Tender for Complete Repairing Of 2 Nos 150Hp,550V Star Delta Starter, Rewinding & Mechinical Repairing Of 02 Nos 150 Hp, 550V, 1440 Rpm Electrical Induction Motor, Repairing Of 3.3Kv/400 Amps Ocb For Underground Of 5&6 Pit Surface Sub-Station Under Madhaipur Colliery And Rewinding & Repairing Of 02 Nos 50Kva,550V/440V Lighting Transformer Of Manderboni Colliery
BOQ
| Sl. No. | Item Description |
| 1 | Repairing of 150 HP, 550V Star Delta Starter at Madhaipur Colliery. (Inclusive of EPF/CMPF) |
| 2 | Dismantling of Isolator |
| 3 | Main Terminal Insulator |
| 4 | Isolator |
| 5 | Overload Assembly |
| 6 | Earth Leakge relay |
| 7 | Timer |
| 8 | CBT With Board |
| 9 | Current Transformer |
| 10 | Main Connection Cable |
| 11 | Heavy Duty Copper Socket |
| 12 | Amps Meter |
| 13 | Push Switch |
| 14 | Lamp with Holder |
| 15 | Fuse Base Carrier |
| 16 | Complete Wiring |
| 17 | Insulation and Material |
| 18 | Cleaning and Painting |
| 19 | Contractor Unit (ML-10) L&T Make |
| 20 | Profit @10% |
| 21 | Labour Charges |
| 22 | Repairing of 150 HP, 550V Star Delta Starter at Madhaipur Colliery. (Inclusive of EPF/CMPF) |
| 23 | Dismantling of Isolator |
| 24 | Main Terminal Insulator |
| 25 | Isolator |
| 26 | Overload Assembly |
| 27 | Earth Leakge relay |
| 28 | Timer |
| 29 | CBT With Board |
| 30 | Current Transformer |
| 31 | Main Connection Cable |
| 32 | Heavy Duty Copper Socket |
| 33 | Amps Meter |
| 34 | Push Switch |
| 35 | Lamp with Holder |
| 36 | Fuse Base Carrier |
| 37 | Complete Wiring |
| 38 | Insulation and Material |
| 39 | Cleaning and Painting |
| 40 | Contractor Unit |
| 41 | Profit @10% |
| 42 | Labour Charges |
| 43 | Repairing & Rewinding of 150 HP, 550V Induction motor at Madhaipur Colliery. (Inclusive of EPF/CMPF) |
| 44 | Cost of Super enamel wire |
| 45 | Cost of insulation |
| 46 | Labour Cost |
| 47 | Cost of Striping motor |
| 48 | Cost of Winding motor |
| 49 | MISC Cost |
| 50 | Supply & Fitting of 6319 No Bearing |
| 51 | Supply & Fitting of N319 No Bearing |
| 52 | Repairing of Bearing Housing |
| 53 | Cost of Repairing of Rotor Ring |
| 54 | Less Scrape value |
| 55 | Profit @10% |
| 56 | Mechanical Repairing of 150 HP, 550V Electric Induction motor at Madhaipur Colliery. (Inclusive of EPF/CMPF) |
| 57 | Dismantaling of motor and withdrawing of coils from the motor slot & cleaning decardonising of stator & rotor |
| 58 | Supply of class F varnish & thinner |
| 59 | Flexible glass cable for terminial connection & jumpering |
| 60 | Assembling of motor |
| 61 | Drying/Heat treatment of motor at required |
| 62 | Fabrication Fan cover with material |
| 63 | Rotor Bar brazing & Grinding using Rupotom Rod |
| 64 | Both side Rotor Shaft fixing & Machning as per |
| 65 | Fabrication Fan with material |
| 66 | Testing of Motor |
| 67 | Transportation Charge |
| 68 | Supply & Fitting of 6319 Bearing |
| 69 | Supply & Fitting of N319 Bearing |
| 70 | Profit @10% |
| 71 | Repairing of 3.3KV/400 Amps, OCB for underground of5&6 Pit surface sub-station of Madhaipur Colliery UnderPandaveswer Area. (Inclusive of EPF/CMPF) |
| 72 | Providing 11KV Grade molded type PT. |
| 73 | Providing Earth Leakage relay |
| 74 | Providing CBT Big Type With fixing board |
| 75 | Providing Indication set |
| 76 | Providing Shunt trip assy |
| 77 | Providing Rose contact |
| 78 | Providing power pack 110 Volt |
| 79 | Providing Male-Female molded insulator. |
| 80 | Providing PVC wiring with HT grade Cable |
| 81 | Providing fixed contact assy |
| 82 | Providing moving contact assy |
| 83 | Providing HRC LT fuse with grips |
| 84 | Providing Amps meter 200/SA- 4'' Size |
| 85 | Providing Volt meter - 3.3 KV 110 V-4'' size |
| 86 | Providing selector switch |
| 87 | Breaker unit portion decarbonizes, clean |
| 88 | Providing P.T HRC HT fuse |
| 89 | Repairing of operating mechanization. |
| 90 | Providing glass phase barrier |
| 91 | Providing brass nut-bolts & wash |
| 92 | Labour Charges at site. |
| 93 | Profit @ 10% |
| 94 | Rewinding & Repairing of 50KVA, 550V/440V Lighting Transformer at Agent banglaw of Manderboni Colliery. (Inclusive of EPF/CMPF) |
| 95 | Cost of copper wire with DPC |
| 96 | Cost of Insulating Materials (Primary & Secondary) |
| 97 | Cost of Corksheet. 4mm |
| 98 | Cost of Connection stud with insulator |
| 99 | Cost of wooden forma for making coils |
| 100 | Cost of De-carbonizing core & tank clean |
| 101 | Cost of thinner and varnish |
| 102 | Cost of cooling tubes welding & grinding |
| 103 | Re-winding charge |
| 104 | Less Scrape Value |
| 105 | Profit @10% |
| 106 | Transportation Charge |
| 107 | Rewinding & Repairing of 50KVA, 550V/440V Lighting Transformer at Guest House of Manderboni Colliery. (Inclusive of EPF/CMPF) |
| 108 | Cost of copper wire with DPC |
| 109 | Cost of Insulating Materials (Primary & Secondary) |
| 110 | Cost of Corksheet. 4mm |
| 111 | Cost of Connection stud with insulator |
| 112 | Cost of wooden forma for making coils |
| 113 | Cost of De-carbonizing core & tank clean |
| 114 | Cost of thinner and varnish |
| 115 | Cost of cooling tubes welding & grinding |
| 116 | Re-winding charge |
| 117 | Less Scrape Value |
| 118 | Profit @10% |
| 119 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender