Tender For Re-Carpeting Of V-4 Road In Sector 15, 17, 21, 22 And 24, V-5 Road In Sector 15 And 19, V-6 Roads In Sector 15 And 21 And Parkings In Sector 17, 15, 18, 19, 21 And 22 Under The Jurisdiction Of Roads Sub Division No.2, M.C. Chandigarh. (Rai
Tender Overview
Project Description
Tender for Re-Carpeting Of V-4 Road In Sector 15, 17, 21, 22 And 24, V-5 Road In Sector 15 And 19, V-6 Roads In Sector 15 And 21 And Parkings In Sector 17, 15, 18, 19, 21 And 22 Under The Jurisdiction Of Roads Sub Division No.2, M.C. Chandigarh. (Raising Kerb/Channel Work)
BOQ
| Sl. No. | Item Description |
| 1 | Taking out existing Kerb/Channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 2 | Laying at or near ground level factory made old channel of size 2'x1'x3\\"made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished channel edging shall be measured to calculate volume for payment). |
| 3 | Providing and laying at or near ground level factory made channel of size 2'x1'x3\\" or 1'x1'x3\\" made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished channel edging shall be measured to calculate volume for payment) |
| 4 | Laying at or near ground level factory made old kerb stone of size 2'x9'x4\\"made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). |
| 5 | Laying at or near ground level factory made old kerb stone of size 1'x1'x4\\" made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). |
| 6 | Providing and laying at or near ground level factory made kerb stone of size 2'x9'x4\\"made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). |
| 7 | Providing and laying at or near ground level factory made kerb stone of size 1'x1'x4\\" made of plain cement concrete 1:2:4, in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender