Tender For Tender For The Execution Of Repair And Maintenance To Garden Irrigation Infrastructure, Submersible Pumpsets, Panel Boards, And Desilting Works At Archaeological Gardens Of Shore Temple, Butterball, Five Rathas, Mukundanayanar Temple, Sala
Tender Overview
Project Description
Tender for Tender For The Execution Of Repair And Maintenance To Garden Irrigation Infrastructure, Submersible Pumpsets, Panel Boards, And Desilting Works At Archaeological Gardens Of Shore Temple, Butterball, Five Rathas, Mukundanayanar Temple, Salavankuppam Caves, Sadras Fort And Archaelological Garden At Fort St. George Chennai - 2026-27 Fy
BOQ
| Sl. No. | Item Description |
| 1 | Replacement of Worn-out Panel Boards & Electrical Components at Archaeological Garden at Shore Temple, Mamallapuram; Supply and installation of 30\\" x 30\\" poly-enamelled indoor panel board with 36\\" GI leg stand (near RO plant), including cost of all materials and installation charges complete. |
| 2 | Supply and installation of L&T SWITCHGEAR MU-G10 DOL Starter for 5 HP/3.7 kW pump (6-10 Amp), CAT No. SS95983COVO, including cost of all materials and installation charges complete. |
| 3 | Supply and installation of L&T MR-G2-2 HP Single Phase Control Panel for submersible pump, including cost of all materials and installation charges complete. |
| 4 | Supply and installation of L&T 4-Pole 100A Isolator, including cost of all materials and installation charges complete. |
| 5 | Supply and installation of 2-Pole UNO Series Isolator, 100A, including cost of all materials and installation charges complete. |
| 6 | Fixing and installation charges for above starters with pumpset, including necessary connections, testing and commissioning charges complete. |
| 7 | Shifting of existing EB service No. 574-012-1150 from car parking to ticket counter (LS), including disconnection, re-routing, re-fixing and commissioning charges complete. |
| 8 | Borewell Drilling & Allied Submersible Pump Installation at Archaeological Garden at Shore Temple, Mamallapuram; Drilling of 8\\" dia hand borewell (2 nos x 12 mtr) in all kinds of soil/strata, including hire charges of tools, plants and labour charges complete. |
| 9 | Supply and installation of 8\\" dia PVC casing pipe with drilled holes (2 nos x 12 mtr), including cost of all materials, jointing and installation charges complete. |
| 10 | Supply and installation of 8\\" dia casing pipe cap, including cost of all materials, fixing and installation charges complete. |
| 11 | Supply and installation of cloth net (2 nos x 8 mtr) around casing pipe, including cost of all materials, wrapping and fixing charges complete. |
| 12 | Supply and installation of 1.25\\" GI bore clamp, including cost of all materials, bolts, nuts and fixing charges complete. |
| 13 | Supply and application of PVC solvent cement (250 ml x 2 nos) for jointing casing/UPVC pipes, including cost of all materials and labour charges complete. |
| 14 | Supply and installation of Borewell Submersible Pump, 2 HP, Single Phase, 65mm with control panel, including cost of all materials, lowering, alignment and installation charges complete. |
| 15 | Supply and installation of 1.25\\" UPVC column pipe (2 nos x 12 mtr), including cost of all materials, couplers, solvent jointing and installation charges complete. |
| 16 | Supply and installation of 1.25\\" GM Non-Return Valve (NRV), including cost of all materials, jointing and installation charges complete. |
| 17 | Supply and installation of 1.25\\" dia oval flange set with bolts & nuts, including cost of all materials, gaskets and fixing charges complete. |
| 18 | Supply and installation of 2.5 sqmm x 3-core flat submersible copper cable (2 nos x 30 mtr), including cost of all materials, clipping, waterproof jointing and installation charges complete. |
| 19 | Supply and installation of 2 ft dia x 1 ft height cement rings (2 nos x 2 nos = 4 nos), including cost of all materials, placing, alignment and installation charges complete. |
| 20 | Supply and installation of 2 ft dia precast cement cover cap (2 nos x 1 no = 2 nos), including cost of all materials, handling and placing charges complete. |
| 21 | Supply and laying/installation of 25 mm Aluminium cable for EB service, including cost of all materials, trenching/clamping and installation charges complete. |
| 22 | Supply and installation of 1.25\\" Rain-gun complete set (HT40G ISI Penguin) with GI riser pipe & adjustable stand, including cost of all materials and installation charges complete. |
| 23 | Desilting of Existing Open Well & Restoration Works at Archaeological Garden at Butter Ball & Arjuna's Penance, Mamallapuram Desilting of existing open well (Main water source for pumping to Butter Ball, Shore Temple & Five Rathas) by removing accumulated garbage, muck, sand and silt, including dewatering, lifting, disposal and all labour charges complete. |
| 24 | Carefully dismantling & removing undulated/tilting stone apron/flooring and relaying over 100mm brick jelly concrete in pure lime 1:2, set in CM 1:3, pointing stone joints with 1:1:3 combination mortar, colour matching, curing and all material & labour charges complete. |
| 25 | Applying two coats of synthetic enamel paint to MS grills of approved shade after thorough surface cleaning, de-rusting, including cost of all materials, scaffolding and labour charges complete. |
| 26 | Repairing of existing 12 HP open well submersible pumpset including rewinding of motor, replacement of worn-out/damaged parts, dynamic balancing, lifting & re-erection charges complete. |
| 27 | Supply and installation of 2\\" dia GM gate valves, NRV, pipe nipples and flange set in replacement of worn-out fittings, including cost of all materials, jointing and installation charges complete. |
| 28 | Replacement of Worn-out Panel Boards & Electrical Components at Archaeological Garden at Five Rathas, Mamallapuram Supply and installation of 30\\" x 30\\" poly-enamelled indoor panel board with 36\\" GI leg stand (installed inside & outside garden), including cost of all materials and installation charges complete |
| 29 | Supply and installation of Motor Starter Oil Immersed 5 HP Semi-Automatic Three Phase 415 V, BSA/5 HP, including cost of all materials, wiring and installation charges complete. |
| 30 | Supply and installation of L&T MR-G2-1.5 HP Single Phase Control Panel for submersible pump, including cost of all materials, wiring and installation charges complete. |
| 31 | Supply and installation of L&T 4-Pole 100A Isolator, including cost of all materials, mounting and installation charges complete. |
| 32 | Supply and installation of 2-Pole UNO Series Isolator, 100A, including cost of all materials, mounting and installation charges complete. |
| 33 | Fixing and installation charges for above starters with pumpset, including necessary electrical connections, testing and commissioning complete. |
| 34 | Desilting charges of existing borewell near Five Rathas (2 nos x 12m = 24m) including lifting & re-erection of pumpset, cleaning tree roots, sand, silt, garbage and all labour charges complete. |
| 35 | Replacement of Worn-out Panel Boards & EB Service Cable at Archaeological Garden at Mukundanayanar Temple, Mamallapuram Supply and installation of 30\\" x 30\\" poly-enamelled indoor panel board with 36\\" GI leg stand (near RO plant), including cost of all materials and installation charges complete. |
| 36 | Supply and installation of L&T MR-G2-2 HP Single Phase Control Panel for submersible pump, including cost of all materials, wiring and installation charges complete. |
| 37 | Supply and installation of 2-Pole UNO Series Isolator, 100 Amp, including cost of all materials, mounting and installation charges complete. |
| 38 | Supply and laying/installation of 7/16-gauge Aluminium wire for EB service cable replacement, including cost of all materials, drawing through pipe/insulators and installation charges complete. |
| 39 | Supply and installation of 15\\" x 18\\" Wooden meter board, including cost of all materials, mounting, wall plugs and installation charges complete. |
| 40 | Supply and installation of 63A isolator switch, including cost of all materials, connections and installation charges complete. |
| 41 | Supply and installation of 63A fuse carrier (cut-out), including cost of all materials, mounting and installation charges complete. |
| 42 | Supply and installation of 2\\" GI B-class pipe for service line protection, including cost of all materials, clamps, cutting, threading and installation charges complete. |
| 43 | Supply and installation of 1½\\" GI B-class pipe for service line protection, including cost of all materials, clamps, cutting, threading and installation charges complete. |
| 44 | Supply and installation of 1½\\" GI bend, including cost of all materials, threading, jointing and installation charges complete. |
| 45 | Supply and installation of 1½\\" GI coupling, including cost of all materials, jointing and installation charges complete. |
| 46 | Supply and installation of 2\\" x 1¼\\" GI reducer coupling, including cost of all materials, jointing and installation charges complete. |
| 47 | Supply and installation of copper wire for equipment and board earthing, including cost of all materials, drawing, lugs and installation charges complete. |
| 48 | Labour charges for fixing, wiring, interconnection, testing and commissioning of meter board, panel and accessories complete (Job). |
| 49 | Replacement of Worn-out Panel Boards & Accessories at Archaeological Garden at Tiger Headed Rock-Cut Caves, Salavankuppam ) Supply and installation of 30\\" x 30\\" poly-enamelled indoor panel board with 36\\" GI leg stand (installed inside & outside garden), including cost of all materials and installation charges complete. |
| 50 | Supply and installation of L&T SWITCHGEAR MU-G10 DOL Starter for 5 HP/3.7 kW pump (6-10 Amp), CAT No. SS95983COVO, including cost of all materials, wiring and installation charges complete. |
| 51 | Fixing and installation charges for above starter with pumpset, including cable connection, testing and commissioning complete. |
| 52 | Repair & Maintenance of Submersible / Monoblock Pump Set & Panel Box at Archaeological Garden at Ruined Dutch Fort and Cemetery, Sadras Repairing of single-phase 2 HP borewell submersible pumpset including complete motor rewinding, replacement of damaged coil/bearings/bush, testing and transportation charges complete |
| 53 | Supply and installation of single-phase 2 HP motor starter, including cost of all materials, connections and installation charges complete. |
| 54 | Lifting and re-erecting of pump set into borewell & fixing of starters, including testing and commissioning charges complete. |
| 55 | Providing and fixing borewell submersible pump, electrical cabling, and sprinkler system at the Archaeological Garden, Fort St. George, Chennai.Supply and installation of Borewell Submersible Pump, 1.5 HP, Single Phase, 220V, 65mm with control panel, including cost of all materials, jointing and installation charges complete. |
| 56 | Supply and installation of 1.25\\" dia UPVC pipe (1 nos × 12 mtr), including cost of all materials, jointing and installation charges complete. |
| 57 | Supply and installation of 1.25\\" GM Non-Return Valve (NRV), including cost of all materials, jointing and installation charges complete. |
| 58 | Supply and installation of 1.25\\" dia Oval flange set with bolt & nuts, including cost of all materials, jointing and installation charges complete. |
| 59 | Supply and installation of 2.5 sqm × 3-core flat cable (2 nos × 30 mtr), including cost of all materials, jointing and installation charges complete. |
| 60 | Supply and installation of 25 mm Aluminium cable for EB service, including cost of all materials, jointing and installation charges complete. |
| 61 | Supply and installation of 63mm dia 6kg/cm² rigid ISI PVC pipe, including cost of all materials, jointing and installation charges complete. |
| 62 | Supply and installation of Pop-Up Sprinkler (replacement & non-covering area), including cost of all materials, jointing and installation charges complete. |
| 63 | Supply and installation of 1.25\\" Pasting Type 6kg/cm² Rigid PVC Pipe, including cost of all materials, jointing and installation charges complete. |
| 64 | Supply and installation of 1.25\\" × 3/4\\" Service Saddle, including cost of all materials, jointing and installation charges complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents