Tender For Conservation And Repairs To Madha Fort Ta. Madha, Dist. Solapur Phase 2
Tender Value
3.63 Crore
Estimated cost
Bid Submission
26 Nov 2026
5 days left
EMD
1.81 Lakhs
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Solapur → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Conservation And Repairs To Madha Fort Ta. Madha, Dist. Solapur Phase 2
BOQ
| Sl. No. | Item Description |
| 1 | Dewatering on BHP basis by using water pump including diversion of stream, roviding cofferdams, earthern bunds etc. as may be necessary for foundation and ther parts of the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) |
| 2 | Cutting down trees including trunks and branches with griths above 30 cm to 60 cm and stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any. |
| 3 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. |
| 4 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads,lifts etc. |
| 5 | Dismantling brick masonry in lime or cement mortar including stacking the materials as directed with all leads,lifts etc. |
| 6 | Removing pointing and other epoxy-based hard material from joints and surface area of Basalt stone masonary manually with chisel and hammer or with the help of electric grinders wherever directed by Engineer In charge. Proper care should be taken not to damage the stone during removal. |
| 7 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. |
| 8 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm da V placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with MS Tubes MS condition for execution of work of cleaning and/or pointing and/ or applying chemical and removing it the challis, M.S. clamps and staircase system in the scaffolding for working platform etc, and maintaining feasible, for inspection of work at required locations with essential safety features for the workmen etc. compte a scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever it directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be meet t payment purpose. (2) The payment will be made once only for execution of all items for such works |
| 9 | Specialised Stone cleaning to remove oil or emulsion paint,stains or dark patches,layers of impervious coatings,cementious layers,rust stains from surface of stone with chemicals ,thinners,solvents or soft teepol type soap solution or by pressure jet machine (As specified by consulting architect),A gentle use of air abrasive tools may be permitted as long as no damage to the original surface is ensured.it may include usage of mechanical tapping ,chemical surfactant or solvant,patent cleaning product or use of pressurised micro abrasive as necessary.test patches would need to be undertaken to asses efficeincy of technique prior to work.Removal to be followed by water washing.The surface shall finally be cleaned by hand rubbing and rinsing with clean water to obtain nearly original surface,colour and texture |
| 10 | Gently cleaning the surface of stone masonary with specialised water misting technique employing air water jet using a fine nossle sprinkling system calibrated to sprey fine mist along the stone surface without over wetting followed up by gentle brushing with soft nylon brushes and removing dirt,dist,bird dropping , grease , oil, algae, fungus,monkey beats,vegetable growth,etc as specified.gentle surface cleaning using water misting and mild pH balanced surfactants as specified for indicated areas to remove the surface dirt,grit accretion by means of water misting and cleaning etc.complete as directed by engineer in charge |
| 11 | Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc.complete |
| 12 | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. |
| 13 | Excavation for DEBRIS REMOVAL/ARCHEOLOGICAL SCIENTIFIC CLEARANCE in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 14 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 15 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,including removing the excavated material upto a distance of 50 metres beyond thebuilding area and stacking and spreading as directed, dewatering, preparing the bedfor the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means |
| 16 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 17 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. |
| 18 | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.. |
| 19 | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in superstructure For Filling as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 20 | Filling in plinth and floors with Excavated material/brought from outside and approved by Engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete. |
| 21 | Providing/Re-setting Ashlar Rough tooled Masonry of reuse-stones in lime mortar 1:1 in superstructure as per detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 22 | Providing Ashlar Rough Tooled Masonry of trap / granite stones in lime mortar 1:1 with size of stone 0.60 m. x 0.45 m. x 0.23 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 23 | Providing/Re-setting Ashlar Arching of reuse-stones in lime mortar 1:1, as per detailed specifications and drawings or as directed including the arch stones be set in fine mortar, the intrados, joints and beds to left full, the cast or keying course to be accurately fitted, in arches up to 60 cm.(2ꞌ) in depth all stones shall be of the full thickness of the ring, arches to be built on proper centring, the bed joints shall be radial and the side joints shall be at right angles to the bed joints and the thickness of the joints shall not exceed 5 mm. (3/16″), preparing the lime mortar in lime miller,cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 24 | Providing Ashlar Arching of trap / granite stones in lime mortar 1:1, with size of stone 60 cm. x 45 cm. x 30 cm. as per detailed specifications and drawings or as directed including the arch stones be of approved quality, colour, hard and free from defect of any kind, the arch stones in all cases of the entire thickness, the arch stones shall be dressed full and true to their proper shapes with the necessary summering, twist or winding and be set in fine mortar, the intrados, joints and beds to fair tooled and left full, the cast or keying course to be accurately fitted, at all horizontal joints the intrados to have a 2 cm. (¾″) chamfer, the face stone may be tooled or rock-faced with or without chamfer as directed, in arches up to 60 cm. (2ꞌ) in depth all stones shall be of the full thickness of the ring, arches to be built on proper centring, the bed joints shall be radial and the side joints shall be at right angles to the bed joints and the thickness of the joints shall not exceed 5 mm. (3/16″) preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 25 | Providing Coursed Rubble Masonry Second Sort of trap / granite stones in lime mortar 1:1½, size of stone 45 cm. x 30 cm. x 23 cm. in superstructure as per detailed specifications and drawings or as directed including the stones shall be laid in horizontal course, the face of the stones to be hammered and bushing not to be project more than 3.8 cm. (1½″), all stones to be set full in mortar, all side joints shall be vertical and beds horizontal and not joints shall be more than 12.5 mm. (½″), the through stones shall be inserted 5 and 6 feet apart in every course, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 26 | Providing Brick Masonry First Class in superstructure of first quality bricks of special size 9″ x 4½″ x 2½″ in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, moulded on tables, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks are to be laid flush in mortar in such bond as directed, as far as possible, bricks of uniform colour are to be selected for the face work when it is not to be plastered, the joints are not to exceed 9.5 mm. (⅜″), no bats or half brick to be used in the work, racking out joints where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 27 | Providing Rectangular Coping Cut-stone Second Sort, 20 cm. height and 52.5 cm. wide of trap /granite stones in lime mortar 1:1½, size of stone is 90 cm. x 60 cm. x 21 cm. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stone shall be dressed full or to template, exposed face of the stones shall be rough-tooled and all joints shall be in line and close and not more than 3 mm. thick, preparing the lime mortar in lime miller, scaffolding, watering and all coping work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 28 | Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size of stone 60 cm. x 45 cm. x 15 cm., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 29 | Providing Brick Flooring Laid Flat in lime mortar 1:1½, with size of bricks 9″ x 4½″ x 2½″, as per detailed specifications and drawings or as directed the bricks shall be selected well-burnt bricks of good colour and shape with rubbed joints, the bricks shall be thoroughly wetted and set flat in mortar on concrete bed, the paving joints shall not be more than 10 mm. (⅜″) in thickness, the whole surface should be kept wetted for three weeks, preparing the lime mortar in lime miller, watering and all flooring work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 30 | Providing/Re-setting Ashlar Rough-tooled Stone Steps of reuse-stones in lime mortar 1:1½ as per detailed specifications and drawings or as directed including each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 31 | Providing Ashlar Rough-tooled Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone 60cm. x 40 cm. x 22 cm. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 32 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for coping or slab as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer, the concrete must be bitten for two days with pouring water, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete. |
| 33 | Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 34 | Providing Lime Pointing to brick work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 35 | Providing 12 mm. thick Rough Cast Lime Plaster and 10 mm thick in double coat in lime mortar 1:1,1:1 1/2 in , as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 36 | Providing Fine Coat Of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete. |
| 37 | Providing and fixing First Quality Indian T.W beams and truss parts of size 0.150 m x 0.150 m x 3.90 m for roofing/ floor including scaffolding if necessary etc. complete.It is mandatory to use first quality well seasoned Indian Teak Wood from Forest Department's FDCML |
| 38 | Providing and fixing Indian teakwood plank ceiling 20mm thick plain under side tongued and grooved including iron screws, scaffolding, if necessary, including one primer coat on under side and one coat of coal tar on upper side etc. complete.It is mandatory to use first quality well seasoned Indian Teak Wood from Forest Department's FDCML Including Carving Work as per Detailed Drawing or As Directed |
| 39 | Providing and fixing colour coated Zincalume ( R ) AZ150 ( min 150 gms/sq.mt. total on each side )profiled sheets for roofing. The feed material is manufactured out of nominal 0.45 mm Base Metal Thickness (BMT ) (0.5 mm TCT ), Hi-strength steel with min.550 MPa yield strength, metallic hot dip coated with Aluminium-Zinc alloy (55% aluminium 43.4% zinc 1.6% silicon) with COLORBOND ( R ) steel quality super durable polyester paint coat ( with inorganic pigment). The paint shall have a total coating thickness of nominal 35 um, comprising of nominal 25 um exterior coat on top surface and nominal 10 um reverse coat on back surface. Profile sheet shall have nom. 950-1050 mm effective cover width and nominal 25-30 mm deep ribs with subtle square fluting in the five pan at nominal 180-250 mm center- to-center. The end rib shall be designed for anti-capillary groove. and return leg. The feed material should have coil manufacturers product details marked a regular interval. Including fasteners with min. fastened with min. 25 um Zinc-Tin alloy coated, Hex head, self-drilling screw etc. complete. (weight of profile 4.52 Kilogram/Square Metre) |
| 40 | Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete. |
| 41 | Providing and fixing in position Guard Railling as per Drg. No. 15 Type C dt.20-4-79, with 3rows of 50 mm dia. G.I. pipe 30cm a part and fixed in M.S. channels of section 125 x 65 x 6 mm spaced 2.5 C/c 1:2:4 bedding of size 45 x 30. as per detailed drawing with 3 coats of approved paint including including necessary excavation in any strata. |
| 42 | Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete. for soil stabilization |
| 43 | Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete.T.W.From F.D.C.M.L |
| 44 | Providing and fixing Country cut teak wood double or single leaf panelled shutters, 35 mm thick style top and freze rail 95 x 35 thick with lock and bottam rail 195 x 25 mm thick and panels without ventilator as per detailed drawing excluding the door frame, stainless steel fixtures and fastening and finishing the wood work with oil painting 3 coats complete.T.W.From F.D.C.M.L |
| 45 | Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping,\ applying French polish , scaffolding if required etc.complete. Note:The work to be executed on prior approval of Superintending Engineer will be necessary. |
| 46 | Disposing of dismantling materials of R.C.C./ stone / brick masonry / derbies, excavated material / soil / murum / rubbish material or vegetation / grass / shrubs etc., from work site beyond the 5km. |
| 47 | Public Seating Chair. - 3 Seater Providing and Fixing 3 seater Public seating chair made of complete metal with Legs in Crome finish and seates in silver powder coating finish. |
| 48 | Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. Plain Terrain New Alignment Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender