Tender For Construction Of New Tower With Pile Foundation Against Erosion Of Tower Footing At Loc 15 & 16 Of 220Kv Sonapur Lilo D/C Transmission Line
Tender Overview
Project Description
Tender for Construction Of New Tower With Pile Foundation Against Erosion Of Tower Footing At Loc 15 & 16 Of 220Kv Sonapur Lilo D/C Transmission Line
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Nov-2026 | Corrigendum-1 | Technical Bid | 10-Dec-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Galvanized Steel Superstructure including hangers,gussets,strain plates etc. |
| 2 | (i) DC+9 = 11.5 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extention part) |
| 3 | (i) DD+12 = 14.75 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extentionpart) |
| 4 | Galvanized iron nuts & bolts, spring washers, step bolts etc. |
| 5 | Power Conductor ACSR ZEBRA as per bid specification |
| 6 | 120 KN Disc Insulators |
| 7 | Single Tension Hardware fittings for Zebra Conductor (Dead End) |
| 8 | Mid Span Joint |
| 9 | Vibration Damper |
| 10 | Repair Sleeve |
| 11 | Bird Guard |
| 12 | Number plate |
| 13 | Danger Plate |
| 14 | Phase Plate |
| 15 | Anti climbing Device |
| 16 | Ground wire tension clamp |
| 17 | Copper earth bond |
| 18 | Tools for tower erection |
| 19 | Hydraulic Cutter machine for Zebra & panther |
| 20 | Galvanized Steel Superstructure including hangers,gussets,strain plates etc. |
| 21 | (i) DC+9 = 11.5 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extention part) |
| 22 | (i) DD+12 = 14.75 MT (Galvanized stub angle With Cleat HT Steel =95% , MS =5%) (inculdind Stab, tower basic body and extentionpart) |
| 23 | Galvanized iron nuts & bolts, spring washers, step bolts etc. |
| 24 | Power Conductor ACSR ZEBRA as per bid specification |
| 25 | 120 KN Disc Insulators |
| 26 | Single Tension Hardware fittings for Zebra Conductor (Dead End) |
| 27 | Mid Span Joint |
| 28 | Vibration Damper |
| 29 | Repair Sleeve |
| 30 | Bird Guard |
| 31 | Number plate |
| 32 | Danger Plate |
| 33 | Phase Plate |
| 34 | Anti climbing Device |
| 35 | Ground wire tension clamp |
| 36 | Copper earth bond |
| 37 | Tools for tower erection |
| 38 | Hydraulic Cutter machine for Zebra & panther |
| 39 | Detail & Check survey as per specification |
| 40 | Construction of Pile Foundation |
| 41 | Mobilization and demobilization of all machinearies, tools and tackles to the work site including preparation of working space, approach road, dewatering, arrangement of electricity, jungle clearing, earth filling etc. and making all arrangement for completion of the work and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing. for two towers at Loc. No. 15&16 |
| 42 | BORING:- Drilling 1200 mm dia vertical bore for RCC cast in-Situ pile by crawler mounted hydraulic rig machine, upto desired depth of 40 meters through all types of soil/clay/sand/soft rock liner driving upto stable strata, BMC as per design and drawing. Length of the pile for payment shall be measured from the bottom of pile cap after chipping off to remove laitance concrete. (TRUCK MOUNTED ROTARY/TMR/TUBE WELL BORING MACHINE SHALL NOT BE USED)2x4x3x40=960 |
| 43 | LINER:- 8 mm thick MS liner driving in 1200 mm dia having maximum 30 m length from EGL with suitable vibro hammer and crane including cost of liner plate, cutting, bending, welding, transportation etc. to complete the job in all respect. |
| 44 | REINFORCEMENT:- preparing of steel cage as per drawing including cost of steel, transportation, straightening, cutting, bending, welding and inserting the cage in borehole to complete the job in all respect. (primary steel TATA/SAIL/Jindal steel/shyam steel/RINL of fe-550 D) |
| 45 | CONCRETE FOR PILE:- Providing and pouring bored cast-in Situ RCC pile of grade M35 of 1200 mm dia by hopper and treamie pipe method including cost of concrete etc. to complete the job in all respect. |
| 46 | CONCRETE FOR PILE CAP, TIE BEAM AND CHIMNEY:- Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam, including Steel form work, bracings all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete. |
| 47 | INTEGRITY TEST:- Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. |
| 48 | Setting of stubs (Sets of four) by prop setting method including transportation & distribution of stub and accessories from store to site excluding cost of excavation, concreting & back filling. |
| 49 | Superstructure erection including transportation of structures by any means and distribution of structure and accessories from store to site (DC+9 & DD+12). For two towers |
| 50 | Stringing of power conductors including transportation from stores and distribution of conductors and accessories to site and laying, stringing, tensioning, clamping, jointing, jumpering and hoisting of insulators complete including cost of all fittings and accessories not specifically mentioned anywhere else per circuit KM (3 conductors) of line |
| 51 | Grounding of towers with 3 metre long 25 mm dia G I pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt, cock etc as per Specification |
| 52 | Painting of towers with bituminous paints of approved quality up to 3 metres from ground level including the cost of paints. |
| 53 | Welding of all nuts & bolts up to the bottom cross arm level including all charges of transportation, materials etc. |
| 54 | Erection of Danger plates. (1 no per tower) |
| 55 | Erection of Phase plates. |
| 56 | Erection of Number plates. (1 no per tower) |
| 57 | Erection of anti-climbing device (1 set per tower) |
| 58 | Opening and lowering of OPGW from the portion of the line to be dismantled and transportation to the store |
| 59 | De-Stringing of ACSR Panther conductor of existing 220kV Transmission line, re-rolling of empty drums, Removal of hardware fittings,insulator and accessories, loading and unloading,transportation to AEGCL store |
| 60 | Dismantling of tower without damaging the members and transportation to the store and proper stacking |
| 61 | Site office set up (L/S) |
| 62 | Supply and F&I |
| 63 | OPGW 48 fiber Overhead cable as per bid specification |
| 64 | Downlead Clamp |
| 65 | OPGW optical Splice kit including junctionn box |
| 66 | OPGW vibration Damper C/W preform armour rods |
| 67 | Suspension assembly |
| 68 | OPGW Tension single Dead end set for comunication /run in C/W preformed amount rods and towerbond clamps with and without splice location( Tension tower arrangement) |
| 69 | OPGW Tension Double Dead end set with and without splice location( Tension tower Arrangement ) |
| 70 | Erection |
| 71 | Backpulling of existing OPGW along with hardware fitting and vibration Damper (Live line) |
| 72 | 48F (DWSM) Fibre optic Installation along with hardware fitting and vibration Damper |
| 73 | Splicing and Jointing work at Junction Box including Optical Splice Kit (48 Fibre) |
| 74 | OPGW fibre Drum Testing |
| 75 | Tools & tackles for stringing work Including Transportation & to & fro |
| 76 | ERS (2 Nos. ERS will be required) |
| 77 | Leveling and preparation of ERS installation site |
| 78 | Sorting and loading of ERS, T&P material on transportation truck (in Kahilipara Store) |
| 79 | Transportation of ERS, T&P materials on truck to site camp and unloading at nearest motorable spot near site camp(i.e. 7.7 MT per ERS for 60 Kms upto site) |
| 80 | Carrying of ERS materials from unloading site to camp site |
| 81 | Anchoring including excavation for 5 numbers of Anchors |
| 82 | Erection of 1 ERS tower |
| 83 | Dismantling of conductor(3 nos) form existing line of location |
| 84 | Restringing of conductors (3 nos) in ERS tower including re-arrangement of all hardware fitting and accessories. |
| 85 | Re-jumpering of conductors. |
| 86 | Loading and Transportation of T&P materials on truck from site camp to Kahilipara after completion of ERS erection and unloading |
| 87 | Additional Head loading of ERS materials as site from motoroable locations |
| 88 | ERS DISMANTLING WORK (2 Nos. ERS will be required) |
| 89 | Loading & Transportation of T&P materials on truck from Kahilipara Store to site and unloading |
| 90 | Dismantling of Conductors (3 nos) from ERS tower |
| 91 | Dismantling of ERS tower (1 nos) including de-Anchoring |
| 92 | Carrying of ERS, T&P materials from actual site camp site to motorable place where transportation Truck is located |
| 93 | Loading & Transportation of ERS, T&P materials on truck from site to Kahilipara Store and unloading(i.e. 7.7 MT per ERS for 60Kms upto site) |
| 94 | Additional Head loading of ERS materials as site from motoroable locations Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 17 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender