Tender For Nctps-I - Cm Circle - Cm-I - Periodical Cleaning Of All Drains In Bottom Ash Hopper Plant Area, Boiler Area And Mill Area In Unit-I, Ii & Iii And ‘C Row Drain At Power House For A Period Of One Year From The Date Of Commencement Of Work.
Tender Overview
Project Description
Tender for Nctps-I - Cm Circle - Cm-I - Periodical Cleaning Of All Drains In Bottom Ash Hopper Plant Area, Boiler Area And Mill Area In Unit-I, Ii & Iii And ‘C Row Drain At Power House For A Period Of One Year From The Date Of Commencement Of Work.
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CE/NCTPS-I Name of Work: NCTPS-I - CM Circle - CM-I – Periodical cleaning of all drains in bottom ash hopper plant area, boiler area and mill area in Unit-I, II & III and ‘C’ row drain at Power House for a period of one year from the date of commencement of work. Contract No: CE/SE/CM/NCTPS-I/45/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Periodical cleaning of all drains in bottom ash hopper plant area, boiler area and mill area in Unit-I, II & III and ‘C’ row drain at Power House for a period of one year from the date of commencement of work. |
| 3 | Removal of wet ash, waste coal and debris etc., deposited in drains and disposal of the same at a distance of 3 km away from the site including cost of labour, lead ,lift, loading, unloading, transportation etc. complete (SS20B) A.Boiler area drains-Monthly Once for 576.50m for one operation |
| 4 | B.Power house ‘C’ Row drain and Mill area -Twice in a month for 487.00m for one operation) |
| 5 | Removal of drain cover slab from the position and stacked in one location and after cleaning of drains relaying the same in position including cost of all materials, labour, lead, lift, etc., complete. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender