Tender For Repair/Maint Of Gantries In Side Wsa Bldgs And Repair/Maint Of Hanger Doors, Hydraulic Jack And Misc Other Eqpts Installed At Af Stn Halwara
Tender Value
45 Lakhs
Estimated cost
Bid Submission
10 Dec 2026
21 days left
EMD
90000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ludhiana → Punjab
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/Maint Of Gantries In Side Wsa Bldgs And Repair/Maint Of Hanger Doors, Hydraulic Jack And Misc Other Eqpts Installed At Af Stn Halwara
BOQ
| Sl. No. | Item Description |
| 1 | Maintenance/serviceing of EOT 10 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 2 | Maintenance/serviceing of EOT 08 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same.(xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 3 | Maintenance/serviceing of EOT 05 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 4 | Maintenance/serviceing of EOT 02 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 5 | Maintenance/serviceing of EOT 1.00/ 0.5 Ton (electrically operated cranes) by the following method:-(i) Replacement of gear oil in gear boxes.(ii) Grease the whole crane. (iii) Before ferilling the gear boxes clean the gear box for inside and outside by using deisel. (iv) Checking the wheel condition.(v) If thruster breaks are used check the level of oil in it. If required to be refilled, refilled the same. (vi) Check the working of the break if required to change, then change the same. (vii) Checking the connections of motors. (viii) Check the condition of motors if required to be rewind, rewind the same. (ix) Checking the condition of couplings. If required to be change, change the same. (x) Check the nuts & bolts fitted on the crane. If required to be then change the same. (xi) Check the wire rope of the crane. If required to be replaced, replaced the same. (xii) Check the condition of power cables fitted on the crane. If required to be change, change the same. (xiii) Check the break shoe fitted on the break of the crane, If required to be replaced, replaced the same. (xiv) Check the limit switch fitted on the crane, if found unsv replaced the same. (xv) Check step down transformer, single phase preventer, thermal block, MCB, HRC and DBR, if found unsv repalced the same. (xvi) If VFD installed check the same, if found unsv replaced the same and check all the motions of VFD. (xvii) Check the pendent, if element and push buttons found unsv replaced the same complete all as specified and directed by Engr-in-Charge. |
| 6 | Notes for srl No 01 to 05 :- 1. Maintenance, Servicing, repairing of EOT shall be carried out by OEM or their authorised agency only. Contractor shall submit MoU to the Engr-in-Charge for this aspect within 28 days of Acceptance of tender failing which a penalty of Rs 500/- per day shall be imposed and contract shall liable to be cancelled and no claim shall be entertained on this account.2. Spare parts shall be measured and paid for separately under respective items as Supply only.3. Parts replaced shall be as per existing make. 4. Parts of minor nature such as nuts, bolts, screws & washers required at site are deemed to be included in the cost quoted. 5. Post Maint / Servicing of the gantry if any unserviceability is reported, the contractor must employ a technician who is readily available to attend the same with in 24 Hrs of receipt of complaint. Failure to this will impose a penality of Rs. 500/- per hour of delay after 24 Hrs. |
| 7 | Material and labour for load testing of crane any type any make infront of rep of Engr-in-Charge and AF auth complete all as specified and as directed.Note : -(i) Load will be provided by AF auth. (ii) Load test shall be carried out by any state govt / central govt or authorised agency of OEM and certificate of load testing shall be provided by the same authority. |
| 8 | S & F in replacement Gear oil SAF-90 No as per sample, complete all as specified and directed. |
| 9 | S & F in replacement Transformer oil for EOT crane as per sample, complete all as specified and directed. |
| 10 | S & F in replacement Grease as per sample, complete all as specified and directed. |
| 11 | S & F in replacement Contactor 3 phase 24 Amp crane as per sample, complete all as specified and directed. |
| 12 | S & F in replacement Contactor 3 phase 18 Amp as per sample, complete all as specified and directed. |
| 13 | S & F in replacement Contactor 3 phase 12 Amp as per sample, complete all as specified and directed. |
| 14 | S & F in replacement Coupling for EOT crane as per sample, complete all as specified and directed. |
| 15 | S & F in replacement VFD 15HP for EOT crane as per sample, complete all as specified and directed. |
| 16 | S & F in replacement VFD 5HP as per sample, complete all as specified and directed. |
| 17 | S & F in replacement VFD 3HP as per sample, complete all as specified and directed. |
| 18 | M&l for rewinding of electric Hoist motor of capacity 10 HP to 7.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc, complete all as specified and directed |
| 19 | M&L for rewinding of electric motor of capacity 5 HP to 3HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc complete all as specified and directed |
| 20 | M&L for rewinding of electric motor of capacity 3 HP to 0.5HP with super enamelled copper wire of size, gauge, weight and specification as that of exisiting material including insulation paper strips and thread etc complete all as specified and directed |
| 21 | S & F in replacement Power cable 6 Sqmm x 4 core for EOT crane as per sample, complete all as specified and directed. |
| 22 | S & F in replacement Power cable 4 Sqmm x 4 core for EOT crane as per sample, complete all as specified and directed. |
| 23 | S & F in replacement Power cable 1.5 Sqmm x 4 core for EOT crane as per sample, complete all as specified and directed. |
| 24 | S & F in replacement Step down transformer for EOT crane as per sample, complete all as specified and directed. |
| 25 | S & F in replacement Single phase preventer for EOT crane as per sample, complete all as specified and directed. |
| 26 | S & F in replacement Terminal block for EOT crane as per sample, complete all as specified and directed. |
| 27 | S & F in replacement MCB TPN 63 Amp for EOT crane as per sample, complete all as specified and directed. |
| 28 | S & F in replacement DBR for EOT crane as per sample, complete all as specified and directed. |
| 29 | S & F in replacement wire rope 16mm for EOT crane as per sample, complete all as specified and directed. |
| 30 | S & F in replacement wire rope 12mm for EOT crane as per sample, complete all as specified and directed. |
| 31 | S & F in replacement wire rope 8mm for EOT crane as per sample, complete all as specified and directed. |
| 32 | S & F in replacement wire rope 6mm for EOT crane as per sample, complete all as specified and directed. |
| 33 | S & F in replacement Thruster break 150mm for EOT crane as per sample, complete all as specified and directed. |
| 34 | S & F in replacement Thruster break 100mm for EOT crane as per sample, complete all as specified and directed. |
| 35 | S & F in replacement Break AC Shoe type 150mm for EOT crane as per sample, complete all as specified and directed. |
| 36 | S & F in replacement Break AC Shoe type 100mm for EOT crane as per sample, complete all as specified and directed. |
| 37 | S & F in replacement Break AC disc type 100mm for EOT crane as per sample, complete all as specified and directed. |
| 38 | S & F in replacement Break shoe for EOT crane as per sample, complete all as specified and directed. |
| 39 | S & F in replacement Limit switch FP for Hoist for EOT crane as per sample, complete all as specified and directed. |
| 40 | S & F in replacement Limit switch LT & CT F/P for Hoist for Hoist for EOT crane as per sample, complete all as specified and directed. |
| 41 | S & F in replacement Limit switch N/F/P for EOT crane as per sample, complete all as specified and directed. |
| 42 | S & F in replacement Element of Limit switch for EOT crane as per sample, complete all as specified and directed. |
| 43 | S & F in replacement Element of Push button for EOT crane as per sample, complete all as specified and directed. |
| 44 | S & F in replacement Push button F/P station for EOT crane as per sample, complete all as specified and directed. |
| 45 | S & F in replacement Push button station N/F/P for EOT crane as per sample, complete all as specified and directed. |
| 46 | M&L for reprogramming / resetting of exixting AC drive / variable frequency drive (VFD) / frequency converter device 3 phase supply system complete and testing on load and making disturbed wiring connection as properly system for smooth controlling panel of OHT crane and including replacement of defected / burn out control wiring connection for main controlling panel of crane as per existing system and including replacement of burnt out FRLS PVC insulated electric wire with copper conductor wirirng having of single core of size 0.5 sqmm to 2.5 sqmm, 1100 volt grade complete entire satisfactiion of Engineer -in-charge, complete all as specified and directed. |
| 47 | Taking down and repair of existing thruster break assembly and including rewinding of thruster break unit as per existing type/gauge of winding material and replacement of oil seal with connecting fixing accessories as per existing sample/model suitable for 2 to 5 Ton EOT crane and testing on load entire satisfaction of Engineer-in-charge, complete all as specified and directed. |
| 48 | Taking down and repair of existing thruster break assembly and including rewinding of thruster break unit as per existing type/gauge of winding material and replacement of oil seal with connecting fixing accessories as per existing sample/model suitable for 10 Ton EOT crane and testing on load entire satisfaction of Engineer-in-charge, complete all as specified and directed. |
| 49 | M&L for painting of EOT double girder travelling over head crane system alongwith trolly, footpath, railling system and its connected item fixing accessories/equipments complete for crane system by applying two coats of synthetic enamel paint of existing type color code after scrapping of old rusted surface and cleaning of oil and grease, soil dust particles material by manually with sand paper suitable for any capacity and Span and girder of any lenght, complete all as specified and directed. |
| 50 | M&L for painting of two coats of synthetic enamel paint of ISMB/Side Girders of crane in buildings of different sizes at different locations, cleaning the girders with waste cloth before painting complete with as per existing color complete all as specified and directed. Please Enable Macros to View BoQ information |
| 51 | M&L for painting of two coats of synthetic enamel paint of ISMB/Side Girders of crane in buildings of different sizes at different locations, cleaning the girders with waste cloth before painting complete with as per existing color complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysDec 12, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender