Defence Statutory Bodies & Commissions/Committees Closing in 5 days TDR #58622497

Bids Are invited for Surface Dressing N Exc 15 Cm Deep And Getting Out Soft Loose Soil Complete - Surface Dressing N Exc 15 Cm Deep And Getting Out Soft/Loose Soil Complete , Excavation In Trenches Not Exc 1.5M Wide And Not Exc 1.5M Deep For Foundati

Issued by Statutory Bodies & Commissions/Committees · Bardhaman, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 Nov 2026
5 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bardhaman → West Bengal
EMD Exemption
Not Available
Quantity
1062

Project Description

Bids Are invited for Surface Dressing N Exc 15 Cm Deep And Getting Out Soft Loose Soil Complete - Surface Dressing N Exc 15 Cm Deep And Getting Out Soft/Loose Soil Complete , Excavation In Trenches Not Exc 1.5M Wide And Not Exc 1.5M Deep For Foundation Etc Or For Shafts N Exc 10 Sqm On Plan And N Exc 1.5M In Depth And Getting Out In Soft Or Loose Soil Complete , M And L For Kankar Or Laterite With Mix Of Fly Ash Clinker Stone Dust In The Proportion Of 1 3 6 Laying In Layers N Exc 100Mm Thick Watering Ramming And Compacted Complete - M And L For Kankar Or Laterite With Mix Of Fly Ash Clinker Stone Dust In The Proportion Of 1 3 6 Laying In Layers N Exc 100Mm Thick Watering Ramming And Compacted Complete , M And L For Broken Stone Or Boulders Hard Core Gauge N Exc 63Mm Deposited Spread And Levelled In Layers N Exc 15Cm Thick Watered And Rammed To A True Surfaces Complete All As Specified And Directed , M And L For Pcc 1 4 8 Type D 2 As In Bed Concrete For Foundation Filling And Mass Concrete Complete All As Specified And Directed - M And L For Pcc 1 4 8 Type D2 As In Bed Concrete For Foundation Filling And Mass Concrete Complete All As Specified And Directed , M And L For Reinforced Cement Concrete Design Mix M 25 Foundations Including Rafts Footings Foundation Beams Plinth Beams Bases For Columns , M And L For Reinforced Cement Concrete Design Mix M 25 20Mm Graded Stone Aggregate In Columns Pillars Piers Etc Complete All As Specified And Directed , M And L For Tmt Bars 10Mm Dia And Over Cut To Length Bent To Shape Required Not Less Than 0.9Mm Dia Or Securing With Clips Complets All As Specified And Directed - M And L For Tmt Bars 10Mm Dia And Over Cut To Length Bent To Shape Required Including Cranking Bending Spirally For Hooping For Columns Hooking Ends And Binding With The Including Mild Steel Wire Not Less Than 0.9Mm Dia Or Securing With Clips Complets All As Specified And Directed , Ditto But 5Mm Dia And Over Upto And Including 10Mm Dia In Stirrups Spacers And Binders Complete All As Specified And Directed , M And L For Formwork To Sides Of Concrete Foundations For Rough Finished Surfaces Of Concrete Complete All As Specified And Directed - M And L For Formwork To Sides Of Concrete Foundations Footings Bases Of Columns Raft And Raft Beams Sides And Soffit Of Foundation And Plinth Beams And Similar Work Vertical Or To Batter For Rough Finished Surfaces Of Concrete Complete All As Specified And Directed , M And L For Formwork For Rough Finished Surface Of Concrete Flat Surface To Sides Of Pillars Concrete Complete All As Specified And Directed - M And L For Formwork For Rough Finished Surface Of Concrete Flat Surface To Sides Of Pillars Posts Struts Piers Columns And Stanchions For Fair Finished Surfaces Of Concrete Complete All As Specified And Directed , M And L For Old Size Brickwork With Fly Ash Bricks Straight Or Curved On Plan To Any Radius Built In Cm 1 6 Complete All As Specified And Directed , Removing Surplus Soil To A Distance Not Exceeding 50 Mtr And Directed At A Level Not Exceeding 1.5 Mtr Above The Starting Point Complete All As Specified And Directed - Removing Surplus Soil To A Distance Not Exceeding 50 Mtr And Depositing Where Directed At A Level Not Exceeding 1.5 Mtr Above The Starting Point Complete All As Specified And Directed , Returning Filling In Including Spreading Levelling Watering And Well Ramming In Layers Not Exc 25 Cm In Soft Or Loose Complete All As Specified And Directed , S And F For Frp Display Panel Boards Size 14 7 Minimum 30Mm To 50Mm Thickness With Smooth White Weather Resistant With Anti Uv Coating Anchored On Frp Structure - S And F For Frp Display Panel Boards Size 14X7 Minimum 30Mm To 50Mm Thickness With Smooth White Weather Resistant With Anti Uv Coating Anchored On Frp Structure , S And F For Frp Designer 10 Ft Roman Pillar With Minimum Dia 40 To 60Cm Heavy Duty Anchor Bolts With Smooth White Weather Resistant With Anti Uv Coating - S And F For Frp Designer 10 Ft Roman Pillar With Minimum Dia 40 To 60Cm Thick Includes Drilled Top Sections Or Mounting Arms And Hot Dip Galvanized Ms Or Frp Coated Base Plates Secured With Heavy Duty Anchor Bolts With Smooth White Weather Resistant With Anti Uv Coating , S And F For Frp Upper Beam With Ms Or Iron Base Designed With Tile Matchign Alongwith Other Connected Items Complete - S And F For Frp Upper Beam With Ms Or Iron Base Designed With Tile Matchign Finsh Warm Light Water Supply Pipe Including Setting Testing And Installation Of Aligngment Of Existing Fountain Alongwith Other Connected Items Complete , S And F For Parking Stand Floor Mount Heavy Duty Mild Steel 20 Mm Dia Min Thickness 1.50 Mm With Powder Coated - S And F For Parking Stand Floor Mount Cycle Storage Rack Space Saving Staggered Or Modular Arrangement Heavy Duty Mild Steel 20 Mm Dia Min Thickness 1.50 Mm With Powder Coated Or Galvanized Finish To Resist Rust And Scratches To Mounted Via Drilled Concrete Anchor Bolts Or Directly In Ground Cycle Stand For Outdoor Use Capacity For Stores Upto 10 Cycle Each Stand

BOQ

Sl. No. Item TitleItem Description
1Surface dressing n exc 15 cm deep and getting out soft loose soil completeSurface dressing n exc 15 cm deep and getting out soft/loose soil complete
2Excavation in trenches not exc 1.5m wide and not exc 1.5m deep for foundation etc or for shafts n exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft or loose soil completeExcavation in trenches not exc 1.5m wide and not exc 1.5m deep for foundation etc or for shafts n exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft or loose soil complete
3M and L for Kankar or laterite with mix of fly ash clinker stone dust in the proportion of 1 3 6 laying in layers n exc 100mm thick watering ramming and compacted completeM and L for Kankar or laterite with mix of fly ash clinker stone dust in the proportion of 1 3 6 laying in layers n exc 100mm thick watering ramming and compacted complete
4M and L for broken stone or boulders hard core gauge n exc 63mm deposited spread and levelled in layers n exc 15cm thick watered and rammed to a true surfaces complete all as specified and directedM and L for broken stone or boulders hard core gauge n exc 63mm deposited spread and levelled in layers n exc 15cm thick watered and rammed to a true surfaces complete all as specified and directed
5M and L for PCC 1 4 8 type D 2 as in bed concrete for foundation filling and mass concrete complete all as specified and directedM and L for PCC 1 4 8 type D2 as in bed concrete for foundation filling and mass concrete complete all as specified and directed
6M and L for reinforced cement concrete Design Mix M 25 foundations including rafts footings foundation beams plinth beams bases for columnsM and L for reinforced cement concrete Design Mix M 25 foundations including rafts footings foundation beams plinth beams bases for columns
7M and L for reinforced cement concrete Design Mix M 25 20mm graded stone aggregate in columns pillars piers etc complete all as specified and directedM and L for reinforced cement concrete Design Mix M 25 20mm graded stone aggregate in columns pillars piers etc complete all as specified and directed
8M and L for TMT bars 10mm dia and over cut to length bent to shape required not less than 0.9mm dia or securing with clips complets all as specified and directedM and L for TMT bars 10mm dia and over cut to length bent to shape required including cranking bending spirally for hooping for columns hooking ends and binding with the including mild steel wire not less than 0.9mm dia or securing with clips complets all as specified and directed
9Ditto but 5mm dia and over upto and including 10mm dia in stirrups spacers and binders complete all as specified and directedDitto but 5mm dia and over upto and including 10mm dia in stirrups spacers and binders complete all as specified and directed
10M and L for formwork to sides of concrete foundations for rough finished surfaces of concrete complete all as specified and directedM and L for formwork to sides of concrete foundations footings bases of columns raft and raft beams sides and soffit of foundation and plinth beams and similar work vertical or to batter for rough finished surfaces of concrete complete all as specified and directed
11M and L for formwork for rough finished surface of concrete flat surface to sides of pillars concrete complete all as specified and directedM and L for formwork for rough finished surface of concrete flat surface to sides of pillars posts struts piers columns and stanchions for fair finished surfaces of concrete complete all as specified and directed
12M and L for old size brickwork with fly ash bricks straight or curved on plan to any radius built in CM 1 6 complete all as specified and directedM and L for old size brickwork with fly ash bricks straight or curved on plan to any radius built in CM 1 6 complete all as specified and directed
13Removing surplus soil to a distance not exceeding 50 mtr and directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directedRemoving surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed
14Returning filling in including spreading levelling watering and well ramming in layers not exc 25 cm in soft or loose complete all as specified and directedReturning filling in including spreading levelling watering and well ramming in layers not exc 25 cm in soft or loose complete all as specified and directed
15S and F for FRP display panel boards Size 14 7 minimum 30mm to 50mm thickness with smooth white weather resistant with anti UV coating anchored on FRP structureS and F for FRP display panel boards Size 14X7 minimum 30mm to 50mm thickness with smooth white weather resistant with anti UV coating anchored on FRP structure
16S and F for FRP designer 10 ft Roman pillar with minimum dia 40 to 60cm heavy duty anchor bolts with smooth white weather resistant with anti UV coatingS and F for FRP designer 10 ft Roman pillar with minimum dia 40 to 60cm thick includes drilled top sections or mounting arms and hot dip galvanized MS or FRP coated base plates secured with heavy duty anchor bolts with smooth white weather resistant with anti UV coating
17S and F for FRP upper beam with MS or Iron base designed with tile matchign alongwith other connected items completeS and F for FRP upper beam with MS or Iron base designed with tile matchign finsh warm light water supply pipe including setting testing and installation of aligngment of existing fountain alongwith other connected items complete
18S and F for parking stand floor mount heavy duty mild steel 20 mm dia min thickness 1.50 mm with powder coatedS and F for parking stand floor mount cycle storage rack space saving staggered or modular arrangement heavy duty mild steel 20 mm dia min thickness 1.50 mm with powder coated or galvanized finish to resist rust and scratches to mounted via drilled concrete anchor bolts or directly in ground cycle stand for outdoor use capacity for stores upto 10 cycle each stand

AI Tender Summary

OUR REF NO 58622497
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE Ref. Documents
LAST DATE 30-11-2026
Authority
Authority Name Indian Army
Work Description Bids Are invited for Surface Dressing N Exc 15 Cm Deep And Getting Out Soft Loose Soil Complete - Surface Dressing N Exc 15 Cm Deep And Getting Out Soft/Loose Soil Complete , Excavation In Trenches Not Exc 1.5M Wide And Not Exc 1.5M Deep For Foundation Etc Or For Shafts N Exc 10 Sqm On Plan And N Exc 1.5M In Depth And Getting Out In Soft Or Loose Soil Complete , M And L For Kankar Or Laterite With Mix Of Fly Ash Clinker Stone Dust In The Proportion Of 1 3 6 Laying In Layers N Exc 100Mm Thick Watering Ramming And Compacted Complete - M And L For Kankar Or Laterite With Mix Of Fly Ash Clinker Stone Dust In The Proportion Of 1 3 6 Laying In Layers N Exc 100Mm Thick Watering Ramming And Compacted Complete , M And L For Broken Stone Or Boulders Hard Core Gauge N Exc 63Mm Deposited Spread And Levelled In Layers N Exc 15Cm Thick Watered And Rammed To A True Surfaces Complete All As Specified And Directed , M And L For Pcc 1 4 8 Type D 2 As In Bed Concrete For Foundation Filling And Mass Concrete Complete All As Specified And Directed - M And L For Pcc 1 4 8 Type D2 As In Bed Concrete For Foundation Filling And Mass Concrete Complete All As Specified And Directed , M And L For Reinforced Cement Concrete Design Mix M 25 Foundations Including Rafts Footings Foundation Beams Plinth Beams Bases For Columns , M And L For Reinforced Cement Concrete Design Mix M 25 20Mm Graded Stone Aggregate In Columns Pillars Piers Etc Complete All As Specified And Directed , M And L For Tmt Bars 10Mm Dia And Over Cut To Length Bent To Shape Required Not Less Than 0.9Mm Dia Or Securing With Clips Complets All As Specified And Directed - M And L For Tmt Bars 10Mm Dia And Over Cut To Length Bent To Shape Required Including Cranking Bending Spirally For Hooping For Columns Hooking Ends And Binding With The Including Mild Steel Wire Not Less Than 0.9Mm Dia Or Securing With Clips Complets All As Specified And Directed , Ditto But 5Mm Dia And Over Upto And Including 10Mm Dia In Stirrups Spacers And Binders Complete All As Specified And Directed , M And L For Formwork To Sides Of Concrete Foundations For Rough Finished Surfaces Of Concrete Complete All As Specified And Directed - M And L For Formwork To Sides Of Concrete Foundations Footings Bases Of Columns Raft And Raft Beams Sides And Soffit Of Foundation And Plinth Beams And Similar Work Vertical Or To Batter For Rough Finished Surfaces Of Concrete Complete All As Specified And Directed , M And L For Formwork For Rough Finished Surface Of Concrete Flat Surface To Sides Of Pillars Concrete Complete All As Specified And Directed - M And L For Formwork For Rough Finished Surface Of Concrete Flat Surface To Sides Of Pillars Posts Struts Piers Columns And Stanchions For Fair Finished Surfaces Of Concrete Complete All As Specified And Directed , M And L For Old Size Brickwork With Fly Ash Bricks Straight Or Curved On Plan To Any Radius Built In Cm 1 6 Complete All As Specified And Directed , Removing Surplus Soil To A Distance Not Exceeding 50 Mtr And Directed At A Level Not Exceeding 1.5 Mtr Above The Starting Point Complete All As Specified And Directed - Removing Surplus Soil To A Distance Not Exceeding 50 Mtr And Depositing Where Directed At A Level Not Exceeding 1.5 Mtr Above The Starting Point Complete All As Specified And Directed , Returning Filling In Including Spreading Levelling Watering And Well Ramming In Layers Not Exc 25 Cm In Soft Or Loose Complete All As Specified And Directed , S And F For Frp Display Panel Boards Size 14 7 Minimum 30Mm To 50Mm Thickness With Smooth White Weather Resistant With Anti Uv Coating Anchored On Frp Structure - S And F For Frp Display Panel Boards Size 14X7 Minimum 30Mm To 50Mm Thickness With Smooth White Weather Resistant With Anti Uv Coating Anchored On Frp Structure , S And F For Frp Designer 10 Ft Roman Pillar With Minimum Dia 40 To 60Cm Heavy Duty Anchor Bolts With Smooth White Weather Resistant With Anti Uv Coating - S And F For Frp Designer 10 Ft Roman Pillar With Minimum Dia 40 To 60Cm Thick Includes Drilled Top Sections Or Mounting Arms And Hot Dip Galvanized Ms Or Frp Coated Base Plates Secured With Heavy Duty Anchor Bolts With Smooth White Weather Resistant With Anti Uv Coating , S And F For Frp Upper Beam With Ms Or Iron Base Designed With Tile Matchign Alongwith Other Connected Items Complete - S And F For Frp Upper Beam With Ms Or Iron Base Designed With Tile Matchign Finsh Warm Light Water Supply Pipe Including Setting Testing And Installation Of Aligngment Of Existing Fountain Alongwith Other Connected Items Complete , S And F For Parking Stand Floor Mount Heavy Duty Mild Steel 20 Mm Dia Min Thickness 1.50 Mm With Powder Coated - S And F For Parking Stand Floor Mount Cycle Storage Rack Space Saving Staggered Or Modular Arrangement Heavy Duty Mild Steel 20 Mm Dia Min Thickness 1.50 Mm With Powder Coated Or Galvanized Finish To Resist Rust And Scratches To Mounted Via Drilled Concrete Anchor Bolts Or Directly In Ground Cycle Stand For Outdoor Use Capacity For Stores Upto 10 Cycle Each Stand
Basic Detail
Tender No GEM/2026/B/8271393
Bidding Type Tender
Location
City Bardhaman
State West Bengal
Key Dates
Publish Date 19 Nov 2026
Submission Date 30 Nov 2026
Open Date 01 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
80ac4484-15bd-4a5f-b38f-963925bf9edf.pdf
blank_pdf_2026-11-13-12-27-22_4b590a1af3e37749d438c1010887403a.pdf
10162729_Boq_1.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 19, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Dec 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

80ac4484-15bd-4a5f-b38f-963925bf9edf.pdf

pdf

blank_pdf_2026-11-13-12-27-22_4b590a1af3e37749d438c1010887403a.pdf

xlsx

10162729_Boq_1.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender