Tender For Construction Of New Divisional Forest Office
Tender Value
3.29 Crore
Estimated cost
Bid Submission
05 Dec 2026
12 days left
EMD
3.29 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sambalpur → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of New Divisional Forest Office
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation in all kind of soil within 50 m, initial lead and1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and earth trasported by transport vehicles as per the direction of the Engineer-in-charge.(0.00 TO 1.5m depth) |
| 2 | Filling at all depth with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 15cm in depth: consolidating each deposited layer by ramming and watering complete (lead upto 100m) as directed by the Engineer-In-charge. |
| 3 | Filling in foundation, trenches and plinth with river sand, well watered and compacted in layers of 0.3 mtr, with top surface dressed and leveled to proper gradient including cost of all materials, conveyance, all taxes and royalties, loading and unloading, including cost of all labour, sundries ,T & P etc. All complete as per directions of the Engineer -in-charge. |
| 4 | Providing and laying plain cement concrete 1:3:6 (1 cement : 3 sand : 6 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring ,shuttering etc.complete all depth and height. |
| 5 | Providing Fly ash bricks masonry work using (250mmx120mmx80mm size) having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6). Immersing the bricks in water before use in all necessary projection splays cutting, circular moulding, corbelling etc. Including cost of conveyance ,taxes & royalties, loading and unloading of all materials & cost of all labour, scaffolding ,watering & curing ,sundries, T & P etc. complete as per the direction of Engineer-in-charge . |
| 6 | Providing Fly ash bricks masonry work using (250mmx120mmx80mm size) having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6). Immersing the bricks in water before use in all necessary projection splays cutting, circular moulding, corbelling etc. Including cost of conveyance ,taxes & royalties, loading and unloading of all materials & cost of all labour, scaffolding ,watering & curing ,sundries, T & P etc. complete as per the direction of Engineer-in-charge .Ground Floor |
| 7 | Providing Fly ash bricks masonry work using (250mmx120mmx80mm size) having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6). Immersing the bricks in water before use in all necessary projection splays cutting, circular moulding, corbelling etc. Including cost of conveyance ,taxes & royalties, loading and unloading of all materials & cost of all labour, scaffolding ,watering & curing ,sundries, T & P etc. complete as per the direction of Engineer-in-charge . First Floor |
| 8 | Providing Fly ash bricks masonry work using (250mmx120mmx80mm size) having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6). Immersing the bricks in water before use in all necessary projection splays cutting, circular moulding, corbelling etc. Including cost of conveyance ,taxes & royalties, loading and unloading of all materials & cost of all labour, scaffolding ,watering & curing ,sundries, T & P etc. complete as per the direction of Engineer-in-charge .Second Floor |
| 9 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis). Footing |
| 10 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Plinth beam |
| 11 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Column Ground Floor |
| 12 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Column First Floor |
| 13 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Column Second Floor |
| 14 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Lintel |
| 15 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Beam Ground Floor |
| 16 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Beam First Floor |
| 17 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Beam Second Floor |
| 18 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Roof Slab-Ground Floor |
| 19 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Roof Slab-First Floor |
| 20 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Roof Slab-Second Floor |
| 21 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).Stairs |
| 22 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).RCC Walls Ground Floor |
| 23 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).RCC Walls First Floor |
| 24 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. Including cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. (See Item no. 12a analysis).RCC Walls Second Floor |
| 25 | Providing, fixing in position TMT Fe-500 reinforcement bars for RCC work of required diameter of approved quality including straightening, cutting, bending, binding, welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the specification & direction of Engineer -in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) Ground Floor |
| 26 | Providing, fixing in position TMT Fe-500 reinforcement bars for RCC work of required diameter of approved quality including straightening, cutting, bending, binding, welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the specification & direction of Engineer -in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) First Floor |
| 27 | Providing, fixing in position TMT Fe-500 reinforcement bars for RCC work of required diameter of approved quality including straightening, cutting, bending, binding, welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the specification & direction of Engineer -in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) Second Floor |
| 28 | Providing, fabricating,transporting,assembling & erection in position of steel members for steel columns,builtup beams using structural tubular sections (TATA, SAIL, JSL, APL Apollo) (round, square or rectangular hollow tubes etc. confirming to IS 4923/ IS 1161, yield strength 310 Mpa as per latest IS code) to the required profile & shape as per the drawing & specifications. This item also includes the shear connectors/ Studs & fusion weld to top of horizontal member. This item also includes preparation of shop drawings & their approval, necessary templates, adequate temporary supports, scaffolding & staging all cutting, grinding, sliding & all labour, tools , plants & equipments & operations etc. required to complete the job as per drawing & specification every precaution to be taken to prevent rusting of sections. This item also includes all test on materials & welded fabricated parts as per specifications & direction of Engineer In Charge. |
| 29 | 12 mm cement plaster on external smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. all complete as per the specification and direction of Engineer-In-charge. First Floor |
| 30 | 12 mm cement plaster on external smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. all complete as per the specification and direction of Engineer-In-charge. Second Floor |
| 31 | Providing 16mm thick cement plaster to the surface of brick masonry wall with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plaster surface smooth using wooden floats only to proper plumbs and level and making grooves and beads to give required ornamental finish as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing, sundries and T&P etc all complete as per direction of the Engineer -in-charge Ground Floor |
| 32 | Providing 16mm thick cement plaster to the surface of brick masonry wall with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plaster surface smooth using wooden floats only to proper plumbs and level and making grooves and beads to give required ornamental finish as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing, sundries and T&P etc all complete as per direction of the Engineer -in-charge First Floor |
| 33 | Providing 16mm thick cement plaster to the surface of brick masonry wall with cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plaster surface smooth using wooden floats only to proper plumbs and level and making grooves and beads to give required ornamental finish as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing, sundries and T&P etc all complete as per direction of the Engineer -in-charge Second Floor |
| 34 | Providing 6mm thick cement plaster with cement mortar of (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including roughening, scraping and cleaning and finishing the plastered surface smooth using wooden floats only to proper plumbs and level, making grooves and beads to give required ornamental finish as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing , sundries and T&P etc all complete as per direction of the Engineer -in-charge First Floor |
| 35 | Providing 6mm thick cement plaster with cement mortar of (1:4) to ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including roughening, scraping and cleaning and finishing the plastered surface smooth using wooden floats only to proper plumbs and level, making grooves and beads to give required ornamental finish as per drawings including cost of all materials, conveyance, loading and unloading, all taxes and royalties, all labour, scaffolding, watering and curing , sundries and T&P etc all complete as per direction of the Engineer -in-charge Second Floor |
| 36 | Fixing Kota tiles in floors, treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slurry mixed with pigment to match the shades on the tiles etc. complete. |
| 37 | Fixing Kota tiles in dados skirting and risers of step on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete. |
| 38 | Providing and laying Matte Finish Vitrified floor tiles 300x300 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 20 mm thick cement mortar 1:4 (1cement:4coarse sand) including pointing the joints with white cement and matching pigments, etc. complete as per direction of Engineer-In-Charge at all floors and all heights. |
| 39 | Providing and fixing 1st quality Ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer) minimum thickness 5mm of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make in all colours, shades except burgundy, bottle green, black of size 300x200 in skirting and dados over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete as per direction of Engineer-In-Charge. In all floors and all heights. |
| 40 | Supplying fitting, fixing Fatory made single leaf rigid FRP sandwich composite Door/Window Frame & shutter (allternatly GRP) of 32 mm thick laminated with two GRP skins with wood grain finish fabricated using UV-stabilised isopathalic Gelcoat and one layer of 450 gsm E-glass Chopped Strand Mat (CSM) mpregnate with orthopthalic polysterskin. The thickness of the skins shall not be less than 1.5 mm Expanded polystyone(EPS) structural foam panel of 29 mm thickness and a density of 20 kg/cu.mtr shall be used as core material. Wooded reinforcement made of seaoned sal wood block of cross section not less than 28mm x 32mm and also necessary sal wood reinfocements for fitting the metal fittings such as tower bolt, aldrop. hanles, etc. shall be provided. A structural adhesive compatible with (EPS) foam shall be used for bending the core material. The material and process for manufacturing the door shutters shall be conform to RV- TIFAC composite design Center's standards and specifications and the door shutters tested in conforming to IS: 4020-1998. The finish door shutter will be plain colour as per specification and diection of Engineer-In-Charge. |
| 41 | Supplying, fitting, fixing up window (sliding type) made up Black/white Powder coated aluminum Section 151-154, 151-155, as windows frame section No. 151-155, 151-153 and 151-167 as shutter frame with 5mm thick Reflective/Toughtened glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-in-charge. |
| 42 | Providing and fixing of fixed and open able 10mm thick ST167 toughned glass (Saint-Gobain) Glazing with part Top and bottom openable middle fixed of approved make to be fabricated from pre-painted aniondised Aluminium sections (Hindalco) with finished paint with aniondised paint (Black /Golden Brown) of 50 microns along with the silicon filled and studs hole support and the sizes of outer frame being of 80x40x2 mm and with all vertical and horizontal mullions with all accessories. |
| 43 | Providing, fitting & fixing M.S grill fabricated from circular hollow bar/square hollow bars/hollow bars/flats as per approved drawing and design including one coat of red oxide primer, cost, conveyance & taxes of all materials, fabrication charges, fixing in position to RCC columns / walls in cement concrete (1:2:4) and making good to the damages complete as per direction of the Engineer-in-charge. The rates shall be inclusive of all cost of Materials, labour, T&P Shuttering etc complete. |
| 44 | Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. First Floor. |
| 45 | Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.Second Floor. |
| 46 | Wall painting 2 coats with weather coat of approved shade on new work over a coat of primer to give an even shade including cost of paint.First Floor |
| 47 | Wall painting 2 coats with weather coat of approved shade on new work over a coat of primer to give an even shade including cost of paint. Second Floor |
| 48 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. First Floor |
| 49 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete.Second Floor |
| 50 | Providing & painting two coats of Plastic emulsion paint with 1st quality of approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. First Floor |
| 51 | Providing & painting two coats of Plastic emulsion paint with 1st quality of approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. Second Floor |
| 52 | Providing & Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the instruction of Engineer-In-Charge at all floors and all heights including all material & labour complete. |
| 53 | Providing and laying grading conc. 25 mm (avg. thickness) cement concrete of required slope of mix 1:2:2 (1cement:2sand:2 graded stone aggregate of 10 mm nominal size) mixed with approved water proof compound as per manufacturer's specification on top of slab including cement slurry, all complete, including the cost of water proofing admixture, which should be approved by the Engineer-In-Charge prior to material procurement by the contractor. |
| 54 | Providing waterproofing for Toilet/SukenSlab:- Cleaning the inside surface & & Application of two coats of Perma/sika Top seal 109 hi @ 2.2 Kg/Sqm & Perma/Sika Fab-1 to the battom slab & side wall surface to protect against leakage & seepage finally covered with a cement mortar (1:4). Proper care should be taken to fill the pipe penetration points with sikagard 694 fi (moisture resistant epoxy putty) complete as per manufacture specification and direction of Engineer-In-Charge at all floors and all heights. Brand - Perma/Sika or equivalent. |
| 55 | INTERNAL P.H. & SANITARY |
| 56 | EXTERNAL WATER SUPPLY SYSTEM |
| 57 | BORE WELL 100rmt |
| 58 | SEPTIC TANK (1 NOS) |
| 59 | SOAK PIT (3 NOS) |
| 60 | Recessed wiring to light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5 Amp, 250 V piano type switch ISI marked and ceiling rose ISI marked mounted on MS box having front bakelite cover of suitable size , MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex / L&T / Anchor / Havels / V Guard/ Crompton )) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 61 | Supplying and fixing of metal box of 207 mm x 132 mm x 56 mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 5 / 6 amps socket outlet and 5 / 6 amps piano type switch, connection, painting etc as required. (For light plugs to be used in non residential buildings) ( Make of wire Finolex / L&T / Anchor / Havels / V Guard/ Crompton )) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 62 | Supplying and fixing of metal box of 132 mm x 100 mm x 56 mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin15 amps socket outlet and 15 amps piano type switch, connection, painting etc as required. (For light plugs to be used in non residential buildings) ( Make of wire Finolex / L&T / Anchor / Havels / V Guard/ Crompton )) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 63 | Recessed wiring to submain in 2 x 1.5 sq. mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq. mm FR PVC insulated single core multistrand copper conductor as earth wire as equired. (Make of wire Finolex /L&T /Anchor / Havels / V Guard) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 64 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.(Make of wire Finolex/L&T/Anchor/Havels/V Guard) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 65 | Recessed to submain in 2 x6.0 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired.(Make of wire Finolex/L&T/Anchor/Havels/V Guard) including all accessories & connection etc. complete as per direction of Engineer-in-charge. |
| 66 | Supply and fixing of Havels 63Amp 4 pole MCB in sheet steel enclosure, distribution board, on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ ISOLATOR) |
| 67 | Supply and fixing of Havels 32Amp 2 pole MCB in sheet steel enclosure, distribution board, on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ ISOLATOR) |
| 68 | Supply and fixing of Havels 16DP MCB Box with sheet steel enclosure, distribution board, on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ ISOLATOR) |
| 69 | Supplying & Installation, Testing and Commissioning of LED pre-wired Hanging fluorescent fiiting / compact fluorescent fitting 40Watt with regulator copper choke & stater (Havels/Bajaj/Phillips) directly on ceiling wall, including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor and earthing as required etc. complete as per direction of Engineer-in-charge. |
| 70 | Supplying & Installation, Testing and Commissioning of ceiling fan 1200mm(48\\") 5star double ball bearing, 370rpm,cupper wiring with regulator (Havels /Bajaj /Crompton/Phillips ) including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FR PVC insulated single core multiatrand copper conductor etc. as required. |
| 71 | Supplying & fixing of superior type Batten holder/BK Angle holder electrical accessories of approved quality ( I.S.I. marked) and make (Anchor) with all accessories & connection etc. complete as per direction of E.I.C. |
| 72 | 40mm dia GI bracket for service connection including cost of GI pipe & labour charges for making holes as per required size & making good to it complete Including cost ,transportation & taxes of all materials,T&P required for the work with all accessories & connection etc. complete as per direction of E.I.C. |
| 73 | Supply, Installation, Testing, and Commissioning of Panel Box with CR sheet of following capacity (IS 13940 Part 3/1993 ) on existing surface / wall mountnting and complete with HRC Fuse links, Change over, Porceilin Kitkat,MCB,Bus Bar,Indiator, interconnections, earthing, etc. as required as per direction of EngineerinCharge.Make SEIMENS/HPL/ANCHOR/L&T/HAVELS/C & S/ RK/L&T |
| 74 | S/F of standard earthing confirming to IS-3043/1987 including supply & fixing of 38mm or 10mm dia heavy duty G.I. pipe 3mtr long confirming to IS-1239 part-1/1990 the pipe shall have 12mm dia perforated holes at 15cm interval c/c upto 2mt height from the bottom, upper & threaded & fitted with 38mm/40mm dia GI flange with provision of hole for making connection of earth continuity wire with excavation of Pit of size 0.75mtx0.75mtx3.0mt, masonary works,an alternate layer of 105mm charcoal,50mm salt, & S/F of C.I. hinged top cover;plastering & laying the wire as earth continuity conductor from main switch to earth electrol both end of earth wire should be provided with copper cable socket duly soldered & fixed by GI nut & bolt with all accessories & connection etc. complete as per direction of E.I.C. |
| 75 | PART-A (AC UNIT Calculated for 40 HP) |
| 76 | PART-B (Installation) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysDec 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.