Power Boards / Undertakings / PSU Closing in 11 days TDR #58601828

Tender For Mtps-I - Mill Plant - Centralized A.C Plant - Attending Breakdown Works In A.C. Cooling Tower Fans, Air Handling Units, Air Washer System, Circulating Water Pumps, Pipe Lines And Valves Etc. For A Period Of Of 365 Days From The Date Of Com

Issued by Boards / Undertakings / PSU · Salem, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Dec 2026
11 days left
EMD
5700
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Mtps-I - Mill Plant - Centralized A.C Plant - Attending Breakdown Works In A.C. Cooling Tower Fans, Air Handling Units, Air Washer System, Circulating Water Pumps, Pipe Lines And Valves Etc. For A Period Of Of 365 Days From The Date Of Commencement Of Works

BOQ

Name of Work:- MTPS-I - Mill Plant – Centralized A.C Plant – Attending Breakdown works in A.C. Cooling tower fans, Air handling units, Air washer system, Circulating water pumps, pipe lines and valves etc. for a period of of 365 days from the date of commencement of works
Sl. No. Item Description
1Charges for removing the damaged Love joy coupling from the CT fan gear shaft, motor shaft and from both end of the Transmission shaft and then re-fixing the coupling each sides - 2 Nos. and aligning motor with fan.
2Model 12:- Charges for removing Blower/motor pulley from the shaft and then re-fixing the new pulley / replacing pulley into the shaft.
3Charges for removing damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and replacing the new Plummer block and bearing and then greasing.
4Charges for blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension & commissioning satisfactorily.
5Model 7 & 5 :- Charges for removing blower pulley and the damaged bearing from the blower shaft, cleaning the drive end / non-drive end bearing seating area and then re-fixing the new pulley and bearing and then greasing and aligning motor with blower.
6Model 7:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower.
7Model 5:- Charges for dismantling and assembling the back side door to remove the defective shaft and the Impeller replacing with new one after assembling the drive end and non-drive end bearing, fixing the pulley and aligning motor with blower.
8Charges for removing AWS Blower pulley from the shaft by heating and then re-fixing the pulley into the shaft.
9Charges for removing the damaged bearing, cleaning the bearing seating area and replacing the new bearing and then greasing AWS Blower (Drive end / Non drive end).
10Charges for AWS Blower motor positioning on the bed, balancing blower, aligning motor with blower and providing belt and adjusting belt tension and commissioning satisfactorily.
11Charges for De-Coupling the AWS CWP and the motor, dismantling the pump casing removing the shaft and the impeller assembly from the casing and removing the damaged both DE bearing and NDE Bearing, cleaning the bearing seating area, replacing the new bearing and assembling the pump, coupling the pump with motor and alignment checking.
12Charges for welding the punctured AHU chill water, inlet, out let pipe of various sizes in various locations by providing spool piece and gauge nipples.
13Renewing the gate valves and gaskets for 100/150/200/250mm valves: This works involves removing the valves from the line, cleaning the flange surface on both sides, preparation of gaskets for both ends, positioning the valve in the line with gaskets and tightening the flange bolts & nuts.
14Cost of cutting gas DA and oxygen
15Cost of welding electrodes Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58601828
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 02-12-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Mtps-I - Mill Plant - Centralized A.C Plant - Attending Breakdown Works In A.C. Cooling Tower Fans, Air Handling Units, Air Washer System, Circulating Water Pumps, Pipe Lines And Valves Etc. For A Period Of Of 365 Days From The Date Of Commencement Of Works
Basic Detail
Tender No CE / MTPS-I / SE / M-I / MP /OT.266/2026-27
Bidding Type Tender
Location
City Salem
State Tamil Nadu
Key Dates
Publish Date 18 Nov 2026
Submission Date 02 Dec 2026
Open Date 03 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5700
Exemption Available
Document List
3b113a90-e830-4454-8319-8d1e050c3ba3.html
BOQ_873614.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Dec 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

3b113a90-e830-4454-8319-8d1e050c3ba3.html

xls

BOQ_873614.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender