Tender For Mtps-I - Mill Plant - Centralized A.C Plant - Attending Breakdown Works In A.C. Cooling Tower Fans, Air Handling Units, Air Washer System, Circulating Water Pumps, Pipe Lines And Valves Etc. For A Period Of Of 365 Days From The Date Of Com
Tender Overview
Project Description
Tender for Mtps-I - Mill Plant - Centralized A.C Plant - Attending Breakdown Works In A.C. Cooling Tower Fans, Air Handling Units, Air Washer System, Circulating Water Pumps, Pipe Lines And Valves Etc. For A Period Of Of 365 Days From The Date Of Commencement Of Works
BOQ
| Sl. No. | Item Description |
| 1 | Charges for removing the damaged Love joy coupling from the CT fan gear shaft, motor shaft and from both end of the Transmission shaft and then re-fixing the coupling each sides - 2 Nos. and aligning motor with fan. |
| 2 | Model 12:- Charges for removing Blower/motor pulley from the shaft and then re-fixing the new pulley / replacing pulley into the shaft. |
| 3 | Charges for removing damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and replacing the new Plummer block and bearing and then greasing. |
| 4 | Charges for blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension & commissioning satisfactorily. |
| 5 | Model 7 & 5 :- Charges for removing blower pulley and the damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and then re-fixing the new pulley and bearing and then greasing and aligning motor with blower. |
| 6 | Model 7:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower. |
| 7 | Model 5:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower. |
| 8 | Charges for removing AWS Blower pulley from the shaft by heating and then re-fixing the pulley into the shaft. |
| 9 | Charges for removing the damaged bearing, cleaning the bearing seating area and replacing the new bearing and then greasing AWS Blower (Drive end / Non drive end). |
| 10 | Charges for AWS Blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension and commissioning satisfactorily. |
| 11 | Charges for De-Coupling the AWS CWP and the motor, dismantling the pump casing removing the shaft and the impeller assembly from the casing and removing the damaged both DE bearing and NDE Bearing, cleaning the bearing seating area, replacing the new bearing and assembling the pump, coupling the pump with motor and alignment checking. |
| 12 | Charges for welding the punctured AHU chill water, inlet, out let pipe of various sizes in various locations by providing spool piece and gauge nipples. |
| 13 | Renewing the gate valves and gaskets for 100/150/200/250mm valves: This works involves removing the valves from the line, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening the flange bolts & nuts. |
| 14 | Cost of cutting gas DA and oxygen |
| 15 | Cost of welding electrodes Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender