Power Boards / Undertakings / PSU Closing in 17 days TDR #58617981

Tender For Construction Of New Tower With Pile Foundation Against Erosion Of Tower Footing At Loc 15 & 16 Of 220Kv Sonapur Lilo D/C Transmission Line

Issued by Boards / Undertakings / PSU · Kamrup Metro, Assam
Tender Value
9.08 Crore
Estimated cost
Bid Submission
10 Dec 2026
17 days left
EMD
18.20 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kamrup Metro → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of New Tower With Pile Foundation Against Erosion Of Tower Footing At Loc 15 & 16 Of 220Kv Sonapur Lilo D/C Transmission Line

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 20-Nov-2026 Corrigendum-1 Technical Bid 10-Dec-2026

BOQ

Name of Work:- Construction of new tower with pile foundation against erosion of tower footing at Loc 15 & 16 of 220KV Sonapur LILO D/C Transmission Line
Sl. No. Item Description
1Galvanized Steel Superstructure including hangers,gussets,strain plates etc.
2(i) DC+9 = 11.5 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extention part)
3(i) DD+12 = 14.75 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extentionpart)
4Galvanized iron nuts & bolts, spring washers, step bolts etc.
5Power Conductor ACSR ZEBRA as per bid specification
6120 KN Disc Insulators
7Single Tension Hardware fittings for Zebra Conductor (Dead End)
8Mid Span Joint
9Vibration Damper
10Repair Sleeve
11Bird Guard
12Number plate
13Danger Plate
14Phase Plate
15Anti climbing Device
16Ground wire tension clamp
17Copper earth bond
18Tools for tower erection
19Hydraulic Cutter machine for Zebra & panther
20Galvanized Steel Superstructure including hangers,gussets,strain plates etc.
21(i) DC+9 = 11.5 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extention part)
22(i) DD+12 = 14.75 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extentionpart)
23Galvanized iron nuts & bolts, spring washers, step bolts etc.
24Power Conductor ACSR ZEBRA as per bid specification
25120 KN Disc Insulators
26Single Tension Hardware fittings for Zebra Conductor (Dead End)
27Mid Span Joint
28Vibration Damper
29Repair Sleeve
30Bird Guard
31Number plate
32Danger Plate
33Phase Plate
34Anti climbing Device
35Ground wire tension clamp
36Copper earth bond
37Tools for tower erection
38Hydraulic Cutter machine for Zebra & panther
39Detail & Check survey as per specification
40Construction of Pile Foundation
41Mobilization and demobilization of all machinearies, tools and tackles to the work site including preparation of working space, approach road, dewatering, arrangement of electricity, jungle clearing, earth filling etc. and making all arrangement for completion of the work and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing. for two towers at Loc. No. 15&16
42BORING:- Drilling 1200 mm dia vertical bore for RCC cast in-Situ pile by crawler mounted hydraulic rig machine, upto desired depth of 40 meters through all types of soil/clay/sand/soft rock liner driving upto stable strata, BMC as per design and drawing. Length of the pile for payment shall be measured from the bottom of pile cap after chipping off to remove laitance concrete. (TRUCK MOUNTED ROTARY/TMR/TUBE WELL BORING MACHINE SHALL NOT BE USED)2x4x3x40=960
43LINER:- 8 mm thick MS liner driving in 1200 mm dia having maximum 30 m length from EGL with suitable vibro hammer and crane including cost of liner plate, cutting, bending, welding, transportation etc. to complete the job in all respect.
44REINFORCEMENT:- preparing of steel cage as per drawing including cost of steel, transportation, straightening, cutting, bending, welding and inserting the cage in borehole to complete the job in all respect. (primary steel TATA/SAIL/Jindal steel/shyam steel/RINL of fe-550 D)
45CONCRETE FOR PILE:- Providing and pouring bored cast-in Situ RCC pile of grade M35 of 1200 mm dia by hopper and treamie pipe method including cost of concrete etc. to complete the job in all respect.
46CONCRETE FOR PILE CAP, TIE BEAM AND CHIMNEY:- Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam, including Steel form work, bracings all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete.
47INTEGRITY TEST:- Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge.
48Setting of stubs (Sets of four) by prop setting method including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling.
49Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site (DC+9 & DD+12). For two towers
50Stringing of power conductors including transportation from stores and distribution of conductors and accessories to site and laying, stringing, tensioning, clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned anywhere else per circuit KM (3 conductors) of line
51Grounding of towers with 3 metre long 25 mm dia G I pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt, cock etc as per Specification
52Painting of towers with bituminous paints of approved quality up to 3 metres from ground level including the cost of paints.
53Welding of all nuts & bolts up to the bottom cross arm level including all charges of transportation, materials etc.
54Erection of Danger plates. (1 no per tower)
55Erection of Phase plates.
56Erection of Number plates. (1 no per tower)
57Erection of anti-climbing device (1 set per tower)
58Opening and lowering of OPGW from the portion of the line to be dismantled and transportation to the store
59De-Stringing of ACSR Panther conductor of existing 220kV Transmission line, re-rolling of empty drums, Removal of hardware fittings,insulator and accessories, loading and unloading,transportation to AEGCL store
60Dismantling of tower without damaging the members and transportation to the store and proper stacking
61Site office set up (L/S)
62Supply and F&I
63OPGW 48 fiber Overhead cable as per bid specification
64Downlead Clamp
65OPGW optical Splice kit including junctionn box
66OPGW vibration Damper C/W preform armour rods
67Suspension assembly
68OPGW Tension single Dead end set for comunication /run in C/W preformed amount rods and towerbond clamps with and without splice location( Tension tower arrangement)
69OPGW Tension Double Dead end set with and without splice location( Tension tower Arrangement )
70Erection
71Backpulling of existing OPGW along with hardware fitting and vibration Damper (Live line)
7248F (DWSM) Fibre optic Installation along with hardware fitting and vibration Damper
73Splicing and Jointing work at Junction Box including Optical Splice Kit (48 Fibre)
74OPGW fibre Drum Testing
75Tools & tackles for stringing work Including Transportation & to & fro
76ERS (2 Nos. ERS will be required)
77Leveling and preparation of ERS installation site
78Sorting and loading of ERS, T&P material on transportation truck (in Kahilipara Store)
79Transportation of ERS, T&P materials on truck to site camp and unloading at nearest motorable spot near site camp(i.e. 7.7 MT per ERS for 60 Kms upto site)
80Carrying of ERS materials from unloading site to camp site
81Anchoring including excavation for 5 numbers of Anchors
82Erection of 1 ERS tower
83Dismantling of conductor(3 nos) form existing line of location
84Restringing of conductors (3 nos) in ERS tower including re-arrangement of all hardware fitting and accessories.
85Re-jumpering of conductors.
86Loading and Transportation of T&P materials on truck from site camp to Kahilipara after completion of ERS erection and unloading
87Additional Head loading of ERS materials as site from motoroable locations
88ERS DISMANTLING WORK (2 Nos. ERS will be required)
89Loading & Transportation of T&P materials on truck from Kahilipara Store to site and unloading
90Dismantling of Conductors (3 nos) from ERS tower
91Dismantling of ERS tower (1 nos) including de-Anchoring
92Carrying of ERS, T&P materials from actual site camp site to motorable place where transportation Truck is located
93Loading & Transportation of ERS, T&P materials on truck from site to Kahilipara Store and unloading(i.e. 7.7 MT per ERS for 60Kms upto site)
94Additional Head loading of ERS materials as site from motoroable locations Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58617981
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 9.08 Crore
LAST DATE 10-12-2026
Authority
Authority Name Assam Electricity Grid Corporation Limited
Work Description Tender for Construction Of New Tower With Pile Foundation Against Erosion Of Tower Footing At Loc 15 & 16 Of 220Kv Sonapur Lilo D/C Transmission Line
Basic Detail
Tender No AEGCL/MD/Tech-423/LAR/Sonapur LILO/Loc. No. 15-16/Bid
Bidding Type Tender
Location
City Kamrup Metro
State Assam
Key Dates
Publish Date 20 Nov 2026
Submission Date 10 Dec 2026
Open Date 01 Jan 0001
Finance
Tender Value 9.08 Crore
Tender Fee 1000
EMD 18.20 Lakhs
Exemption Available
Document List
Additional_Docs.rar
Bid_Vol1.pdf
BOQ_86249.xls
f930661d-6a57-41b9-a488-7dc39eb6d265.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 10, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 17 days
Dec 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days

Tender Documents

Download All (ZIP) ↓
rar

Additional_Docs.rar

pdf

Bid_Vol1.pdf

xls