Tender For Construction Of Fabrication Shed For Datta Mandir Pad In Ward No. 05 At Malpe In V.P. Virnoda, Pernem - Goa. Under Mla-Lad Scheme.
Tender Value
27.83 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
2 days left
EMD
55661
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
goa → Goa
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Fabrication Shed For Datta Mandir Pad In Ward No. 05 At Malpe In V.P. Virnoda, Pernem - Goa. Under Mla-Lad Scheme.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading danger lighting guarding as directed in :;All kinds of soil;All types of Ordinary rock including all types of laterite rock blasting prohibited |
| 3 | Extra for additional depth of 1.5 m or part thereof in:;All types of laterite rocks and hard rocks |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 5 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering shuttering finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size);All works upto plinth level |
| 6 | Add for providing richer or leaner mixes respectively at all floor levels;Providing M-30 grade concrete by using 420kgs of cement per cu.m. of concrete instead of M-25 grade of B.M.C. |
| 7 | Providing Mild steel reinforcement bars of (SAIL TATA. VIZAG JSW Steel Ltd.) )(Confirming to IS 1786 of 1986) for RCC work including bending binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. |
| 8 | Centering & shuttering including Strutting Propping & removal of forms for :;Foundations Footings Bases for columns |
| 9 | Centering & shuttering including Strutting Propping & removal of forms for :;Columns Piers Pillars Aburments Posts and struts (square rectangle polygon in plan) |
| 10 | Refilling the pipeline/foundation trenches plinth sides foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. |
| 11 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering shuttering and finishing in:;All works upto plinth level |
| 12 | Kotah stone slab flooring over 20 mm (average) thick base laid over & jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing & complete with base of cement mortar 1:4 (1 cement : 4 coarse sand);20 mm thick. |
| 13 | Kotah stone slab flooring over 25 mm thick in risers of steps skirtings dado & pillars laid on 12mm (average) thick cement mortor 1:3 (1 cement : 3 coarse sand) & jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing & polishing complete. |
| 14 | Floor polishing on masonry or concrete floors with superior quality wax polish of approved brand and manufacture. |
| 15 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. |
| 16 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level |
| 17 | Centering & shuttering including Strutting Propping & removal of forms for :;Vertical surfaces such as retaing walls return walls Partitions walls (any thickness) including attached Pilasters Buttresses Plinth and string courses Fillets and the like |
| 18 | 12mm cement plaster 1:3 (1 cement : 3 fine sand) |
| 19 | Providing and fixing Granite stone slabs (flamed finish) 18mm thick in risers of steps skirting dado and pillars laid on cement paste and jointed with grey cement slurry mixed with pigment to match the shade of the slabs including rubbing and polishing complete;Jet black |
| 20 | Rounding of edges of marble slab to semi circular slope |
| 21 | Painting three or more coats with acryllic exterior paint of approved brand and manufacture (Such as Dulex/ Asian Paints/ Sherwin Willians) including applying one coat of cement primer and one coat of surface treatment etc. complete. |
| 22 | Steel work in built up tubular (round square or rectangular hollow tubes etc.) (Square Hollow Section (SHS) IS4923 /Rectangular Hollow Section (RHS) IS4923/ Circular Hollow Section (CHS) IS1161 closed Structural Steel of (SAIL TATA. VIZAG JSW APOLLO Steel Ltd.) make (Min Yeild Stress 310 Mpa)) trusses etc. including cutting hoisting fixing in position and applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc. complete. |
| 23 | Providing & fixing colour coated Alluminium (PUF) sandwich panel roofing systems of approved make adhering to Aluminium 3105 grade for top & bottom sheet of thickness 0.40 & 0.35 respectively including PUF insulation betewwn the top & bottom sheet of Denslity 40 (+/-2) Kg/m3 inclusive of S.S.304 grade self tapping fastneres complete as directed by Enigneer incharge (frame work for roof roof accesorries to be paid seperately) for tile Design PUF roof panel Gutter width should be atleast 25% more than the Crest width. Minimum height at heighest point of Crest should be minimum 65mm. Minimum thickness at anygiven point should not be below 30mm.;PUF Insulated tile roof 30mm thick of trapezoidal design |
| 24 | Providing & Fixing Alluminium Ridge of approved make adhering to Alluminium 3105 grade of 0.71mm thickness & 60 cm wide inclusive of SS304 grade self tapping fastners to match the Alluminium roofing system & as directed by Engineer in charge complete |
| 25 | Providing & Fixing Alluminium 50mm Trapezhoidal End Cap for PUF Roofing of approved make of Alluminium AA 3105 grade matching with 50mm PUF panel profile including the required fastners etc. Complete for Alluminium PUF Roofing System & as directed by Engineer in charge. |
| 26 | Painting two or more coats (excluding priming coat) with superior quality ready mixed paint for steel work of approved brand & manufacture in all shades on new work to give an even shade. |
| 27 | Providing and fixing Prince or equivalent make PVC SWR half round eaves gutter with bolts, nuts and flat iron brackets 40 x 3 mm size complete.c) 250 mm nominal size |
| 28 | Extra for providing and fixing prince or equivalent make PVC SWR support bracket for socketed half round eaves gutters.;140 mm nominal size |
| 29 | Providing and fixing rigid PVC S.W.R. (soil waste & rain water drainage pipes of approved including lubricant etc. complete (single/double) socketed:;110 mm dia |
| 30 | Providing and fixing rigid PVC bend of required degree (of approved make) for S.W.R. drainage pipes of approved including lubricating.;110 mm dia |
| 31 | Transportation and carriages of material by tipper truck including loading, unloading and stacking (A) Lime, building rubbish, manure sludge, moorum excavated rock.VII) 15kms |
| 32 | Steel work welded (SAIL TATA. VIZAG & using electrodes of Ador or ES4B or Deh Secheron make only)in built up sections trusses and framed work including cutting hoisting fixing in position and applying priming coat of red lead paint.;In tees angles flats and channels |
| 33 | Providing & fixing M.S. round holding down with nuts & Washer plates complete. |
| 34 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from the transit mixer to the site of laying excluding the cost of centering shuttering finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level;M-30grade of concrete Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysNov 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents