Tender For Comprehensive Study Of Renewable Energy Integration And Its Impact On The Ehv/Hv Network, Including Assessment Of System Constraints And Strengthening Requirements, In Una & Kangra Areas Of Himachal Pradesh
Tender Value
2.50 Crore
Estimated cost
Bid Submission
16 Dec 2026
27 days left
EMD
2.50 Lakhs
Bank guarantee accepted
Document Fee
1475
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Shimla → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Comprehensive Study Of Renewable Energy Integration And Its Impact On The Ehv/Hv Network, Including Assessment Of System Constraints And Strengthening Requirements, In Una & Kangra Areas Of Himachal Pradesh
BOQ
| Sl. No. | Item Description |
| 1 | BOQ (Annexure A) NAME OF WORK: COMPREHENSIVE STUDY OF RENEWABLE ENERGY INTEGRATION AND ITS IMPACT ON THE EHV/HV NETWORK, INCLUDING ASSESSMENT OF SYSTEM CONSTRAINTS AND STRENGTHENING REQUIREMENTS, IN UNA & KANGRA AREAS OF HIMACHAL PRADESH Scope of Work Total Amount(in Rs) |
| 2 | DATA COLLECTION, FIELD SURVEY & POWER QUALITY ASSESSMENT: The bidder shall collect, compile, verify and validate the data required for study of the electrically relevant network in Una and Kangra areas from 220 kV to 11 kV. Available reference SLDs/network diagrams shall be provided by HPSEBL as indicated under Clause 3.4 and Annexures I and II of the bidding document. Individual SLDs of HPSEBL substations shall be made accessible through the concerned offices during execution of the assignment. The bidder shall identify data gaps and obtain/verify the required line/cable, transformer, tap/OLTC, equipment, reactive compensation, protection, substation and other study-relevant data from available records and through field survey/site verification as necessary for completion of the studies.Relevant details of existing, under-construction, sanctioned/proposed Solar Power Plants (SPPs)/other RE sources, including capacity, point of interconnection, evacuation arrangement, inverter characteristics/settings, reactive capability and generation/operating characteristics required for the study, shall be collected. Indicative project details are provided under Annexure-III. Available DPRs of commissioned/SCOD-stage SPPs and connectivity approvals/proposals may be accessed through the concerned HPSEBL offices under Clause 3.4. For RE plant the bidder shall obtain and verify the additional plant technical/operating data required for the studies, including actual MW/MVAR injection, power factor and inverter reactive-power/control characteristics for commissioned SPPs. Relevant operating RE plants shall be visited wherever necessary.Available feeder/substation loading and operating data, including representative maximum/minimum loading, MW/MVAR, power factor, voltage and other relevant parameters, shall be compiled from available records/metering data and supplemented, wherever necessary, through field observations/measurements.Necessary power-quality measurements shall be carried out at all HPSEBL substations covered under Annexures I and II of the bidding document to assess the power-quality characteristics of the study network and the impact of renewable energy integration, covering applicable parameters such as voltage/current, MW/MVAR, power factor, frequency, voltage variation/unbalance, harmonics/THD and flicker.Deliverable: Validated study database and Data Collection, Field Survey & Power Quality Assessment Report, including measurement locations, durations, recorded PQ parameters and identified data gaps. |
| 3 | POWER SYSTEM MODELLING, VALIDATION & STUDY SCENARIO DEVELOPMENT: Based on the data collected and verified under Job No. 1, the bidder shall develop a detailed, validated and reusable electrical model of the Una and Kangra study network from 220 kV to 11 kV, including such adjoining network as necessary for appropriate representation of source/boundary conditions, using standard professional Power System Analysis Software.The model shall appropriately represent the lines/cables, transformers, buses, loads, reactive compensation, relevant RE generation and other system elements required for the studies. It shall be validated using available operating records, metering data, field-verified network/equipment data and field observations/measurements. Material data limitations/discrepancies and assumptions adopted shall be appropriately documented.Study cases shall include the existing (AS-IS) network as the base case, present maximum/peak load, minimum/light load, high/maximum RE generation, high-RE with minimum/light load, appropriate future load/RE-growth scenarios including upcoming SPPs/RE projects indicated under Annexure-III, based on verified connectivity and project status, together with relevant normal and contingency operating conditions.Deliverable: Validated network model, study scenarios, model-validation report and complete native/editable model/database and relevant study files. |
| 4 | LOAD FLOW, VOLTAGE PROFILE, REVERSE POWER FLOW & RE HOSTING CAPACITY STUDY: The bidder shall carry out load-flow studies to assess voltage profile, MW/MVAR flows, losses and loading of lines/feeders/transformers under the developed load and RE scenarios. including the existing (AS-IS) network and future RE integration scenarios considering SPPs/RE projects indicated under Annexure-III. Voltage rise/overvoltage and reverse power flow shall be assessed at relevant 11 kV, 33 kV, 66 kV, 132 kV and 220 kV levels, and the limiting network elements/conditions shall be identified.Node-wise, feeder-wise and substation-wise RE hosting capacity shall be assessed throughout the study network covered under Annexures I and II, considering voltage, thermal loading, reverse power flow, short-circuit/protection, reactive-power and power-quality constraints. The bidder shall determine the maximum additional RE capacity that can be accommodated at relevant nodes/buses, feeders and substations by progressively increasing RE injection under the applicable study scenarios until the governing technical limits are reached, identifying the corresponding limiting constraints. Hosting capacity with the existing network and after suitable mitigation/strengthening shall be established.Based on the study results, technically suitable network locations, voltage levels and broad connectivity/evacuation alternatives for future RE integration shall also be identified considering network capability and applicable technical/regulatory requirements. Deliverable: Load Flow, Voltage Profile, Reverse Power Flow & RE Hosting Capacity Study Report, including identified constraints and findings/recommendations for future RE integration. |
| 5 | SHORT-CIRCUIT, PROTECTION, POWER QUALITY, REACTIVE POWER & RELIABILITY ASSESSMENT: The bidder shall carry out short-circuit/fault-level studies at relevant buses and assess equipment adequacy and, wherever applicable, system strength/SCR relevant to inverter-based RE integration. The impact of increased RE and bidirectional/reverse power flow on protection shall be assessed at study level and necessary changes in protection philosophy/scheme/settings recommended, based on the identified protection requirements and study findings. The assessment shall cover all substations and associated lines/feeders within the 220 kV to 11 kV study network defined under Annexures I and II, including RE-connected substations. The bidder shall collect and verify the existing protection schemes, relay details and settings from the respective substations, including necessary field verification where records are incomplete or unavailable, assess protection coordination, selectivity and adequacy under existing and future RE integration scenarios, and furnish technically justified recommendations for protection scheme modifications and relay settings, including recommended setting values and supporting calculations for identified deficiencies.Harmonics and other relevant power-quality impacts shall be assessed throughout the HPSEBL study network covered under Annexures I and II based on the field measurements undertaken under Job No. 1 and available plant/equipment information, including relevant industrial loads and commissioned RE installations connected to the study network. The assessment shall include the impact of power injected by commissioned SPPs/other RE sources on the HPSEBL network, including harmonic distortion, voltage fluctuations, flicker and unbalance, with reference to applicable CEA regulations, grid-code requirements and relevant standards. The anticipated power-quality impacts of under-construction, sanctioned and proposed SPPs/other RE sources, including those indicated under Annexure-III, shall also be assessed under the relevant future RE integration scenarios, using available inverter/equipment characteristics and technically justified assumptions. The assessment shall distinguish, to the extent supported by available measurements and technical analysis, the contribution of RE injection from existing background power-quality conditions and other connected loads. The bidder shall determine the measurement durations and operating conditions necessary for representative assessment at HPSEBL substations covered under Annexures I and II and recommend suitable mitigation measures for identified power-quality issues.Reactive-power requirements and voltage-control performance shall be assessed, including relevant transformer tap/OLTC/LDC and RE inverter reactive-power/PF/Volt-VAR capability. For commissioned SPPs, the bidder shall assess inverter reactive-power capability, permissible power-factor range, available voltage/reactive-power control modes and their implications for network voltage regulation, based on relevant technical specifications and operating data, with HPSEBL facilitating access to available records. Suitable operational measures and, based on the identified reactive-power and voltage-control requirements, capacitor/reactor/STATCOM/SVC or other appropriate compensation shall be evaluated.Relevant N-1/credible contingencies shall also be studied to identify network weaknesses, overloads, voltage limitations and reliability constraints.Deliverable: Consolidated Short-Circuit, Protection, Power Quality, Reactive Power/Voltage Control & Reliability Assessment Report with findings and recommendations, including identified protection deficiencies, recommended relay-setting modifications with supporting calculations, power-quality compliance assessment and proposed mitigation measures. |
| 6 | SYSTEM STRENGTHENING & RE INTEGRATION PLAN: Based on Jobs No. 1 to 4, the bidder shall identify, evaluate and compare technically feasible measures for removal/mitigation of identified constraints and enhancement of RE integration capability. These may include, as applicable, operational/control changes, inverter Volt-VAR/PF control, OLTC/LDC changes, network reconfiguration, reactive compensation, harmonic mitigation, reconductoring, transformer/substation augmentation, feeder strengthening, alternate/ring feeding, new lines/substations and suitable higher-voltage/dedicated RE evacuation or pooling arrangements.Existing/sanctioned/ongoing/proposed HPSEBL strengthening works relevant to the study shall be assessed based on information made available during the assignment, and additional/modification/alternative measures shall be recommended wherever necessary. BESS and suitable automation/monitoring/control solutions shall be considered only where technically and economically justified.Major recommended measures shall be incorporated in the study model and re-simulated, wherever applicable, to establish their effectiveness and resulting improvement in system performance/RE hosting capability.Deliverable: System Strengthening & RE Integration Plan, including alternatives evaluated, recommended measures and relevant before/after study results, indicating the expected improvement in RE hosting capacity and mitigation of identified constraints for major recommended measures. |
| 7 | IMPLEMENTATION ROADMAP, COSTING & LONG-TERM SYSTEM DEVELOPMENT PLAN: The bidder shall prepare a prioritized implementation roadmap for the recommended measures, categorized as Immediate/Short-Term (0–1 year), Medium-Term (1–3 years) and Long-Term (3–5 years), indicating location, identified constraint, proposed measure, indicative capacity/configuration, priority, technical justification and indicative CAPEX.Appropriate future load and RE-growth scenarios shall be developed and a Perspective System Development Plan beyond 5 years up to 25 years prepared, identifying major anticipated EHV/sub-transmission/distribution strengthening requirements. Future load-growth projections shall be provided by HPSEBL; indicative RE project details are enclosed under Annexure-III, while information on relevant existing/sanctioned/ongoing/proposed network-strengthening works of HPSEBL and EHV infrastructure planned by HPPTCL shall be made available by HPSEBL during execution of the assignment, to the extent available. The bidder shall verify the planning inputs and document technically justified assumptions adopted for development of the future study scenarios and Perspective System Development Plan.Planning-level engineering/DPR inputs shall also be provided for priority strengthening measures identified/accepted by HPSEBL, including relevant technical justification, indicative equipment capacities/configurations, broad scheme arrangements and cost estimates, to facilitate their subsequent processing.Deliverable: Implementation & Investment Roadmap, indicative CAPEX assessment and 25-year Perspective System Development Plan, together with planning-level inputs for identified priority works. |
| 8 | INSTITUTIONAL CAPACITY BUILDING – POWER SYSTEM ANALYSIS SOFTWARE, WORKSTATIONS & TRAINING: As an integral part of the consultancy and its institutional capacity-building and knowledge-transfer objectives, the bidder shall establish the requisite in-house power-system study capability at the HPSEBL System Planning Office through provision, installation and commissioning of an established utility-grade professional Power System Analysis Software, associated computing workstations and structured hands-on training, enabling HPSEBL to subsequently update the developed network model and undertake similar studies in-house.The software shall have proven application in power utilities/power-system planning and OEM-authorized technical support in India, with modules for load flow, short-circuit, contingency/N-1, voltage/reactive-power, harmonics/power-quality and RE hosting-capacity studies. The complete software/modules shall be provided under perpetual licences for two (2) systems, permitting simultaneous use on both supplied workstations, with five (5) years OEM-authorized maintenance and technical support, including applicable updates/upgrades, patches, bug fixes and licensing/technical assistance. Expiry of the support period shall not affect HPSEBL's continued use of the last eligible licensed version.The bidder shall provide two (2) complete, current-generation desktop tower workstation systems, each comprising a desktop computer with a minimum 12-core 64-bit processor, minimum 32 GB DDR5 RAM expandable to at least 64 GB, 1 TB NVMe SSD, integrated or dedicated graphics supporting a minimum display resolution of 1920 × 1200 at 32-bit colour depth, minimum 24-inch-class LED-backlit IPS monitor with WUXGA (1920 × 1200) or higher resolution, licensed 64-bit Windows 11 Professional operating system, keyboard, mouse and necessary connectivity. The workstations shall meet the software OEM's recommended hardware requirements for efficient execution of the specified studies; where the OEM requirement is higher, the higher configuration shall be provided. The workstations shall be provided with a minimum three (03) years comprehensive onsite OEM warranty from the date of successful installation and acceptance by HPSEBL, covering repair/replacement of defective hardware/components, including the supplied monitors, without any additional cost to HPSEBL.The bidder shall impart fifteen (15) working days of structured classroom and hands-on training to nominated HPSEBL personnel at the HPSEBL System Planning Office, comprising 10 working days after development of the substantially complete Una/Kangra network model and 5 working days after completion of the principal studies, through suitably experienced personnel proficient in the supplied software. The training shall cover model creation/updating and data validation, development of load/RE study scenarios, execution and interpretation of the specified studies, assessment of network constraints and strengthening alternatives, together with guided practical exercises and independent execution of representative study cases by HPSEBL personnel. Relevant study procedures, model documentation and training material shall also be handed over to HPSEBL.Deliverable: Completion of institutional capacity building and knowledge transfer to HPSEBL through the stipulated classroom and hands-on training using the actual Una/Kangra network model, including practical execution and interpretation of the specified studies; commissioning and handover of the Power System Analysis Software with two perpetual licences permitting simultaneous use on both supplied workstations and five-year OEM-authorized maintenance and technical support, two complete desktop tower workstation systems and relevant software/model documentation, study procedures and training material. |
| 9 | FINAL REPORT, PRESENTATION & COMPLETE HANDOVER: The bidder shall submit a Draft Comprehensive Study Report integrating the methodology, validated model, study scenarios/results, identified constraints, RE hosting-capacity/connectivity assessment, recommended strengthening measures, implementation roadmap, indicative CAPEX and long-term system-development plan, and shall present the findings/recommendations to HPSEBL.After addressing HPSEBL observations, the bidder shall submit the Final Comprehensive Study Report and hand over all study outputs, including updated study SLDs, validated models/databases, field/PQ data, simulation results, native/editable study files/cases, drawings, methodology/model documentation, data templates and other study-specific technical records developed under the assignment. The handed-over models, study cases and databases shall be compatible with the software supplied under Job No. 7 and shall be demonstrated to HPSEBL through successful opening, modification and execution of representative study cases on the supplied workstations.Deliverable: Accepted Final Comprehensive Study Report and complete study/model/data handover to HPSEBL. Sub total of Job 1 to 8 0.0 Goods and Services Tax @ 18% 0.0 Total Amount of BOQ Annexure (A) 0.0 MAIN ABSTRACT OF COST NAME OF WORK: COMPREHENSIVE STUDY OF RENEWABLE ENERGY INTEGRATION AND ITS IMPACT ON THE EHV/HV NETWORK, INCLUDING ASSESSMENT OF SYSTEM CONSTRAINTS AND STRENGTHENING REQUIREMENTS, IN UNA & KANGRA AREAS OF HIMACHAL PRADESH Sr. No. Scope of Work Unit Quantity Rate without GST Rate Reference |
| 10 | Jobs 1–6 & 8: Comprehensive power-system studies, analysis, assessment, recommendations and associated deliverables, as per finalized scope |
| 11 | Job 7: Institutional Capacity Building – Power System Analysis Software, Workstations and Training A Sub-total-I 69857403.17 |
| 12 | GST @18% on Sub-Total-I B Grand Total 82431735.7406 Annexure-I (Job 7: Detailed Cost Analysis) Sr. No. Description of Work Unit Quantity Rate without GST/Unit Rate without GST Rate Reference |
| 13 | Professional Power System Analysis Software – perpetual licences for two systems |
| 14 | Five-year OEM maintenance and support for the two new software licences |
| 15 | Complete desktop tower workstations, including WUXGA monitors and three-year OEM warranty |
| 16 | Structured hands-on training and knowledge transfer to HPSEBL engineers A Total 7436100.169999999 Annexure-A (Analysis of Rates) Sr. No. Description of Work Unit Quantity Rate without GST/Unit Rate without GST Rate Reference |
| 17 | HP Z2 Tower G1i CD3A8PA, 20-core processor, 32 GB DDR5, 1 TB NVMe SSD, Windows 11 Pro, three-year HP onsite warranty |
| 18 | Dell P2425, 24-inch-class WUXGA IPS LED monitor A Total for One Workstations 258327.53 |
AI Tender Summary
Tender Timeline
Nov 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 27 daysDec 18, 2026
Bid Opening Date
Technical bids will be opened and evaluated.