Tender For Repair & Maintenance Of Ht External Electric Supply Distribution System Including Filtration /Repair Of Transformer Vcb/Rmu And Replacement Of Ht Ug Cable At Aundh Miliitary Complex Under Ge (Mh & Rh) Khadki.
Tender Value
24.74 Lakhs
Estimated cost
Bid Submission
14 Dec 2026
22 days left
EMD
49400
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pune → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair & Maintenance Of Ht External Electric Supply Distribution System Including Filtration /Repair Of Transformer Vcb/Rmu And Replacement Of Ht Ug Cable At Aundh Miliitary Complex Under Ge (Mh & Rh) Khadki.
BOQ
| Sl. No. | Item Description |
| 1 | Disconnecting the HV(22KV) & LV(0.415kV) side electrical connections including neutral earth strip of existing step down transformer, drain out the complete oil of transformer and store carefully in clean container. Cleaning of all HV/LV windings terminals, cleaning of conservator tank, cooling fins/tubes, tank, etc. Thuroughly inspecting of core and winding complete, reinsert the core coil assembly into the transformer tank, replacing 5/3 mm thick rubberised corksheet gasket of top cover complete and refilled with filtered transformer oil upto the desired level marked in conservator tank and record the insulation resistance of the winding both HV/LV side between earth and HV/LV winding, reconnecting the HV/LV side electric cables complete of following capacity of stepdown transformer complete all as specified and directed by the Engineer- in -Charge .Note - Transformer oil filtration and top up shall be measured and paid seperately under the relevant item of schedule |
| 2 | All as per Item No. 01 above but Transformer capacity 100KVA to 250 KVA |
| 3 | All as per Item No. 01 above but Transformer capacity 300KVA to 500 KVA |
| 4 | M&L for dehydration of transformer oil with mobile stream line transformer oil filteration plant at site with all accessories connected to transformer and carrying out filterartion of oil to desired dielectric strenght to achieve electric strength of 60 KV for 1 minute at 2.5 mm gap as per relevant IS for transformer installed at various locations out door/in door type,complete all as specified and directed by the Engineer- in -Charge .Note : (i)Test certificate shall be submitted for before and after filteration for dielectric strenght on the proper format. (ii) Transformer oil used for top up will be measured and paid seprately under relevant item. |
| 5 | Supply and topping up new transformer oil confirming to IS -335 of 1993 into the conservator tank/body tank of the transformer at various location complete all as directed by the Engineer-in-charge. (Make : Power Oil or its equivalent) Note : The transformer oil for topping up shall be with di-electric strength of 40KV |
| 6 | Disconnecting all in coming and outdoor cables removing the transformer from the platform/two pole structure and floor and loading it in the vechicle carefully using the crane and transporting it to the workshop for repairs and transformer transport back to site , reinstall it, reconnecting all incoming and outgoing cable by properly crimping using lugs of suitable size taping the bushes/busbar, using insulation tape and testing of capacity 200 KVA to 500 KVA complete all as specified and directed by the Engineer- in -Charge .Note :LT/HT side ceramic busing, brass spindle for HT/LT side , Rewinding , Dehydration of oil shall be measured and paid seprately in respective Items |
| 7 | M&L for rewinding of HT /LT windings of transformer , winding the defective coils with approved quality copper wire as per IS of same gauge and existing size together with new insulation materials, bracings the terminals before placing into the tranformer and assembling the HT / LT coil with new insulation between core and LT coil all as required and fitting the coils in the chamber, testing and commisioning the transformer after providing necessary connections complete all as specified and directed by the Engineer- in -Charge . Please Enable Macros to View BoQ information |
| 8 | M&L for rewinding of HT /LT windings of transformer , winding the defective coils with approved quality copper wire as per IS of same gauge and existing size together with new insulation materials, bracings the terminals before placing into the tranformer and assembling the HT / LT coil with new insulation between core and LT coil all as required and fitting the coils in the chamber, testing and commisioning the transformer after providing necessary connections complete all as specified and directed by the Engineer- in -Charge . Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysDec 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.