Tender For Quotation For Upgradation Of Stp At Jnp Township.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Nov 2026
5 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Raigad → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Quotation For Upgradation Of Stp At Jnp Township.
BOQ
| Sl. No. | Item Description |
| 1 | A..SEWAGE TREATMENT PLANT |
| 2 | The sewage Treatment shall be based on SBR technology. The nature of influent is domestic sewage from JNPA residential complex which shall be discharged into the STP. The scope shall include repairing of existing electrical, mechanical, plumbing, processing, ancillary equipments and works etc required to complete the package. Execution of civil works, however, shall be in the scope of the Civil contractor as per the design of the STP vendor. |
| 3 | Auto-coarse Bar screening |
| 4 | Supply, installation, testing and commissioning of automatic mechanical coarse bar screcn of 6 mm clear spacing, complete with automatic raking mechanism, screen bars, rake assembly, drive arrangement, geared motor, chain/sprocket mechanism, level-based operation with auto/manual operation, screenings discharge arrangement and all necessary accessories, including supporting structure, fasteners and embedded parts as required. |
| 5 | Spacing: 6 mm |
| 6 | MOC: SS 304 |
| 7 | Location: Inside scrcen chember |
| 8 | Make: Auric or equivalent |
| 9 | Oil & Grease Trap |
| 10 | Supply, installation,testing and commissioning of Oil & Grease Trap (OGT) for removal of floating oil, grease and scum from incoming sewage, complete with inlet/outlet piping, baffle arrangements, oil collection arrangement, access cavers, vent pipe and all required accessories. |
| 11 | MOC -RCC construction (M30 grade concrete), internal epoxy coating, SS 304 removable baftles and oil collection arrangement |
| 12 | Make: Aco/kessel or equivalent |
| 13 | Piping & Valves |
| 14 | Repairing of existing piping andSupply, installation, testing and commissioning of piping including pipes, fittings all types, adapters all types,flanges, nut, washers & bolts, gaskets, Supporting HDG structural steel works,clamps,mechanicalanchors in dry areas and chemical anchors for pipes submerged in water to maintain water proofing integrity, valves, approved signages etc. (Maximum permissible limit of flow in piping shall be 1.5 m/sec) |
| 15 | uPVC ASTM Sch 40 Piping - with fitting for all submerged piping for Air |
| 16 | Non Submerged air piping: GI heavy grade |
| 17 | All interconnecting discharge sewage water pipe- uPVC IS 4985, class 3 |
| 18 | Make :Astral/Prince/Jindal/Tata or equivalant |
| 19 | Supply, installation, testing and commissioning of SS 304 Air Distribution Grids as per requirment in SBR Tank with proper arrangements for installation in tank base, efficient flow of air and arrangements as required for fixing of air diffusers and connection wiih inlet air line including PCC blocks, eye bolts & hardware, PP ropes, hones etc. |
| 20 | MOC - SS 304 |
| 21 | All flanged for connections. |
| 22 | Make - Jindal or equivalent |
| 23 | Supply, installation, testing and commissioning of Tubular type non clog high efficiency fine bubble diffusers in a SBR tank and efficiently maintain the liquid therein in agitated condition to prevent settling of suspended solids. |
| 24 | Type - Disc/Tubular Type |
| 25 | MOC — EDPM |
| 26 | Discharge Capacity - Minimun M3/Hr/m. each diffuser |
| 27 | Make. rehau/Scogan or equivalent |
| 28 | Decanter System |
| 29 | Supply, installation, testing and commissioning of automatic SBR decanter system, complete with decant trough, scum baffle, motorized drive, gearbos, lifting mechanism, discharge piping, supports and PLC-based automatic controls |
| 30 | Complete wetted parts, decant trough, supports and associated fittings shall be SS 316/ SS 316L,suitable for 4 MLD SBR STP in 2 streams, including all accessories and commissioning. |
| 31 | MOC: Wetted parts SS304/SS316L; fasteners SS316 |
| 32 | Make: C-tech or equivalent |
| 33 | Replacement of PSF and ACF FilterMedia |
| 34 | Removal and disposal of existing filter media, cleaning and inspection of the both pressurised filter vessel, and supply, filling, installation, testing and commissioning of new graded filter media comprising coarse gravel, graded pebbles and siliCa sand of approval size and grade, including proper layering, supporting arrangement, backwashing and all necessary labour, tools and tackles, complete as per approved spacefications. |
| 35 | Filter media: fine sand, silica sand,coarse sand, pebbles |
| 36 | Note: There are 2 nos. of PSF availableat site |
| 37 | Removal and disposal of existing activated carbon media, cleaning and inspection of the both activated carbon filter vessel, and supply, filing, installation, testing and commissioning of new activated carbon media including supporting gravel, proper layering, backwashing and all necessary labour, tools and tackles, complete as per approved specifications. |
| 38 | Filter media: Activated carbon IV800,Pebbles |
| 39 | Note: There are 2 nos. of ACF availableat site |
| 40 | Repairing the existing, testing and commissioning of PLC-based automatic control panel for 4 MLD SBR STP, complate with PLC, HMI touch screen, MCC interface, VFD interface, relays, MCBs, contactors, power supply, terminal blocks, control wiring and communication accessories. Including integration of all field instruments and limit switches, wherever applicable, with complete calibration, loop checking, programming, testing etc. |
| 41 | PLC make-Delta |
| 42 | Switch gear-Schneider /Legrand/L&t |
| 43 | VFD: Danfoss/ Siemens/ABB/ Schneider |
| 44 | Total Cost of (A) |
| 45 | B.. Ultra- Filtration (UF) System |
| 46 | Design, engineering, supply, installation, testing and commissioning of a complete Ultrafiltration(UF) system suitable for meeting secondary treated effluent after ACF, with a net permeate capacity of 1.33 MLD including UF membranes, membrane modules, feed pumps, backwash pumps, chemical dosing System, CIP system, piping, valves, instrumentation, PLC-based control panel and all necessary acccessories. |
| 47 | UF Feed Pump (1 W+ IS) |
| 48 | Supply, installation, testing and commissioning of Secondary Effluent transfer Pumps (After ACF) as per following details with complete accessories as required |
| 49 | Type: Horizontal Centrifugal |
| 50 | Flow rate: 62 m3/hr @ 30 m head |
| 51 | Operating Pressure: 3 bar |
| 52 | Design Discharge pressure: 4 bar |
| 53 | Three phase IE2 |
| 54 | Make: Kirloskar or equivalent |
| 55 | Bag Filter |
| 56 | Supply, installation, testing and commissioning of Micron Cartridge (I working & 1 stend-by) with all neccssary connection as required |
| 57 | Flow rate :62 m3/hr |
| 58 | Filter rate: 50 micron |
| 59 | MOC Housing: SS |
| 60 | Make: Seamak or equivalent |
| 61 | UF Skid |
| 62 | Supply, installation, testing and commissioning of MS fabricated, epoxy/powder coated skid with membrane vessel supports, pump base,piping supports and access. |
| 63 | MOC: MS with powder coated |
| 64 | Make: Seamak or equivalent |
| 65 | UF Module |
| 66 | supply, installation, testing and commissioning of UF Module consisting of Membrane housing with UF membranes mounted om Skid |
| 67 | Area: 77 m2 |
| 68 | Housing: FRP |
| 69 | Flux: 52 LMH |
| 70 | Recovery: 88.8% |
| 71 | Module No: SFP-2880XP |
| 72 | Make: Dupont or equivalent |
| 73 | UF Backwash Pump |
| 74 | Supply, installation, testing andcommissioning of UF backwashPumps as per following details withcomplete accessories as require |
| 75 | Type: Horizontal Centrifugal |
| 76 | Flow rate: 110 m3/hr @ 25 m |
| 77 | Operating pressure: 2.5 bar |
| 78 | Design Discharge Pressure: 4 bar |
| 79 | Three phase IE2 |
| 80 | Make: Kirloskar/CNP or equivalent |
| 81 | Compressor |
| 82 | Supply,installation,testing and commissioning of feed pumps as per following details with complete accessories as required |
| 83 | Flow rate: 144 m3/hr @ 0.75 bar |
| 84 | Make: Franktech/Eq or equivalent |
| 85 | Pneumatic valves |
| 86 | Supply,installation, testing and commissioning of valves with flanges, nut, washers & bolts, gaskets with the following specification as required. |
| 87 | Make: Aira or equivalent |
| 88 | Pressure Gauges |
| 89 | Supply, installation, testing andcommissioning of pressure gaugeswith the following specification as required |
| 90 | 65nb Bottom open |
| 91 | Range: 0-7 kg/cm2 |
| 92 | Make: Baumer/H-guru or equivalent |
| 93 | uPVC Piping and Support |
| 94 | Supply, installation,testing and commissioning of piping including pipes, fittings all types, adapters aIl types, flanges, nut, washers & bolts, gaskets with the following specification as required. |
| 95 | Make: Astral or equivalent |
| 96 | Cables & Cable tray |
| 97 | Supply, installation, testing and commissioning of FRLS copper power and shielded control cables trays, cabling (Copper up to 16 Sq mm and Aluminium above 16 Sq mm), earthing from MCC/ PLC panel to equipment, wiring, control cabling etc. |
| 98 | Make: Polycab or equivalent |
| 99 | Chlorine Dosing Pump with tank |
| 100 | Supply, installation, testing and commissioning of Sodium hypochlorite dosing system with all necessary connection as required. |
| 101 | Flow rate: 0-12 LPH |
| 102 | MOC: PP |
| 103 | Tank Capacity: 200 L |
| 104 | MOC:HDPE |
| 105 | Make: E-dose & Sintex or equivalent |
| 106 | CIP Feed Pumps |
| 107 | Supply, installation, testing and commissioning of CIP feed Pumps as per following details with complete accessories as required |
| 108 | Type. Horizontal Centrifugal |
| 109 | Flow rate: 25 m3/hr @ 25 m |
| 110 | Operating pressure: 2.5 bar |
| 111 | Design Discharge Pressure: 4 bar |
| 112 | Three phase IE2 |
| 113 | Make: Kirloskar/CNP or equivalent |
| 114 | CIP Tank |
| 115 | Supply, installation,testing and commissioning of CIP tanks as per following details as required |
| 116 | Make: Sintex or equivalent |
| 117 | Capacity: 2000 lt |
| 118 | CIP Cartridge Filter |
| 119 | Supply, installation, testing and commissioning of CIP Cartridge filter with all necessary connection as required |
| 120 | Flow rate: 25m3/hr |
| 121 | Filter rate: 50 micron |
| 122 | MOC Housing: SS |
| 123 | Make: Seamak or equivalent |
| 124 | NaOH Dosing Pimp with tank |
| 125 | Supply, installation, testing and commissioning of NaOH Dosing Pump system with Dosing tank and including all cnnnection as required for Membrane cleaning. |
| 126 | Flow rate: 0-12 LPH |
| 127 | MOC: PP |
| 128 | Tank Capacity: 500 Ltr |
| 129 | MOC: LDPE |
| 130 | Make: E-dose or equivalent |
| 131 | HCI Dosing Pump with tank |
| 132 | Supply, installation, testing and commissioning of HCL Dosing Pump System with Dosing task and including all connection as required for Membrane cleaning. |
| 133 | Flow rate: 0-12 LPH |
| 134 | MOC: PP |
| 135 | Tank Capacity: 500 Ltr |
| 136 | MOC: LDPE |
| 137 | Make: E-dose or equivalent |
| 138 | Flow meter |
| 139 | Supply, installation, testing and commissioning of Electro-Magnetic Flow Meter with the cabling and the following specification as required |
| 140 | At UF feed,filtrate and backwash/CIPstreams |
| 141 | Make:Aster/ Forbes Marshall /Rockwin or equivalent |
| 142 | Control Panel |
| 143 | Supply, installation, testing and commissioning of PLC/HMI based automatic sequence for filtration, backwash, air scour and chemical cleaning; MCC and interlocks. |
| 144 | Make: Seamak or equivalent |
| 145 | Total Cost of (B) |
| 146 | C.. Reverse osmosis System(RO) |
| 147 | Design, engineering, supply,installation, testing and commissioning of a complete Reverse Osmosis (RO) system with a final net permeate capacity of 1 MLD, suitable for treating UF permeate, including high-pressure pumps, RO membranes, pressure vessels, cartridge filters, chemical dosing systems, CIP system, piping, valves, instrumentation, PLC-based control panel and all necessary accessories. |
| 148 | Feed water pump |
| 149 | supply, installation, testing and commissioning of feed water pumps as per following details with complete accessories as required |
| 150 | Type: Horizontal Centrifugal |
| 151 | Material of Construction: CI body |
| 152 | Capicity: 55.6m3/ hr @ 30 m head |
| 153 | Operating Pressure: 3 bar |
| 154 | Design Discharge pressure: 4 bar |
| 155 | Three Phase IE2 |
| 156 | Make: Kirloskar/Grundfos/CNP/CRI/eq or equivalent |
| 157 | Anti scalant Dosing system |
| 158 | Supply, installation, testing and commissioning of Antiscalent dosing system with all necessary connection as required. |
| 159 | Type: Electronic metering pump |
| 160 | Capacity of pump: 0-12 LPH |
| 161 | Make: E-dose or equivalent |
| 162 | MOC of tank: LDPF. |
| 163 | Capacity of tank: 200 Ltr. |
| 164 | Micron cartridge filter |
| 165 | Supply, installation, testing and commissioning of Micron Cartridge (1 working & 1 stand-by) with all necessary connection as required. |
| 166 | MOC of Housing: uPVC |
| 167 | Diameter Of cartridge: 6 inches |
| 168 | Length of cartridge: 32 inches |
| 169 | Type of cartridge: Pleated |
| 170 | cartridge rating: 5 microne |
| 171 | Frequency of change: 3 months |
| 172 | To protect the membrane and the highpressure pump from suspended particles |
| 173 | High pressure pump |
| 174 | supply, installtion, testing and commissioning of High pressure Pumps as per following details with complete accessories as required |
| 175 | Type: Vertical, Multistage, Centrifugal pump |
| 176 | MOC of Pump : SS 304 |
| 177 | Capecity: 55.6 m3/hr @ 13 bar |
| 178 | Operating pressure: 13 bar |
| 179 | Design Discharge pressure: 16 bar |
| 180 | Make: Wilo/ CNP/CRl or equivalent |
| 181 | Reverse Osmosis System |
| 182 | supply,installation, testing and commissioning of RO Moduleconsisting of Membrane housing WithRO membranes mounted on skid |
| 183 | Type of membrane: Ground water |
| 184 | Type of membrane: CompositePolyamide |
| 185 | MOC of membrene: Polyamide |
| 186 | Flux: 22.4 LMH, |
| 187 | Recovery: 75.1 % |
| 188 | MOC of pressure tube: FRP |
| 189 | Quantity of Pressure Tube: 5 |
| 190 | Make: Dupont or equivalent |
| 191 | Pressure Gauges |
| 192 | Supply, installation, testing &commissioning of Pressure gauges withthe following specification as required. |
| 193 | Ranges: 0-7 kg/cm2 |
| 194 | Type: Bourdon C-Type, Glycerine Filled |
| 195 | Make: Baumer/H-Guru or equivalent |
| 196 | High pressure switch |
| 197 | Supply, installation, testing &commissioning of high pressureswitched with the following specification as required. |
| 198 | Ranges: 0-25 Bar |
| 199 | Make: Danfoss/ WIKA / SwitzerHoneywell or equivalent |
| 200 | Piping & Valves |
| 201 | Supply, installation, testing andcommissioning of piping including pipes, fittings all types, adapters all types, flanges, nut, washers & bolts, gaskets with the following Specificationas required. |
| 202 | MOC: For water: UPVC |
| 203 | MOC: For High pressure side: SS |
| 204 | Make: Astral/Prince/Supreme or equivalent |
| 205 | Power and Control cable with cable tray |
| 206 | Supply, installation, testingand commissioning of FRLS copper power and shielded control cables trays, cabling (Copper up to 16 Sq mm and Aluminium above 16 Sq mm), earthing from MCC/ PLC panel to equipment, wiring, control cabling efc |
| 207 | Make:Polycab or equivalent |
| 208 | MOC: suitable |
| 209 | Insulation: Rubber |
| 210 | Electro-Magnetic Flow Meter |
| 211 | Supply, installation, testing and commissioning of Electro-Magnetic Flow Meter with the cabling and the following specification as required |
| 212 | At Feed, Permeate & Reject Flow |
| 213 | Make: Aster/ Forbes Marshall / Rockwin or equivalent |
| 214 | Pump Controller Panel |
| 215 | Supply, installation, testing and commissioning of PLC/HMI based control; VFD control, low/high pressure trips, tank level interlocks, conductivityalarm, auto-flush and safety shutdowns. |
| 216 | Make: Aster or equivalent |
| 217 | RO Skid |
| 218 | Supply, installation, testing andcommissioning of MS fabricated, epoxy/powder coated skid with membrane vessel supports, pump base,piping supports and access. |
| 219 | MOC:MS With powder coated |
| 220 | Make: Seamak Fabricated or equivalent |
| 221 | Conductivity Meter |
| 222 | Supply, installation, testing andcommissioning of Conductivity meter on RO permeate with the cabling as requried. |
| 223 | Measuring range:0-2,000 µS/cm |
| 224 | Accuracy: ±1% of reading |
| 225 | Sensor MOC:SS 316/suitable polymer |
| 226 | Temperature compensation : Automatic |
| 227 | Output: ± 20mA |
| 228 | Total Cost of (C) |
| 229 | Total A + B + C Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender