Tender For Replacement Of Dg Set For Operational Area At Old Power House Of M.B.B Airport Agartala.
Tender Value
1.93 Crore
Estimated cost
Bid Submission
11 Dec 2026
19 days left
EMD
3.86 Lakhs
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
tripura → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Replacement Of Dg Set For Operational Area At Old Power House Of M.B.B Airport Agartala.
BOQ
| Sl. No. | Item Description |
| 1 | SH: ASupply, Installation, Testing & Commissioning (SITC) of ‘Silent Type Diesel Generating set as per CPCB IV + or better norms having Prime Power Rating of 500 kVA, 415 volts at 1500 RPM, 0.8 lagging power factor at 415 V suitable for 50 Hz, 3 phase system & for 0.85 Load Factor, including testing at factory and site with fuel, load for test and other necessary arrangements and comprising of daily service tank with rotary type fuel transfer pump, starting system, exhaust system, acoustic enclosure, AMF panel, necessary supply & laying of cables between AMF panel and LT panels etc. complete as required as per technical specifications and instructions of Engineer-in-Charge. |
| 2 | Supply, Installation, Testing & Commissioning (SITC) of Mobile (trailer mounted) Power Diesel Generator as per CPCB IV + or better norms having Prime Power Rating of 25 kVA, 415 volts at 1500/3000 RPM, 0.8 lagging power factor at 415 V suitable for 50 Hz, 3 phase system & for 0.85 Load Factor, Microprocessor based Controller with digital display with Heavy-duty roadworthy trailer and Mast Lighting system consisting of LED Flood lights etc. complete as required as per technical specifications and as per direction of Engineer-In-Charge |
| 3 | SH: BEarthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. |
| 4 | Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. |
| 5 | Supplying and laying 25 mm X 5 mm copper strip as strip earth electrode, including connection/ terminating with nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt & spring washer spaced at 50mm) |
| 6 | Supplying and laying 25 mm X 5 mm G.I strip as strip earth electrode, including connection/terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) |
| 7 | Dismantling of existing Diesel Generator Set of the following rating at CCR Power House including Electrical Isolation, Disconnection of Power Cables, Removal of Exhaust & Cooling System, Mechanical Dismantling, Civil work such as removing grouting of base and making good the foundation etc. and handing over to AAI etc. complete as required as per technical specifications and as per direction of Engineer-In-Charge. |
| 8 | 750 kVA |
| 9 | 380 kVA |
| 10 | SH: CAll inclusive comprehensive maintenance of Diesel Generator Sets post defect liability period of 24 months including preventive & breakdown maintenance, all spares, consumables etc. as per good engineering practices/OEM recommendations for smooth and proper functioning of DG sets as per design specifications complete as required as per the instruction of Engineer-in-Charge. |
| 11 | Year 1 - (5% of Total SITC cost i.e SH: A) |
| 12 | Year 2 - (Yearly 6% cumulative enhancement on First Year Cost shall be applicable for Second Year) |
| 13 | Year 3 - (Yearly 8% cumulative enhancement on Second Year Cost shall be applicable for Third Year) |
| 14 | Year 4 - (Yearly 9% cumulative enhancement on Third Year Cost shall be applicable for Fourth Year) |
| 15 | Year 5 - (Yearly 10% cumulative enhancement on Fourth Year Cost shall be applicable for Fifth Year) |
| 16 | Year 6 - (Yearly 11% cumulative enhancement on Fifth Year Cost shall be applicable for Sixth Year) |
| 17 | Year 7 - (Yearly 12% cumulative enhancement on Sixth Year Cost shall be applicable for Seventh Year) |
| 18 | Year 8 - (Yearly 13% cumulative enhancement on Seventh Year Cost shall be applicable for Eighth Year) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 11, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysDec 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender