Tender For Selection Of Consortium Partner For Supply, Installation, Testing And Commissioning Supply, Installation, Testing and Commissioning And Migration Of It Infrastructure At Data Centre Dc, Disaster Recovery Site Drs And Near Data Centre Nd
Tender Overview
Project Description
Tender for Selection Of Consortium Partner For Supply, Installation, Testing And Commissioning Supply, Installation, Testing and Commissioning And Migration Of It Infrastructure At Data Centre Dc, Disaster Recovery Site Drs And Near Data Centre Ndc For Punjab National Bank
BOQ
| Sl. No. | Item Description |
| 1 | Annexure-A Summary Sheet for SOR items S.No Description Total Basic Amount Total Taxes Amount Total Amount (Inclusive of Taxes) |
| 2 | Total Value of A (Supply- Hardware) |
| 3 | Total Value of B (Supply- Software) |
| 4 | Total Value of C (Implementation and commissioning) |
| 5 | Total Value of D (Minimum Manpower during the implementation Period) |
| 6 | Lift and Shift (LS) Charges for DC |
| 7 | Lift and Shift (LS)Charges for DR |
| 8 | O&M Manpower for 5 years in DC |
| 9 | O&M Manpower for 5 years in DR |
| 10 | AMC charges for 4th Year |
| 11 | AMC charges for 5th Year Total Bid Value Excluding all Taxes (In Figure) 0.0 Total Bid Value Excluding all Taxes (In words) Total Bid Value Including all Taxes (In Figure) 0.0 Total Bid Value Including all Taxes (In words) Annexure-A1 Supply, Implementation and Commissioning S.No Infrastructure/Solution Details UoM A-Hardware/B-Software DC DR NDC Total Qty For Supply For Implementation and commissioning cost (C) Qty Qty Qty Qty Unit Rate (Excld. Tax) Amount (Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) |
| 12 | Security Solution a) Anti DDoS Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 b) Perimeter NIPS Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 c) External Firewall with Anti-APT Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 d) Core Firewall Domestic Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 e) Core Firewall RRB & ILL (Swift & Overseas) Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 f) Applicaton Delivery Controller Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 g) SSLO Orchestrator Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 h) Advanced web application firewall Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 i) Network Detection and Response Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 |
| 13 | Router a) Type 1 Nos. A 13.0 13.0 0.0 26.0 0.0 0.0 b) Type2 Nos. A 12.0 12.0 0.0 24.0 0.0 0.0 c) Type 3 Nos. A 19.0 19.0 0.0 38.0 0.0 0.0 d) Type 4 Nos. A 12.0 12.0 0.0 24.0 0.0 0.0 e) Type 5 Nos. A 7.0 7.0 0.0 14.0 0.0 0.0 |
| 14 | NTP Solution |
| 15 | Server Load Balancer a) Server Load Balancer Type 1 Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 b) Server Load Balancer Type 2 Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 |
| 16 | Switches with SDN Solution a) Spine Switch Type-1 Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 b) Spine Switch Type-2 Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 c) Compute Copper Leaf Nos. A 50.0 34.0 0.0 84.0 0.0 0.0 d) Management Switch Nos. A 66.0 50.0 0.0 116.0 0.0 0.0 e) Out-of-Band (OOB) Core switches Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 f) Fiber Leaf Switch Nos. A 92.0 74.0 0.0 166.0 0.0 0.0 g) Border Leaf Switch Nos. A 6.0 6.0 0.0 12.0 0.0 0.0 h) Interconnect Switch Nos. A 4.0 4.0 0.0 8.0 0.0 0.0 i) SDN Controller Lot A 1.0 1.0 0.0 2.0 0.0 0.0 |
| 17 | Backup Solution a) Backup Server Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 b) Media Server Nos. A 6.0 6.0 0.0 12.0 0.0 0.0 c) Data Vault Server Nos. A 2.0 2.0 0.0 4.0 0.0 0.0 d) Backup Software- 5 PB Set. B 1.0 0.0 0.0 1.0 0.0 0.0 e) Disk Based Backup storage usable 5 PB Set. A 1.0 1.0 0.0 2.0 0.0 0.0 f) LTR storage usable 60 PB Set. A 1.0 1.0 0.0 2.0 0.0 0.0 g) Data Vault storage usable 7.5 PB Set. A 1.0 0.0 0.0 1.0 0.0 0.0 h) Tape Library- Modular Tape Library with minimum 25 LTO10 Tape Drive with 500 Slot Tapes Set A 1.0 1.0 0.0 2.0 0.0 0.0 Total Amount of A (Supply- Hardware) (Exclusive of Taxes) 0.0 Total Amount of B (Supply- Software) (Exclusive of Taxes) 0.0 Total Amount of C (Implementation and commissioning) (Exclusive of Taxes) 0.0 Total Tax Amount of A (Supply- Hardware) Total Tax Amount of B (Supply- Software) Total Tax Amount of C (Implementation and commissioning) Total Amount of A including Taxes (Supply- Hardware) Total Amount of B including Taxes (Supply- Software) Total Amount of C including Taxes (Implementation and commissioning) Annexure A2 Minimum Manpower During Implementaion SN Min Manpower during the implementation period (Named resources) Unit Category (D- Minium Man Power during Implementation) DC DR Total Quantity Unit Rate (Excluding Tax) Amount (Excluding Tax) |
| 18 | Program Manager |
| 19 | Project Manager |
| 20 | Project Coordinator Total Amount of D (Minimum Manpower during the implementation period) (Exclusive of Taxes) Total Tax Amount of D (Minimum Manpower during the implementation period) Total Amount including Tax (Minimum Manpower during the implementation period) Final SNOC Resource plan Annexure A3-A O&M (Warranty and AMC) Manpower at DC S no. Profile Min Manpower in DC Year 1 Year 2 Year 3 Year 4 Year 5 Unit Rate(Excluding Tax) Amount (Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) |
| 21 | Program Manager |
| 22 | Project Manager |
| 23 | Project Coordinator |
| 24 | Resources for SDN solution |
| 25 | min 1 L1 resources for 24x7 |
| 26 | Min 1 L2 resource for 24x7 |
| 27 | Min 1 L3 resource |
| 28 | Resources for Backup solution |
| 29 | Min 1 L2 resource for 24x7 |
| 30 | Resources for Application Dependency Mapping |
| 31 | Min 1 L2 resource for 24x7 Year 1= 0.0 Year 2= 0.0 Year 3= 0.0 Year 4= 0.0 Year 5= 0.0 Total Manpower Cost at DC For 5 Years (Exclusive of Taxes) 0.0 Total Tax Amount Total Amount Including Taxes Final SNOC Resource plan Annexure A3- B O&M (Warranty and AMC) Man Power at DR (A3-B) S no. Profile Min Manpower in DR Year 1 Year 2 Year 3 Year 4 Year 5 Unit Rate (Excluding Tax) Amount (Excluding Tax) Unit Rate (Excluding Tax) Amount(Excluding Tax) Unit Rate (Excluding Tax) Amount(Excluding Tax) Unit Rate(Excluding Tax) Amount (Excluding Tax) Unit Rate (Excluding Tax) Amount (Excluding Tax) |
| 32 | Program Manager |
| 33 | Project Manager |
| 34 | Project Coordinator |
| 35 | Resources for SDN solution |
| 36 | min 1 L1 resources for 24x7 |
| 37 | Min 1 L2 resource for 24x7 |
| 38 | Min 1 L3 resource |
| 39 | Resources for Backup solution |
| 40 | Min 1 L2 resource for 24x7 |
| 41 | Resources for Application Dependency Mapping |
| 42 | Min 1 L2 resource for 24x7 Total Amount Year 1= 0.0 Year 2= 0.0 Year 3= 0.0 Year 4= 0.0 Year 5= 0.0 Total Manpower Cost at DR For 5 Years (Exclusive of Taxes) 0.0 Total Tax Amount Total Amount Including Taxes |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender