Tender For Tender For (I) Providing 1Phase Lt Line To Loh/Newly Constructed Houses In (E) Section Nainkhad Under Esd Bakloh.( Ts. No. 34/2026-27) (Ii) Providing 1Phase Lt Line To Loh/Newly Constructed Hosues In Electrical Section Bakloh Under Esd Bak
Tender Overview
Project Description
Tender for Tender For (I) Providing 1Phase Lt Line To Loh/Newly Constructed Houses In (E) Section Nainkhad Under Esd Bakloh.( Ts. No. 34/2026-27) (Ii) Providing 1Phase Lt Line To Loh/Newly Constructed Hosues In Electrical Section Bakloh Under Esd Bakloh.( Ts.No. 36/2026-27) ( Vii) Providing 1Phase Lt Line To Loh/Newly Constructed Houses Under 100Kva Devigown In ( We) Section Kakira Under Esd Bakloh. ( Ts.No. 37/2026-27)Bid No. Ed-Dal-E- 21/2026-27
BOQ
| Sl. No. | Item Description |
| 1 | (Supply Part Ts.No. 34/2026-27) (WBS No. 32100523-001-DAL-LT-019) |
| 2 | LT Stay set |
| 3 | Stay wire |
| 4 | Angle Iron [ 75x75x6] [Length 1.50 Mtr + 0.02 mtr] |
| 5 | Shackle Insulator |
| 6 | D-Iron |
| 7 | Earth Knob |
| 8 | Nuts and Bolts off Sizes |
| 9 | Aluminuim Paint |
| 10 | Earthing set complete |
| 11 | GI Wire 8 SWG |
| 12 | Full Clamp |
| 13 | Erection Part ( Ts.No. 34/2026-27) |
| 14 | Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 15 | Erection for Laying of Conductor (AAAC (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 16 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 17 | Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 18 | Filling RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 19 | Erection of Earthing Set a)Digging of Pit b) Fixing of GI wire to the earthing system © Fiiling of Pit complete in all respect. |
| 20 | Manual Carriage of ST Poles 8mtr Long & Allied materail for an average Lead of 1 Km @ Rs. 500/-km/Pole |
| 21 | Supply Part ( Ts.No. 36/2026-27) WBS 32100523-001-DAL-LT-021 |
| 22 | LT Stay set |
| 23 | Stay wire |
| 24 | Earth Knob |
| 25 | Shackle Insulator |
| 26 | D-Iron |
| 27 | Earthing set complete |
| 28 | Nuts and Bolts off Sizes |
| 29 | Aluminuim Paint |
| 30 | GI Wire 8 SWG |
| 31 | Full Clamp |
| 32 | Channel Iron [ 75x40x4.8] [ length +1.50 mtr +0.2 Mtr] |
| 33 | Erection Part ( Ts.No. 36/2026-27) |
| 34 | Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 35 | Erection for Laying of Conductor (AAAC (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 36 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 37 | Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 38 | Filling RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 39 | Erection of Earthing Set a)Digging of Pit b) Fixing of GI wire to the earthing system © Fiiling of Pit complete in all respect. |
| 40 | Manual Carriage of ST Poles 8mtr Long & Allied materail for an average Lead of 1 Km @ Rs. 500/-km/Pole |
| 41 | Supply Part ( Ts.No. 37/2026-27) WBS 32100523-001-DAL-LT-022 |
| 42 | LT Stay set |
| 43 | Stay wire |
| 44 | Earth Knob |
| 45 | Shackle Insulator |
| 46 | D-Iron |
| 47 | Earthing set complete |
| 48 | Nuts and Bolts off Sizes |
| 49 | Aluminuim Paint |
| 50 | GI Wire 8 SWG |
| 51 | Full Clamp |
| 52 | Barbed Wire |
| 53 | Erection Part ( Ts.No. 37/2026-27) |
| 54 | Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect. |
| 55 | Erection for Laying of Conductor (AAAC (50mm²)), Stringing and Sagging including binding with insulator complete in all respect. |
| 56 | Erection of Laying and Sagging of GI Wire Guarding complete in all respect. |
| 57 | Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect. |
| 58 | Filling RCC Muffs for Steel tubler Pole. 1800mm with concerete filling. |
| 59 | Erection of Earthing Set a)Digging of Pit b) Fixing of GI wire to the earthing system © Fiiling of Pit complete in all respect. |
| 60 | Manual Carriage of ST Poles 8mtr Long & Allied materail for an average Lead of 2 Km @ Rs. 500/-km/Pole Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender