Data Item No. 2 Including Detailed Reporting On Atenment Area (Covering Both Physiography, Upstream And Doteem Reaches.), Collection And Analysis Of Historical Data (30 To B0 Topography, Climatology, Hydrology, And Geological Formation Of The Et Ar Ncdaing Nyarological Current Models Year) Relating And Methods To Rainfall River Discharge, Reservoir Inflow, And Other Relevant Parameters Using Servadons, Preparation Of Separate Detailed As Chantors Ner Cwc Survey-Based Figures And Guidelines, Incorporation Of Actuall Sunaion Of Inflows Into The Reservoir For Survey Findings And Model Applications In The Final Report. |Or Probable Maximum Flood (Pme) Using Availahle Bistorical Data And Appropriate Hydrological Methods, Assessment Pomssion Of A Comprehensive Design Fleod Levels With Supporting Calculations And Justifications. Preparation And| Complete As Directed By Final Report With Necessary Illustrations, Figures, Data Tables, And Recommendations Etc. Engineer-In-Charge. 1) Dam Failure At Frl Under Fair Weather Conditions. Omerga, Ohara & Tuljapur Taluka Dist. Dharashiy Carrying Out Detailed Scenario Analysis For 2-Dimensional Hydraulic Simulation Of Flood Releases From Dam, Including Lateral Inflows From Tributaries And Nalas Into The Main River, With The Objective Of Preventing Flood Inundation In The |Downstream City Areas, Including Dam Break Analvsis (Tier-1) As Per The Provisions (To The Extent Modified And Superseded) Of The Guidelines For Developing Emergencv Action Plans For Dams (February 2016, Doc. No. Cdso-Gud-Ds |O1-V2.0), Development Of 2D Hydraulic Simulation Models Incorporating Inflows, Dam Releases, And Lateral Contributions, Preparation Of Flood Routing Scenarios Downstream. Estimation Of Safe Carrying Capacity Of Downstream Channels Evaluation Of Safe Water Levels In Affected Areas, Flood Plain Mapping Using Digital Land Cover Maps With Minimum 5.8 M |Grid Resolution, Comprehensive Technical Report Including Methodology, Data Sets, Model Results, Graphs, Tables, And Interpretation Of Outputs, Digital Outputs, Inundation Maps, And Simulation Data In Soft Copy Etc Complete As Directed By Engineer In Charge. Dam Break Study Shall Be Carried Out For Following Conditions: Item Of Work 2) Dam Failure At Mwl Under Pme/ Spf/ Design Flood Inflow Conditions. Item No. 3 3) Flood Routing Without Dam Break, For Spillway And Gated Releases Under Pmf Or Design Flood. Abstract 4) Other Relevant Critical Conditions Peculiar To The Dam (E.G, High Spillway Discharges That Are Structurally Safe But May Create Emergency Situations Downstream). |Item No. 4 Preparation Of Flood Inundation Maps Clearly Depicting Flooded Areas Under Conditions Specified In Item No.2, Showing Time Of Arrival Of Flood Wave, Maximum Depth Of Inundation, Maximum Velocity Of Flow, And Water Surface Elevations. Maps Shall Be Prepared Based On Two-Dimensional Depth-Averaged Flow Modelling, Incorporating All Levees, Bridges, Culverts, And Other Relevant Structures, As Per Provisions Of The Guidelines For Developing Emergency Action Plans For Dams (Feb 2016, Doc. No. Cdso-Gud-Ds-01-V2.0) At The Scale Of 1:10,000 For Non-Urbanized Areas And 1:5,000 For Lurbanized Areas On A1 Sheets Including All Sensitive Installations, Etc. Complete As Directed By The Engineer-In-Charge. Item No. 5 Determination And Identification Of Triggering Events For Initiation Of Emergency Action Plan (Eap), Specifying Actions To Be Taken And All Concerned Responsible Agencies/Persons; Identification Of Jurisdictions And Stakeholders With Whom Eap Shall Be Discussed; Field Visits For Data Collection, Ground Truthing Of Surveyed And Satellite Data At Critical Locations; Ldiscussions On Need And Operation Of Emergency Operations Centre And Reception Centre, Evacuation Planning Destinations, Priorities, Procedures), Post-Flood Actions (Recovery And Cleanup), And Other Emergency Measures, Etc. Complete As Directed By Engineer-In-Charge. Tdentify Primary And Auxiliary Communication Systems, Both Internal (Between Persons At The Dam Site) And External Heween Dam Personnel And Outside Entities) With Presentation In Easy Charts For All Communication. List And Prioritize All Persons And Entities Involved In The Notitication Process And Draft The Notification Flowchart. Develop A Draft Of The Item No. 6 Eap As Per The Guidelines Provided In Cwc (2016) Report And As Per Provisions To The Extent Modified And I Super-Ceded In Two Days Training Of Officials Of Dam E Guidelines For Developing Emergency Action Plans For Dams (Feb 2016, Doc. No, Cdso-Gud-Ds-01-V2.0), And Including All Etc. Complete As Directed By Engineer-In-Charge. Owner, Concerned Departments, Stakeholders, Opinion Makers, Travel, Etc. Complete As Directed By Engineer-In-Charge. Local Administration, Police, Fire Services, Village Panchayats, And State Disaster Management Unit Involved In The Eap, Dissemination Of Final Study To All Stakeholders And Local Population In Possible
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender