Tender For Combined Overhauling Package (Boiler, Turbine & Generator) Of Two Units (U#1&U#2) At Maitree Super Thermal Power Project (2X660mw) Bifpcl, Bangladesh.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Nov 2026
8 days left
EMD
5 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
24 Paraganas North → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Combined Overhauling Package (Boiler, Turbine & Generator) Of Two Units (U#1&U#2) At Maitree Super Thermal Power Project (2X660mw) Bifpcl, Bangladesh.
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: BHEL-PSER Name of Work: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. E-TENDER NO.: PSER:PUR:MAITREE-S687:26 (ENQ:26:PP:0015:PUR:44) Date 17-11-2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE (REV-00)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only, rate filled here will automatically reflect in SCH-1 - TOTAL PRICE NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SL. NO. DESCRIPTION OF EQUIPMENT/ITEM Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency TOTAL PRICE FOR TWO UNITS (JOB-A FOR U#1 & JOB-B FOR U#2) (IN INR) INCLUSIVE OF ALL TAXES AND DUTIES BUT EXCLUDING GST (IN FIGURE) Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL PRICE FOR THREE (03) UNITS OF BOILER(Rs) TOTAL AMOUNT With Taxes TOTAL PRICE FOR TWO UNITS (JOB-A FOR U#1 & JOB-B FOR U#2) (IN INR) INCLUSIVE OF ALL TAXES AND DUTIES BUT EXCLUDING GST(IN WORDS) |
| 2 | Total Price for COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. Details shall be as per tender. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only VOLUME-III, PRICE SCHEDULE, REV-00 JOB: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. E-TENDER NO.: PSER:PUR:MAITREE-S687:26 (ENQ:26:PP:0015:PUR:44) Date 17-11-2026 BIDDER'S NAME 0.0 PREAMBLE SL. NO. DESCRIPTION |
| 3 | This preamble forms part of tender document and schedule of items. The tenderer should read this preamble carefully before filling in rates for various items. Clauses under this preamble shall be read in conjunction with various volumes of tender and other tender sections as applicable and shall have precedence over any contrary statement mentioned any where in this document. |
| 4 | The work shall be carried out strictly as per specifications, description of the items in these schedule and / or engineer’s instructions. Drawings enclosed with the tender are only preliminary and for tender purposes and giving some idea of the work involved. The work is to be executed as per drawings & documents, which shall be furnished during execution. |
| 5 | Items of work provided in this schedule but not covered in this specification shall be executed strictly as per instruction of the engineer. |
| 6 | Prior written approval of BHEL shall be sought by the contractor in case quantity variation of any item crosses +50% (plus fifty percent) limit during execution and approval to be obtained before execution of further quantity for this item. |
| 7 | Rates shall be quoted in figures and in words in clear legible writing. No overwriting is allowed. All scoring and cancellations should be countersigned and in case of illegibility the interpretation of engineer shall be final. All entries shall be in English language. |
| 8 | All works item wise shall be measured upon completion and paid for at the rates quoted and accepted as per BHEL approved payment schedule/billing break-up. |
| 9 | The tenderer shall be deemed to have visited site and made himself aware of all the site conditions, studied the specifications and details of work to be done within the time schedule attached and to have acquainted himself of the conditions prevailing at site. |
| 10 | No splitting of the job is envisaged. Decision of BHEL in this regard shall be final and binding to the bidders. |
| 11 | Bidders are not allowed to alter the Price Schedule format including item description,quantity etc. and the offer is liable for rejection if the bidders submit their prices in Price Schedules modified by them. BHEL reserves the right to reject the offers of bidders who submit offers in Price Formats which are modiified/altered by them. Also putting any comments instead of rates/price in the designated column of the rate schedule shall make the offer liable for rejection. |
| 12 | Engineer’s decision shall be final and binding on the contractor regarding clarification of items in the schedule with respect to the other sections/volumes of the contract. |
| 13 | Size and weights of various items are mentioned in the attached BOQ cum rate/price schedule for reference purpose only & these shall not be taken into consideration for quoting/calculating amount in the rate schedule. These shall be utilised as per relevant sections of tender. Bidders shall quote for each item in the rate column, taking unit as mentioned in the quantity column. Rates shall be filled in both figures and words. Amount shall be calculated based upon these rates multiplied by the mentioned quantity for the respective items. |
| 14 | Bidder's Total price shall be considered for evaluation unless stated otherwise. VOLUME-III, PRICE SCHEDULE, REV-00 NAME OF JOB: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. E-TENDER NO.: PSER:PUR:MAITREE-S687:26 (ENQ:26:PP:0015:PUR:44) Date 17-11-2026 BIDDER'S NAME 0.0 SCH-1 - TOTAL PRICE SL. NO. DESCRIPTION OF EQUIPMENT/ ITEM PRICE SCHEDULE REF TOTAL PRICE FOR TWO UNITS (JOB-A FOR U#1 & JOB-B FOR U#2) (IN INR) INCLUSIVE OF ALL TAXES AND DUTIES BUT EXCLUDING GST (IN FIGURE) |
| 15 | Total Price for COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. Details shall be as per tender. Details shall be as per tender. NOTE:- |
| 16 | Taxes & Duties shall be as per Annexure - \\"SPECIAL NOTE TO BIDDERS\\". |
| 17 | Bidder shall quote total price at Sl No. 1 above. Price for each JOB-A & JOB-B will be derived from total quoted price for as per weightage for respective jobs mentioned in Schedule-2. As such, any uncalled figure/ amount noted at any other place / schedule of Volume-III will not be reckoned & will stand null & void. |
| 18 | The Payment of Individual item for Boiler, Turbine & Generator against Job-A & Job-B will be further derived from the percentage assigned against each activity as per Schedule - 3. |
| 19 | Based on the itemwise percentage allocations in Schedule 3, the amount for the individual items of the Bill of Quantity shall be arrived at. The rates of individual items shall be derived from the amount against each items after rounding off upto 8 decimal places. However, RA bill payment shall be done after rounding off the gross amount to two decimal places. The item rates so derived shall remain firm till execution of the work under scope of this tender. |
| 20 | Bidder to note that Total Price at Sl No.1 above shall be considered for evaluation. As such total price should be complete in all respect for the full scope defined and considering all terms and conditions. |
| 21 | The TOTAL QUOTED PRICE shall be \\"INCLUSIVE OF ALL TAXES & DUTIES, BUT EXCLUDING GST \\". GST shall be paid extra, as detailed in Taxes and duties clause as per Annexure - \\"SPECIAL NOTE TO BIDDERS\\". |
| 22 | Any item as per scope of work, if not included in the Price quoted above and shown seperately will not be taken cognizance of and the offer shall be liable for rejection. |
| 23 | Two separate LOI / order shall be placed for respective jobs of Job A and Job B. VOLUME-III, PRICE SCHEDULE, REV-00 JOB: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. E-TENDER NO.: PSER:PUR:MAITREE-S687:26 (ENQ:26:PP:0015:PUR:44) Date 17-11-2026 BIDDER'S NAME 0.0 SCH-2 - BREAK UP OF TOTAL PRICE SL. NO. DESCRIPTION OF EQUIPMENT/ ITEM QUANTITY WEIGHTAGE |
| 24 | JOB-A: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF UNIT # 1 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. |
| 25 | OVERHAULING PACKAGE (BOILER) OF UNIT # 1 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH, for Percentage breakup refer Schedule 3. |
| 26 | OVERHAULING PACKAGE (TURBINE & GENERATOR) OF UNIT # 1 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH, for Percentage breakup refer Schedule 3. |
| 27 | JOB-B: COMBINED OVERHAULING PACKAGE (BOILER TURBINE & GENERATOR) OF UNIT # 2 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. |
| 28 | OVERHAULING PACKAGE (BOILER) OF UNIT # 2 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH, for Percentage breakup refer Schedule 3. |
| 29 | OVERHAULING PACKAGE (TURBINE & GENERATOR) OF UNIT #2 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH, for Percentage breakup refer Schedule 3. TOTAL 1.0 VOLUME-III, PRICE SCHEDULE, REV-00 JOB: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF TWO UNITS (U#1&U#2) AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. E-TENDER NO.: PSER:PUR:MAITREE-S687:26 (ENQ:26:PP:0015:PUR:44) Date 17-11-2026 BIDDER'S NAME 0.0 SCH-3-PERCENTAGE BREAK UP OF SCHEDULE-2 Sl No 1.00 of SCH-2 JOB-A: COMBINED OVERHAULING PACKAGE (BOILER, TURBINE & GENERATOR) OF UNIT # 1 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. Sl No-1.10 of SCH-2 DESCIPTION QTY. PERCENTAGE TOTAL FOR BOILER SECTION OF JOB-A (BREAK UP OF SCH-2 SL NO 1.10) 1.0 PART-1: Boiler Pressure Parts, HP Valves, Hanger & supports, Insulation & Cladding, Refractory 0.56 A 0.48 Description of Activities Qty for U#1 (Refer Annex-IA for UOM) |
| 30 | Pre & Post S/D works during overhauling of 660MW Unit |
| 31 | Boiler Water Washing |
| 32 | CUPLOCK SCAFFOLDING ERECTION INSIDE FURNACE – 1ST PASS DURING OH |
| 33 | Scaffolding erection for 1st & 2nd Pass (Other than 1st pass scaffolding): |
| 34 | Lighting Services – Erection of Lights During OH |
| 35 | BOILER HPW Jet Cleaning During OH |
| 36 | BOILER NDT Checking in OH |
| 37 | Boiler Pressure Parts Welding Joints (Normal Joints) During OH |
| 38 | Boiler Pressure Parts Welding Joints (Critical Joints) During OH |
| 39 | BOILER TUBE THICKNESS MEASUREMENT IN OH |
| 40 | BOILER INSPECTION IN OH |
| 41 | ALIGNMENT OF TUBES OR COILS IN OH (1st pass coils and LTRH pendant coils) |
| 42 | Shielding of tube/ tube bend fabrication/ fins welding/anchor welding during OH |
| 43 | Dye-Penetration Test during OH |
| 44 | Boiler seal plate inspection & repair in Dry Bottom Ash Hopper in OH |
| 45 | BOILER (SAFETY NET) ERECTION IN OH – DIFFERENT AREAS |
| 46 | Stress Relieving (Preheating and PWHT) of Weld Joints during OH |
| 47 | Cassette Baffles Work during OH |
| 48 | Alignment works in OH - 2nd pass coil banks/horizontal banks/eco bank coils/ LTRH bank coils |
| 49 | Filling of gap space between LTRH, Economizer and Steam cooled walls in the second pass with G.I / SS Hexagonal wire mesh and Wire Mesh application on Water wall for refractory work in OH |
| 50 | LIFTING, INSPECTION & LOWERING OF ECO / LTRH/SH/RH COILS ASSEMBLY IN OH |
| 51 | SCW, second pass headers and hanger tubes inside Boiler including Back pass C header Stubs Inspection & Repair in OH |
| 52 | Inspection of Boiler headers, SH & RH spray nozzles in OH |
| 53 | Inspection, rectification of piping hangers of MS, CRH, HRH, Feed water boiler inters connection piping in boiler in OH |
| 54 | Servicing of HP valve Up to 20 inches in OH |
| 55 | Servicing of control valves up to 6 inch in OH |
| 56 | Replacement of HP valves up to 6 inch in OH |
| 57 | Servicing of safety valve in OH |
| 58 | Replacement of Safety valve in OH |
| 59 | Servicing of ERV main valve/pilot valve in OH |
| 60 | Safety valves/HP Valve seat cutting in OH |
| 61 | Assisting in safety valve floating in OH |
| 62 | Repairing of Manhole doors and Peepholes in OH |
| 63 | SERVICING OF WALL BLOWER in OH |
| 64 | SERVICING OF LRSB in OH |
| 65 | Application of Refractory in Boiler in OH |
| 66 | General scaffolding at various places (Erection & Removal) in OH B Ex BHEL Experts/ Ex-WRI or NDT Level-II Expert Supervisory Services 0.03 |
| 67 | Ex-BHEL Experts supervisory services for Hangers, Valves, Pressure Parts, and Ex-WRI/NDT Level- II supervisory services for Boiler C Amount Linked to Safety Aspects 0.03 D Commissioning Support for Scope of work BOQ 10.001 to 10.037 0.02 PART-2: Boiler Non-Pressure Parts consisting ESP & NPP- Fans, Air preheater, Burner, Duct, Gate & Dampers, Insulation & Cladding, Refractory 0.44 A Overhauling of Boiler Coal Compartment, Replacement and Reconditioning and other associated jobs 0.04 Description of Activities Qty for U#1 (Refer Annex-IA for UOM) |
| 68 | Removal & Fixing of Coal pipe elbows & gates in OH |
| 69 | Dismantling, Servicing and assembling of Burner Tilt in OH |
| 70 | Removal & Fixing of Coal compartments in OH |
| 71 | Removal / Replacement of Oil Nozzle Tip/End Air Nozzle Tip /Air Nozzle Tip /OFD Nozzle Tip: |
| 72 | In situ repair of Oil Nozzle Tip/End Air Nozzle Tip /Air Nozzle Tip /OFD Nozzle Tip AND Repairing of inlet guide vanes in Oil / air burner compartments in OH |
| 73 | Inspection of All Wind box Dampers & Attending its Defects in OH B Overhauling of ID, FD, PA, Seal Air, Scanner Fans, Duct Dampers, Expansion Joints and Air Preheaters. 0.24 Description of Activities Qty for U#1 (Refer Annex-IA for UOM) |
| 74 | Axial PA/ID/FD Fan INTERNAL INSPECTION IN OH |
| 75 | AXIAL PA & ID FAN DOUBLE STAGE FAN -OH |
| 76 | Axial ID/FD/PA Fan ALIGNIMENT IN OH |
| 77 | Axial FD/PA Fan (SILENCER) Cleaning in OH |
| 78 | AXIAL FD FAN – SINGLE STAGE FAN -OH |
| 79 | Seal Air Fan OH |
| 80 | Scanner Air Fan - OH |
| 81 | Duct Cleaning of all the flue Gas & Air ducts of Boiler in OH |
| 82 | Duct Inspection /Thickness Measurement in OH |
| 83 | Duct Repair in OH |
| 84 | DUCT STIFFNER PIPE – REPAIR IN OH |
| 85 | Duct Damper/Gate Servicing in OH |
| 86 | Duct Damper/Gate OH |
| 87 | Servicing of Gearbox of Gates/ Dampers in OH |
| 88 | Expansion Joints (Non-metallic) Replacement/Repair in OH |
| 89 | Manhole Replacement/Repair in OH |
| 90 | Application of Plastic Refractory in Duct in OH |
| 91 | FABRICATION WORK IN OH |
| 92 | Trisector APH – Water Washing & Basket Cleaning |
| 93 | Trisector APH Repair in OH. |
| 94 | Trisector APH - DIAPHRAGM Repair (REPLACEMENT/REPAIR OF HOT END DIVISION/DIAPHAGRM PLATES IN APH) IN OH. |
| 95 | Trisector APH (SECT.PLT) Repl (REPAIR/REPLACEMENT OF SECTOR PLATES TOP, BOTTOM, AXIAL IN APH) IN OH. |
| 96 | Gear Boxes SERVICING (REPLACEMENT & SERVICING OF HELICON, PRIMARY & SECONDARY GEAR BOXES IN MAIN APH) IN OH. |
| 97 | APH Fluid Coupling /Gear Box - Repair (SERVICING OF SPEED REDUCTION GEAR BOX & FLUID COUPLING OF ROTOR DRIVE ASSEMBLY IN APH) IN OH. |
| 98 | Trisector APH AIRMOTOR - SERVICING/REPLACEMENT OF AIR MOTOR IN APH-OH |
| 99 | Trisector APH - LABYRINTH SEAL SERVICING OF LABYRINTH SEAL IN MAIN APH-OH |
| 100 | Trisector APH (GUIDE BRG) - INSPECTION /REPLACEMENT OF TOP STEADY/GUIDE BEARING IN APH-OH |
| 101 | Trisector APH (SUP.BRG) - INSPECTION/REPLACEMENT OF BOTTOM/SUPPORT BEARING IN APH-OH |
| 102 | Trisector APH (ROTOR) LEVELLING (ROTOR LEVELING IN APH) IN OH. |
| 103 | Trisector APH (ROTOR POST SEAL) - REPLACEMENT OF ROTOR POST SEAL IN APH-OH. |
| 104 | Trisector APH (ROTOR TYRE) REPLACEMENT OF ROTOR TYRE/ROTOR ANGLE/ T-bar in OH. |
| 105 | Trisector APH (RD. SEAL) - SETTING OF TOP & BOTTOM (HOT & COLD END) RADIAL SEALS IN APH) in OH. |
| 106 | Trisector APH (AX. SEAL) SETTING (SETTING OF AXIAL SEALS IN APH) IN OH. |
| 107 | Trisector APH (BYP SEAL) SETTING (SETTING OF CIRCUMFERENTIAL/ BYPASS SEALS (TOP, BOTTOM) IN APH) IN OH |
| 108 | LUBRICATING OIL SYSTEM SERVICING IN APH-OH |
| 109 | REPLACEMENT/ REPAIR OF SOOT BLOWER IN APH-OH |
| 110 | INSPECTION, REPAIR & REPLACEMENT OF BRACING IN APH-OH. |
| 111 | LP valves repair (REPLACEMENT/SERVICING OF GATE/GLOBE VALVES (40 NB TO 150 NB) IN OH. |
| 112 | Penthouse & Dead Chamber cleaning & Repairing. C Overhauling of Electrostatic precipitator (ESP) 0.08 Description of Activities Qty for U#1 (Refer Annex-IA for UOM) |
| 113 | Water Washing of ESP Fields |
| 114 | Inspection of ESP Fields |
| 115 | Attending Defects and Alignment of ESP Fields |
| 116 | Replacement of Rapping Shaft |
| 117 | Replacement of Shaft Insulator/Support Insulators For EERM |
| 118 | Inner/Outer Arm, Bush Bearing Replacement |
| 119 | Replacement of Plain Bearing in ESP |
| 120 | Replacement of Pin Wheels in ESP |
| 121 | Attending Defects of ESP Manhole Door |
| 122 | Repair/Replacement of Shock Bar in ESP-OH |
| 123 | Replacement of Emitting Electrode in ESP-OH |
| 124 | Repair/ Replacement of Collecting Plate (Electrode) in ESP-OH |
| 125 | ESP Grip Coupling/Clutch coupling Attend Defect in EERM/CERM |
| 126 | ESP Gear Boxes Repair |
| 127 | ESP Gear Boxes Replace D Ex BHEL Experts Supervisory Services 0.04 |
| 128 | Ex-BHEL Experts supervisory services for Burners, ESP, Duct & Gates, APH supervisory services for Boiler E Amount Linked to Safety Aspects 0.02 F Commissioning Support for Scope of work BOQ 10.001 to 10.060 0.02 Sl no: 1.20 of SCH-2 TURBINE AND GENERATOR SECTION OF JOB-A: (BREAK UP OF SCH-2 SL NO 1.20) 1.0 A. TURBINE OVERHAULING 0.64 SECTION – I: LPT MODULE OVERHAULING (LP-1 & LP-2- 2 Nos.) 0.22 |
| 129 | Dismantling of IP-LP cross over pipe & Loosening of L P casing parting plane joints bolts and removal of LP outer shell. Covering of condenser from inside the condenser and prepare platform of LP casing joints plane. Making necessary scaffolding & approach platform for overhauling of LPT whenever required. Arrangement of cover is included in vendor’s scope of work. Loosening of joints plane bolts to remove LP inner-outer casing and LP inner- inner casing by heating process which is induction in nature after roll check during dismantling. Record all necessary radial and axial readings during dismantling of casing. Dismantling of both end cone. |
| 130 | Inspection of LP turbine internals and record radial and axial clearances of fixed and moving blades and rotor gland seals. Inspection/Removal of all balancing weight of LP rotor of both end and assembly of high-density balancing weight. Replacement / repair of damaged sealing rings of rotor and casing. Inspection and repair/replacement of inter-stage fins of LP Rotor as per requirement. Cleaning/flushing of LPT Exhaust hood spray line before final installation. |
| 131 | Removing of LP Rotor and placing it on Rotor stand support. Alumina-blast LP rotors, diaphragms and glands using a suitable dehumidification system. All blasting equipment, Arrangement of alumina (80 grit size), enclosure including proper illumination, dehumidification system and associated consumables shall be in the Contractor's scope. Thorough cleaning of bottom casing halves by manual cleaning. Ovality checking of LP inner-inner and inner outer casing, correction by grinding as per requirement. Tightening and loosening of casing by induction heating equipment. |
| 132 | Visual inspection and DPT of steam inlet bellows, all LP extractions bellows, LP front and rear gland bellows. Arrangement DPT kit along with operator is under vendor’s scope. Repair/Replacement as per requirement including arrangement of filler and welding rods. High pressure welding is also included in vendor’s scope. DPT of welding joints in the condenser stiffening structure/grid structure. Necessary rectification by grinding/welding etc. to be done. Inspection of LP Turbine Expansion Joints/Compensators (Shaft Seal Compensators & LPT Inlet Compensators) by DPT. DP test of LP rotor blades, stationary blades and LP casing in the suspected area /zone. |
| 133 | Placement of LP rotor inside bottom casing. Boxing-up of LP inner- inner and inner- outer casing by heating process which is induction in nature. Boxing- up of LP outer shell. Replace the gaskets in the Cross- Over pipe after thorough cleaning of mating flanges. Assembly of Cross over pipe. Roll check of LP rotor. Correction of internal radial and axial clearances. Assistance during Checking of Stationery blade discharge throat and pitch distribution. Assistance during measurement and recording the pitch chord angle as per the communication of EPRI for last stage blades of rotor and casing. Installation of inner casing thermocouple of LP turbine. |
| 134 | Setting of gland boxes as per recommended clearances. Removal and replacement of gland fins as required is within the scope. Inspection of safety diaphragms and replacement if required. Inspection of LP Turbine 5th stage blades. Inspection of seal steam return header BF valves, calibration, Re-installation & adjustment. |
| 135 | Removal of LP last stage blades (2L,2R, 3L& 3R) of both LP rotors, cleaning of blades at root, assistance during NFT of LP rotor FSB, matching as required to get improved NFT values, MPI (coil method) of all dismantled blades and rotor grooves by coiling process, assembly of blade with technological pieces, removal of blades, final assembly of blades with clamping pieces and locking the blades etc. Replacement of defective blade, if required. Arrangement of MPI kits including operator is included in the vendor’s scope. Transportation of blades from customer store to work area is in vendor’s scope. |
| 136 | Arrangement of NFT team along with operator, technological pieces, for measurement and rectification work for improvement of NFT value. Expert for blade root matching to be arranged by vendor. SECTION – II: TURBINE BEARING INSPECTION & OVERHAULING 0.2 |
| 137 | Remove insulation as required, carry out touch-up/reinstatement of insulation, and shift the generated scrap to the BIFPCL-designated scrap yard. All debris after completion of Overhauling work to be disposed at suitable site identified by customer. Vendor has to arrange necessary material handling equipment, truck etc. as required. Opening of bearing pedestal covers and removal of bearings for Inspection. Recording of rotor and casing control dimensions. Replacement of bearing oil guard fins and machining of the same outside power plant within the quoted price. Vendor has to arrange specialized work shop for machining outside the power houses of the plant. To and fro transportation of items to specialized work-shop for machining is included in vendor’ scope. Preparation of required fixtures if any. Dismantling and re- assembly of TG enclosure. Carrying out repair / replacement of keys, oil guard ring strips, and oil catcher ring strips etc as per requirement. |
| 138 | Catenary checking /measurement of bearing pedestal height of all bearings. Arrangement pots along with pipes for measurement of catenary for all bearings. Coupled run out and float of rotor system to be checked and recorded. Measurement of all reference readings during dismantling and assembly. Measurement of reference readings of rotor system. Measurement of swing values of rotor system during dismantling and reassembly. Decouple LP-2–Generator, LP-2–LP-1, LP-1–IP, IP–HP and HP–Turning Gear. De-Coupling/Coupling of rotor train to be carried out by hydraulic tools/suitable tools. Supply of Hydraulic tools/suitable tools are in Vendor’s scope |
| 139 | DP AND ULTRASONIC test of turbine bearings, thrust pads for cracks metal bonding. Replacement of bearings with new bearings, thrust pads as required. Blue matching of torus piece with base plate if required to the extent possible at site. Replacement of bearings if found not acceptable. Checking will be carried out outside of pedestal by removing support. Carry out DPT/thickness check of all JOP lines, seal oil and Lube oil lines welding joints, support/rubbing areas, bends etc. as per BHEL standard. Any repair work if required will be on the party’s scope. JOP lines (Brg-6,7 & 8) to be removed from position for DPT check and repairs works. Necessary clamping of loose pipelines to be done after DPT check/repair works. |
| 140 | Turbine rotors coupling faces correction. Facial correction of LP1,LP2,IP rotor as may be required. Arrangement of surface plate (6 delta accuracy) suitable for face correction for 660 MW unit is in vendor’s scope. |
| 141 | Alignment check of turbine rotors and corrections. Couple LP-2–Generator, LP-2–LP-1, LP-1–IP, IP–HP and HP–Turning Gear. Reaming and honing of coupling holes and replacement of coupling bolts, machining of coupling bolts as required. Drilling and reaming for Dowels of hydro motor. Final measurement of coupled run out and swing value. |
| 142 | Adjustment of bearing clearances and thrust float, boxing-up of all bearings, resetting of bearing yoke keys, pads and oil guard rings after repair / replacement, if any. Replacement of bearing pedestal oil guards’ fins. Machining of oil guard fins, bearing keys, coupling bolts, oil catchers etc are included in vendor scope. Arrangement of Portable Surface Grinder, as required is included in scope. |
| 143 | Barring gear inspection, repair / replacement, servicing of hand barring assembly, repair/replacement as per requirement. Decoupling, alignment and inspection of Barring Gear hydro motor, if required. Checking of overrun clutch. Servicing of Hydraulic valve block assembly, Solenoid valve and Needle valves of Turning Device. Centering check, roll check, axial bump check, swing check and Horn drop test of HP, IP & LP cylinder, Fixing and Lubrication of all sliding keys and packers of the cylinders etc. maintaining proper clearances. Preparation for platform below HP and IP turbine as required carrying out the job. Removal / dismantling and re-insulation of damaged portion as required. Make up insulation material to be provided by vendor. |
| 144 | Removal of oil throttles from Lube oil supply line bearing pedestals 1 to 7. Fixing of temporary piping for oil flushing from lube oil supply line to lube oil return header. Fixing of line filters /dummy etc. in all Lube oil supply lines if required as per requirement. Carry out oil flushing with intermediate cleaning of line filters, Lube oil duplex filter and MOT basket strainers etc as per requirement. Clean the MOT tank, including oil draining/emptying, internal inspection and refilling. Conduct vacuum inspection and adjustment of MOT and all bearings using a manometer after operation of the vapour exhauster Resetting of throttles including periodic cleaning of bearing filter, basket filter of MOT, duplex filters. Setting of JOP header pressure and checking of individual lift. Inspect, calibrate, reinstall and adjust seal-steam return-header BF valves. Bearings normalization after oil flushing. Lube oil flow measurement of bearing 1 to 8 of by ultrasonic Flow Meter , necessary adjustment if required. Putting the machine on barring gear with proper adjustment of jacking oil and Lube Oil pressure at bearings. |
| 145 | Arrangement of four crane operators duly vetted by customer and BHEL site Engineer in-charge for round the clock basis during entire duration of work. The crane operators should have work experience of minimum five years in TG overhauling work. |
| 146 | Carry out videoscope inspection of HPT, IPT and LP casings through available inspection/endoscopic holes and submit the inspection report. Arrangement of video scope with operator in vendor scope. Boroscopic inspection of HPT, IPT and others as per Standard Overhaul plan is to be ensured. Boroscopic machines & kits and ancillaries are under Party’s scope. |
| 147 | Painting of LPT-1 and LPT-2 outer casing, bearing pedestals, pipelines etc. Arrangement of paint & accessories is in Vendor’s scope. Painting schedule and color scheme attached in Annex -III |
| 148 | Foundation bolt stretching of all bearing pedestal including generator and exciter foundation bolt. Stretching device arrangement device to be arranged by vendor. Ultrasonic inspection of foundation anchor bolts in assembled condition. Pressure grouting of the bearing pedestal structure if required shall be in the party’s scope. SECTION-III: TURBINE VALVES OVERHAULING 0.04 |
| 149 | HPT, IPT stop and control valve, overload valve with servomotors - 2 Sets (Total 2 nos. of HP Control valve with hydraulic actuator / servomotor and 2 nos. of IP Control valve with servomotor. 1 no. of Overload valve and 2 nos. of HP stop valve with hydraulic actuator / servomotor and 2 nos. of IP stop valve with hydraulic actuator / servomotor to overhauled under the bidder.) WORK TO BE DONE AS UNDER: - Making necessary scaffolding & approach platform for servicing. Removal of insulation as required. Draining of oil from valve and hydraulic actuator / servomotor housing. Disconnection of oil pipelines and steam leak off lines. Decoupling of valve and hydraulic actuator / servomotor stem. Removal of hydraulic actuator / servomotor and valve cover with valve cone. Arrangement of induction heating for opening of valve casing studs. Induction heating will be arranged by BHEL. Dismantling of all valve internals of stop and control valves & hydraulic Actuators. Cleaning of all components, repair / replacement of damaged parts. Modification of valve bush and cone clearance, if found necessary. Cleaning and inspection of hydraulic actuator / servomotor assembly. Assembly of valve and hydraulic actuator / servomotor as per the designed clearance after servicing. Blue matching of all valves seats with seating. Lapping to be done with fabrication of lapping devices as per requirement. Placement of valve and servomotors and coupling etc. Dismantling and assembly of C&I probes along with limit switch. Calibration and setting of the strokes. Fixing of oil and steam lines. Setting of valves characteristics. Dismantling and fixing of position transmitter. Checking of governing characteristic and recalibration as per protocols/ standard curves of BHEL. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of bush/liners/cones/seal rings/pistons/spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope. Cleaning of strainer element (MS/IP) & inside of housing. DPT of welding joints & rectification, if required. Assembly of strainer in position with new seal ring. Stress relieving of weld joints, if required. Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Arrangement of MPI along with machines, kits & Technicians of studs/ bolts & nuts of ESV & IPSV, HPCV & IPCV. SECTION- IV: HPBP MAIN AND SPRAY VALVE SERVICING. 0.03 HPBP main and spray valve with actuators - Total 2 nos. of HPBP main valve with hydraulic actuator / servomotor and 3 nos. of HPBP Spray valve with actuator / servomotor to overhauled under the bidder.) WORK TO BE DONE AS UNDER: - 0.03 Making necessary scaffolding & approach platform for servicing. Removal of insulation as required. Removal of all oil pipes connected to valve actuator of both shut off & Control valve & Decouple of valves from actuator. Dismantling of all valves internals of shut off and control valves after removal of actuator assy. Cleaning and checking of all valve’s components by DP and UT. All necessary assistance including arrangement of UT set up are to be provided by vendor. Repair/ Replacement of defective parts, if required. 100% blue matching is to achieved of valve seat & disc by lapping. Assembly of valves by heat tightening of fixing bolts. Servicing of pilot & liner of valve assy along with replacement of all damage parts and pressure seal ring etc. Mounting of valve hydraulic actuator / servomotor and coupling. Re-fixing of all oil pipe lines Valve stroke setting and commissioning. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Replacement of Valve Seat of Main & Spray Valve included in Scope. Removal of old Valve seat. Re fixing of new seat with re setting tool. Welding of new seat with body as per standard followed by OEM/OES. Assembling of valves. Arrangement & Transportation of machine & tools/tackles to the work place at site & taking back is in vendor’s Scope. Arrangement of necessary approach/ working platform/scaffolding for successful completion of job. All consumables except Valve seat will be in the scope of successful bidder. SECTION- V: SERVICING OF LP BYPASS STOP & CONTROL VALVES 0.04 |
| 150 | SERVICING OF LP BYPASS STOP & CONTROL VALVES (Total 2 nos. of LP Bypass stop valves and 2 nos. of LP Bypass Control valves along with hydraulic actuator / servomotor to be overhauled) Making necessary scaffolding & approach platform for servicing. 0.04 Removal of insulation as required. Removal of all oil pipes connected to valve actuator & Decouple of valves from actuator. Dismantling of all valve internals of stop and control valves &Actuators. Cleaning and checking of all components of valve and hydraulic actuator / servomotor by DP and/or UT. UT, if required, Repair/Replacement of defective parts, if required. 100% blue matching is to be achieved of Stop valve seat & disc by lapping. Checking of all control dimensions and recording. Machining of components, if required Assembly of valves by heat tightening of fixing bolts. Servicing of hydraulic actuator(servomotor), replacement of defective components. Servicing of pilot & liner. Mounting of valve hydraulic actuator / servomotor and coupling. Valve stroke setting and commissioning. Re-fixing of all oil pipe lines. Valve stroke setting and commissioning. Cleaning of the working space and its surrounding from the debris (it may include insulation material, oil, grease, welding spatters etc.) from time to time; generated during the execution of the work Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Replacement of Valve Seat of Stop & Control Valve included in Scope. Removal of old Valve seat. Re fixing of new seat with re setting tool. Welding of new seat with body as per standard followed by OEM/OES. Assembling of valves. Arrangement & Transportation of machine & tools/tackles to the work place at site & taking back is in vendor’s Scope. Arrangement of necessary approach/ working platform/scaffolding for successful completion of job. All consumables except Valve seat will be in the scope of successful bidder. SECTION-VI: CRH NRV WITH SERVOMOTOR 0.01 |
| 151 | Making necessary scaffolding & approach platform for CRH NRV. Removal of existing insulation cladding sheet and insulation in the top cover area of NRV. Removal of oil pipe line from NRV servomotor, Decoupling of hydraulic actuator / servomotor from valve spindle and Removal of hydraulic actuator / servomotor from position. Opening the top cover of CRH NRV by making proper lifting arrangement and Removal of all internals like flap, spindle etc. Cleaning of all internals including pressure seal area and checking for any erosion mark in gasket seating areas. Carry out DPT as per requirement. Repair and Replacement of defective component. Carry out necessary matching/lapping etc. Build up and repair of eroded portion by grinding and matching/lapping. Box up of NRV with new pressure seal gasket/ components etc. Tightening of the cover to the required torque and hot tightening of the same after charging. Opening of hydraulic actuator / servomotor cover and inspection of hydraulic actuator / servomotor internals. Replacement of hydraulic actuator / servomotor soft parts. Replacement / repair of any defective item of hydraulic actuator / servomotor internals. Box up of servomotor. Fixing the hydraulic actuator / servomotor in position, coupling the hydraulic actuator / servomotor with NRV spindle and Fixing of oil pipes of servomotor. Attending to leakages if any after charging. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. SECTION VII: CONTROL VALVE SERVICING – UP TO 6\\", & REPLACEMENT/SERVICING OF MAL VALVE – MAXIMUM 10 NOS. 0.025 |
| 152 | For control valves of size up to 6\\", the Contractor shall carry out: a. Decoupling and removal of actuator. b. Inspection and servicing of actuator. c. Dismantling, cleaning and inspection of valve internals. d. DPT of applicable components. e. Lapping of seat/plug, as applicable. f. Repair/replacement of defective components, wherever required. g. Reassembly of valve internals and actuator. h. Coupling of actuator with valve and carrying out necessary adjustment. i. Recommissioning and functional testing of the valve. |
| 153 | Servicing/ Replacement of MAL valves & drip Valves– a. Decoupling and removal of actuator. c. Dismantling, cleaning and inspection of valve internals. d. DPT of applicable components. e. Lapping of seat/plug, as applicable. f. Repair/replacement of defective components, wherever required. g. Reassembly of valve internals and actuator. h. Coupling of actuator with valve and carrying out necessary adjustment. i. Recommissioning and functional testing of the valve. Replacement of high energy turbine drain valves (Mal drains control valves, make: HP valves, Netherland) and drip control valves of heaters (Make: KSB Mil). High pressure welder will be arranged by contractor for cutting old valves from position, fi-up and welding of new valve in position. All the welded joints of P 91/P22 are to be radiographed and stress relieved as required. Required electrode, SR machine etc. is in vendor scope. Removal of the insulation from pipelines and re-insulation after final work is in the Scope of vendor. Vendor has to arrange pipe bending machine for bend preparation, as required. SCTION VIII: HANGER INSPECTION 0.01 |
| 154 | Carrying out hanger setting & adjustment of turbine area hangers of power cycle piping such as MS/HRH/CRH/feed-water system etc. as given below. Hanger cold & hot readings are to be recorded. Scaffolding has to be made by the vendor as per requirement. a. Checking of Freeness of hangers. Cleaning & Servicing of hanger as required. b. Checking of fouling of hanger with the structure/wall. c. Removal of welding of hanger support with surrounding structure for the purpose of temporary supports if any. d. Checking for any visual deviation of hanger elevation noticeable or looseness of hangers. e. Adjustment of necessary hangers & supports as per requirement. 0.01 f. Any modification / rectification for the above job as required to be done by the vendor. g. Measurement of hot value of hanger before unit shut down. h. Measurement of cold value of hanger after unit shut down. i. Setting of cold value of hanger as per hanger schedule if required. Note: - Vendor has to depute one Ex-BHEL expert along with accommodation duly vetted by BHEL Site Engineer In Charge for a period 10 days for inspection and rectification of piping hanger & support. SECTION IX: HPSU, GOVERNING SYSTEM, TSI & LP CASING THERMOCOUPLES 0.01 |
| 155 | a. Carry out complete inspection, servicing, testing, commissioning and characteristic checking of the HP governing system, HPSU, EHA and associated valves through competent BHEL Mechanical/C&I experts, including necessary presence during turbine rolling and synchronization. b. Service the governing components, EHA and HPSU. Replace ion exchanger/oil filters, wherever required, and set R/C and main-pump pressures as per applicable requirements. c. Remove, service, reinstall, calibrate and recommission all trip solenoid, pilot and proportional valves mounted on Stop/Control Valves and HPSU. 0.01 d. Conduct and document all governing-system tests prior to removal/dismantling. e. Clean/replace actuator filters and service/replace servo and seat valves as per Hydraulic Circuit Diagram HS-A11-P592-0-A. f. Carry out TSI-related activities and removal/installation of LP casing thermocouples. g. Prepare and submit recommissioning/test reports as per applicable checklists, including Checklist Nos. CI-MAA001, CL-MAA101, CL-MAA104, TR-MAA010, TR-MAA015, TR-MAB010, CL-MAA111, CL-MAA114, TR-MAA020 and TR-MAB020, including the governing-characteristic report. SECTION X: OH/SERVICING OF GOVERNING SYSTEM OF TDBFP 0.015 |
| 156 | 1) Making necessary scaffolding & approach platform for Main Control Valve and Auxiliary Control Valve whenever required. 2) Removal of grills and canopy whenever required. 3) Removal of oil piping from servomotor, removal of servomotor assembly and pilot assembly from Emergency Stop Valve (ESV), Main Control Valve (MCV), Auxiliary Control Valve (ACV) & all TDBFP Aux steam supply NRV (ASV2). 0.015 4) Dismantling of ESV, MCV, ACV, NRV (ASV2) inspection and cleaning of valve internals. 5) Lapping of Seat and disc as per requirement and to the extent possible of ESV, MCV, ACV, NRV (ASV2) 6) Carryout DPT of valve internals of ESV, MCV, ACV, NRV (ASV2) as per requirement. 7) Carryout DPT of link assembly of MCV and ACV as per requirement. 8) Dismantling of and cleaning of Servo assembly and pilot assembly of ESV, MCV, ACV, NRV (ASV2). Repairing /Replacing the defective components and assembly of all internals of pilot assembly and servomotor assembly including Valve Seat. 9) Putting the valve internals, pilot assembly and servo assembly in position. 10) Fitting of oil piping and coupling of servomotors with valve. 11) Servicing / Inspection the components of governing rack and replacement, if any 12) Charging of system and attending of defects if any. 13) Assisting Governing expert during commissioning of the system. 14) Commissioning of the system and attending of defects if any. 15) Restoration of grills and canopy and removal of scaffolding etc. SECTION XI: OVERHAULING OF AUXILIARY EQUIPMENT AND SYSTEMS OF TG AREA 0.04 Overhauling of MDBFP: 0.015 a. Overhauling of booster pump: Dismantling of booster pump. Cleaning of internals of booster pump and assembling of booster pump b. Inspection of all bearings: Dismantling, cleaning and box-up of all bearings of MDBFP train. Replacement of bearing if necessary c. Total train alignment: Alignment of BFP to Hydraulic coupling, motor to Hydraulic Coupling and motor to booster pump. d. Mechanical seal inspection: Inspection of mechanical seal of booster pump and BFP. Replacement of mechanical seal if required. e. Replacement of MDBFP cartridge if required. Overhauling of TDBFP: 0.02 a. Overhauling of booster pump (2nos): Dismantling of booster pump. Cleaning of internals of booster pump and assembling of booster pump b. Inspection of all bearings (2nos TDBFPs): Dismantling, cleaning and box-up of all bearings of TDBFPs train. Replacement of bearing if necessary. c. Total train alignment (2nos TDBFPs): Alignment of BFP to Turbine, Turbine to Gearbox of booster pump and Gearbox to booster pump. d. Mechanical seal inspection (2nos TDBFPs): Inspection of mechanical seal of booster pump and BFP. Replacement of mechanical seal if required. e. Overhauling of TDBFP main pump (1 no.). Replacement of TDBFP cartridge if required. f. Only 01 BFP cartridge (either MDBFP /TDBFP) replacement is included in scope for 01 Unit. Condensate System: 0.005 a. Overhauling of 1 no. of CEP B. GENERATOR OVERHAULING 0.34 SECTION-I: GENERAL SCOPE 0.04 |
| 157 | Generator hydrogen/air tightness test is to be carried out before dismantling which includes hydrogen/air leakage checking in phase neutral and stator water bushing, joints on generator casing, all gas pipelines defects is to be attended during overhauling. Removal of Exciter dome after removing all electrical and C&I connections. Taking CRO of LP-Gen & Gen-Exciter. Note down alignment reading of LP-Gen as per protocol. Decouple LP-Gen Dismantling and removal of all seal oil, primary water & gas system pipeline and all dismantle pipe lines are to be covered with suitable blanks Dismantling and removal of seal assembly in both TE and EE along with oil catcher. Dismantling and removal of compressor assembly, TE and EE end shields after supporting rotor on skid plate (please ensure that the winding is at atmospheric pressure before transferring rotor weight on stator). Dismantling and removal of generator top & bottom end shields at both TE & EE. Blue matching of the parting plane of both sides’ end shields as well as matching of the faces of the end shields with seating surface on the stator body. Checking and recording of all clearances during dismantling which includes air gap, stator bore, magnetic center axis measurement etc. During dismantling all measurements are to be carried out as per protocol. Fixing arrangements for rotor thread out. Due care should be taken during rotor thread out so that rotor should not rub with stator or collide with stator which may damage the stator or rotor) Rotor thread out Placement of rotor on proper support .Sling for generator rotor thread-out (ENDLESS WIRE ROPE DIA-18 ,L-18m ,2 nos )shall arrange by vendor. SECTION-II: STATOR 0.09 |
| 158 | Dismantling of Stator end shields and replacement of sealing cords. Through Cleaning of stator core, winding and over hang with thinner. All cleaning agent are to be supplied by successful bidder within the quoted price. Through inspection of stator core, steps core packets and overhang, winding and rectification if required. Check condition of Stator support brackets and tightness. Check winding support structure and all other stator bolts and rectify defects. Replace all necessary Generator flange gaskets. Check expansion joint of stator water pipeline. Leakage test of Gas system Carrying out winding Hydraulic test of stator winding as per protocol and attending to leakages in water circuit. |
| 159 | Dismantling, Servicing and cleaning of H2 coolers, replacement of all gaskets and conducting Hydraulic test of all coolers and attending leakages if any. Painting of Water box with anti-rust paint. Anti-rust paint is to be arranged by vendor within the quoted price. |
| 160 | Removal of Generator phase and Neutral Link and replacement of Bushing sealing Gaskets, O rings and bushing Insulator (if required). |
| 161 | Checking of all electrical connections of stator like bushing connection, bar to bar connection and rectification of defects. Assistance in measuring IR value of generator. Complete air tightness test of Generator at the specified pressure out time period. Checking for leakages, if any are to be carried out by soap solution or any other method for the complete generator. All leakage to be arrested and the air tightness test is to be completed successfully. Checking of Seal-off bushing of generator. Replacement of Generator Manhole O-Ring. |
| 162 | Heating of generator stator and rotor with Halogen. Vendor should arrange 20 nos of 1000W halogen for heating. |
| 163 | Thorough cleaning of stator winding, dry out, varnishing of stator winding with Epoxy varnishing by dry oxygen cylinders to be provided by the successful bidder within the quoted price. Insulating varnish will be provide by customer. Assistance during inspection and rectification of all core end teeth packets and ventilation spacer of both end with knife edge. Mica powder mixed with resign and hardener shall be fill if found gap to ensure compactness of core. Mica, resign, hardener will be provided by BHEL. Cleaning agent all other assistance shall be provided by vendor. Fabrication of any special fixture and required for dismantling and assembly of generator. |
| 164 | Vendor has to depute one expert winder along with accommodation duly vetted by BHEL Site Engineer-in-Charge for a period 15 days for generator stator winding work. The successful bidder has to depute a competent C&I technician for the whole duration of the job. Checking of RTD and other C&I jobs. Any special tools fabrication if required to be made by agency with materials supply from customer. SECTION-III: ROTOR 0.04 |
| 165 | Perform Run-out checks as per protocol. Check rotor wedge and retaining rings. Inspect the winding and Gas duct. Dismantle Compressor Assembly. Carry out both fluorescent and normal DPT test of compressor blades and both fluorescent DPT and UT of both retaining rings after removal of paint. Check the IR of the compressor segments and rectify if found less. Surface matching of coupling faces. Surface plate for face matching (both LP-Gen & Gen-Exciter couplings) has to be arranged by the successful bidder within the quoted price. Check bearing surface and shaft Seal surface and rectify any defect. Perform Gas tightness test of rotor with nitrogen; Nitrogen to be arranged by the vendor within the quoted price. Clean all dismantled parts thoroughly before box up. Through cleaning of rotor winding, dry-out & varnishing of rotor winding with insulating varnish by dry oxygen. Oxygen cylinders to be arranged by the successful bidder within the quoted price. Rotor journal polishing as per requirement. |
| 166 | Any leakages from the CC bolt, sealing washers during air leakage are to be attended. Air leakage of Rotor to be done as per norm. Vendor has to arrange expert technician(s) acceptable to BHEL Site Engineer for attending the CC bolt, sealing washers. All T&Ps including Torque wrench (up to 1700 NM) and consumables required for correction like Rubber Compound K and Hardener T-3 7 to be arranged by the vendor. SECTION-IV: ASSEMBLY OF GENERATOR: 0.03 |
| 167 | Rotor thread in & resting the rotor on the bottom end shields. Assembly of end shield and injection of sealing compound/ TITE SEAL/ sealing compound will be supplied by the customer. Assembly of the compressor and air gap seal on both sides. Placement of top end shields on both sides. Assembly of inner oil catcher with maintaining required IR. Assembly of seal and seal bodies on both sides. Boxing up of all dismantled parts as per procedure, seal body IR measurement and bringing the IR value to the recommended value. Replacement of all Hose pipes. Alignment of LP-Gen. (shifting / lifting of stator to be done. Reaming Honing if and as required. Thorough cleaning to be carried out in Generator Bushing chamber and all flexible links and Teflon tube connections to checked and if found loose or damaged to be attended. Checking of shaft grounding brush system, cleaning and polishing of that area, proper alignment and placement of brush rocker assembly to be done. Painting of Generator and exciter cover (Painting to be provided by agency as per BHEL-Engineer in charge specification) SECTION-V: BEARINGS 0.02 |
| 168 | Removal of pedestal cover and bearing yoke and removal of Bearings 5, 6 7 and 8 top and bottom halves. DPT Test and UT of Bearings. The successful bidder has to arrange the full NDT kit along with the operator within the quoted price. Bottom half blue matching of front and rear bearing with bearing liner (saddle). IR measurement of saddle, oil catcher and oil guard rings. Correction of seal bore as per requirement. Bearing clearances yoke key clearances measurement and setting. Replacement of jacking oil hoses as per requirement. Oil guard ring and oil catcher clearances setting. Replacement of oil guard fins as per requirement and machining. Machining of oil labyrinth rings along with to and fro transportation from site to workshop and back to site is in the scope of the bidder within the quoted price. Replacement of half ring support of bearings 5 & 6, if required. Box up Bearings and yoke keys. DPT of coupling bolts of LP-Gen and Gen-Exciter couplings. Placement of pedestal cover of bearings after inspection work. CRO and swing check at bearing #7 to be recorded and to be corrected if found beyond design value. Replacement of Bearings (bearing Nos 5,6& 7) if required. SECTION-VI: EXCITER 0.03 |
| 169 | Decoupling of Gen-Exciter. Excitation cables connection & disconnection. Removal of all pipe lines of Bearing No.8, top cover of bearing No 8 and top half of Bearing shell. Checking of IR value of pedestal and if found less attending the same. Detail inspection of stator and any minor defect to be attended accordingly. Swing check of Exciter rotor for reference. Removal of exciter rotor and placing it on stand. Cleaning of slip ring holes and fan. Polishing of slip ring, rotor journals and coupling face and dimensional measurement of slip ring and rotor journals on OD. Cleaning of all dismantled parts thoroughly. |
| 170 | Cleaning of slip ring holes and fan. Polishing of slip ring, rotor journals and coupling face and dimensional measurement of slip ring and rotor journals on OD. Cleaning of all dismantled parts thoroughly. Inspect the bandage wire for any looseness or damage and rectifying the same found necessary. Exciter cooling fan & for all welding joints of pipelines connected to generator exciter DP test is to be carried out. DPT kit is to be supplied by vendor within the quoted price. Check and blue match the coupling flange. |
| 171 | Heating & varnishing of exciter components with dry oxygen. Dry oxygen cylinders are to be arranged by the successful bidder within the quoted price. Check the multi-contact band and replace the same if found defective. Visually inspect the exciter rotor bearing seating portion and rectify any defect. Check ground fault detection system and rectify any fault. |
| 172 | Replacement of all gaskets and providing proper sealing of exciter dome. Checking tightness of all foundation bolts of exciter bed and achieving stretching value of bolts as per design. Tightening spanner should be arranged by vendor. Alignment of Gen-exciter, swing check and coupling. Arrangement of torque range of suitable size for coupling and de coupling of generator exciter coupling is to be arranged by the successful bidder within the quoted price. Exciter rotor slip ring run-out measurement and if run out is observed then necessary remedial by machining and polishing action if required has to be taken by the successful bidder within the quoted price. SECTION-VII: TESTING: STATOR, GENERATOR AND EXCITER ROTOR-TEST KIT ALONG WITH TESTING EXPERT SHALL ARRANGE BY THE SUB-AGENCY. 0.04 |
| 173 | ROTOR TESTING- IR, AC IMPEDANCE, DC WINDING RESISTANCE and RSO, Voltage balance, BAROSCOPIC test on rotor. Test kit along with operator will be arrange by Sub-agency. TESTS FOR THE STATOR- IR, PI, DC WINDING RESISTANCE, TAN-DELTA, PARTIAL DISCHARGE TEST, ELCID, Baroscopic test on winding and core AND WEDGE DEFLECTION TEST ON STATOR WINDING. Test kit along with operator will be arranged by Sub-agency. EXCITER ROTOR: - IR, PI,WINDING RESISTANCE,VOLTAGE BALANCE TEST. Opening & reconnection of the Generator flexible connection to bus duct (line & neutral side) shall be done. Thorough cleaning & inspection shall be carried out before connection. Fluorescent DPT of Hydrogen compressor blades Retaining ring to be carried out. Test kit along with operator shall be arrange by vendor within the quoted price. SECTION-VIII: SHAFT SEALS 0.02 |
| 174 | Check for oil leakage in seal oil pipelines inside generator and attending the Leakage. Checking clearances of seal rings at both ends as per protocol. If required replacement of seal ring to be done. Transportation of seal ring for machining along with machining is in the scope of successful bidder within the quoted price. Visual inspection of seal rings for any damage. Carrying out DP/UT test on both set of seal rings (old and new) and replacement of the same if found damaged. Thorough cleaning of seal body. |
| 175 | Blue matching of seal body parting plane oil catcher parting plane and seal oil Teflon bush surface. Inspection of all Teflon bushes and replacement of the same if found damaged. Checking of seal oil hoses of impulse lines and replacing the same if found damaged. SECTION-IX: SEAL OIL SYSTEM 0.01 |
| 176 | DPR Servicing and replacement if required Servicing of float valve and if required the replacement of both IOT and seal oil vacuum tanks’ float valves. Cleaning seal oil filter and pipeline checking with dp test at welding joints Flushing of seal oil system and impulse lines, as per requirements and during flushing, cleaning of seal oil filter is to be ensured. SECTION-X: PRIMARY WATER SYSTEM 0.01 |
| 177 | Check and clean conical filter, magnetic filters and Y-strainers. Check complete primary water system for leakage after Hydraulic test and attend the same. Servicing of all valves in primary water system and if defect found then those are to be rectified. Checking of all welding joints through DPT and in case of defects rectification to be done. Check complete primary water system for leakage after Hydraulic test and attend the same. SECTION-XI: GAS SYSTEM 0.01 |
| 178 | Check all valves for leakage and attend the same Check and attend all gas leakages of entire Hydrogen system. Assistance during oil flushing Assistance during rolling & trim balancing (as required) of the machine. Measurement of OD after rectification. C. COMMISSIONING & SAFETY OFFICER DEPLOYMENT 0.02 |
| 179 | Deployment of 4 nos. safety officer (s) having qualification of Diploma in Safety / customer requirement for round the clock operation, arrangement of safety equipment, safety & HSE compliance (customer & BHEL) at site. |
| 180 | Housekeeping at BHEL site office and work place. |
| 181 | ASSISTANCE DURING COMMISSIONING/SYNCHRONIZATION OF THE UNIT AND OBSERVATION FOR 72 HRS AFTER SYNCRONIZATION OF MACHINE Sl No 2.00 of SCH-2 JOB-B: COMBINED OVERHAULING PACKAGE (BOILER TURBINE & GENERATOR) OF UNIT # 2 AT MAITREE SUPER THERMAL POWER PROJECT (2X660MW) BIFPCL, BANGLADESH. Sl No- 2.10 of SCH-2 DESCIPTION QTY PERCENTAGE TOTAL FOR BOILER SECTION OF JOB-B (BREAK UP OF SCH-2 SL NO 2.10) 1.0 PART-1: Boiler Pressure Parts, HP Valves, Hanger & supports, Insulation & Cladding, Refractory 0.56 A 0.48 Description of Activities Qty for U#2 (Refer Annex-IA for UOM) |
| 182 | Pre & Post S/D works during overhauling of 660MW Unit |
| 183 | Boiler Water Washing |
| 184 | CUPLOCK SCAFFOLDING ERECTION INSIDE FURNACE – 1ST PASS DURING OH |
| 185 | Scaffolding erection for 1st & 2nd Pass (Other than 1st pass scaffolding): |
| 186 | Lighting Services – Erection of Lights During OH |
| 187 | BOILER HPW Jet Cleaning During OH |
| 188 | BOILER NDT Checking in OH |
| 189 | Boiler Pressure Parts Welding Joints (Normal Joints) During OH |
| 190 | Boiler Pressure Parts Welding Joints (Critical Joints) During OH |
| 191 | BOILER TUBE THICKNESS MEASUREMENT IN OH |
| 192 | BOILER INSPECTION IN OH |
| 193 | ALIGNMENT OF TUBES OR COILS IN OH (1st pass coils and LTRH pendant coils) |
| 194 | Shielding of tube/ tube bend fabrication/ fins welding/anchor welding during OH |
| 195 | Dye-Penetration Test during OH |
| 196 | Boiler seal plate inspection & repair in Dry Bottom Ash Hopper in OH |
| 197 | BOILER (SAFETY NET) ERECTION IN OH – DIFFERENT AREAS |
| 198 | Stress Relieving (Preheating and PWHT) of Weld Joints during OH |
| 199 | Cassette Baffles Work during OH |
| 200 | Alignment works in OH - 2nd pass coil banks/horizontal banks/eco bank coils/ LTRH bank coils |
| 201 | Filling of gap space between LTRH, Economizer and Steam cooled walls in the second pass with G.I / SS Hexagonal wire mesh and Wire Mesh application on Water wall for refractory work in OH |
| 202 | LIFTING, INSPECTION & LOWERING OF ECO / LTRH/SH/RH COILS ASSEMBLY IN OH |
| 203 | SCW, second pass headers and hanger tubes inside Boiler including Back pass C header Stubs Inspection & Repair in OH |
| 204 | Inspection of Boiler headers, SH & RH spray nozzles in OH |
| 205 | Inspection, rectification of piping hangers of MS, CRH, HRH, Feed water boiler inters connection piping in boiler in OH |
| 206 | Servicing of HP valve Up to 20 inches in OH |
| 207 | Servicing of control valves up to 6 inch in OH |
| 208 | Replacement of HP valves up to 6 inch in OH |
| 209 | Servicing of safety valve in OH |
| 210 | Replacement of Safety valve in OH |
| 211 | Servicing of ERV main valve/pilot valve in OH |
| 212 | Safety valves/HP Valve seat cutting in OH |
| 213 | Assisting in safety valve floating in OH |
| 214 | Repairing of Manhole doors and Peepholes in OH |
| 215 | SERVICING OF WALL BLOWER in OH |
| 216 | SERVICING OF LRSB in OH |
| 217 | Application of Refractory in Boiler in OH |
| 218 | General scaffolding at various places (Erection & Removal) in OH B Ex BHEL Experts/ Ex-WRI or NDT Level-II Expert Supervisory Services 0.03 |
| 219 | Ex-BHEL Experts supervisory services for Hangers, Valves, Pressure Parts, and Ex-WRI/NDT Level- II supervisory services for Boiler C Amount Linked to Safety Aspects 0.03 D Commissioning Support for Scope of work BOQ 10.001 to 10.037 0.02 PART-2: Boiler Non-Pressure Parts consisting ESP & NPP- Fans, Air preheater, Burner, Duct, Gate & Dampers, Insulation & Cladding, Refractory 0.44 A Overhauling of Boiler Coal Compartment, Replacement and Reconditioning and other associated jobs 0.04 Description of Activities Qty for U#2 (Refer Annex-IA for UOM) |
| 220 | Removal & Fixing of Coal pipe elbows & gates in OH |
| 221 | Dismantling, Servicing and assembling of Burner Tilt in OH |
| 222 | Removal & Fixing of Coal compartments in OH |
| 223 | Removal / Replacement of Oil Nozzle Tip/End Air Nozzle Tip /Air Nozzle Tip /OFD Nozzle Tip: |
| 224 | In situ repair of Oil Nozzle Tip/End Air Nozzle Tip /Air Nozzle Tip /OFD Nozzle Tip AND Repairing of inlet guide vanes in Oil / air burner compartments in OH |
| 225 | Inspection of All Wind box Dampers & Attending its Defects in OH B Overhauling of ID, FD, PA, Seal Air, Scanner Fans, Duct Dampers, Expansion Joints and Air Preheaters. 0.24 Description of Activities Qty for U#2 (Refer Annex-IA for UOM) |
| 226 | Axial PA/ID/FD Fan INTERNAL INSPECTION IN OH |
| 227 | AXIAL PA & ID FAN DOUBLE STAGE FAN -OH |
| 228 | Axial ID/FD/PA Fan ALIGNIMENT IN OH |
| 229 | Axial FD/PA Fan (SILENCER) Cleaning in OH |
| 230 | AXIAL FD FAN – SINGLE STAGE FAN -OH |
| 231 | Seal Air Fan OH |
| 232 | Scanner Air Fan - OH |
| 233 | Duct Cleaning of all the flue Gas & Air ducts of Boiler in OH |
| 234 | Duct Inspection /Thickness Measurement in OH |
| 235 | Duct Repair in OH |
| 236 | DUCT STIFFNER PIPE – REPAIR IN OH |
| 237 | Duct Damper/Gate Servicing in OH |
| 238 | Duct Damper/Gate OH |
| 239 | Servicing of Gearbox of Gates/ Dampers in OH |
| 240 | Expansion Joints (Non-metallic) Replacement/Repair in OH |
| 241 | Manhole Replacement/Repair in OH |
| 242 | Application of Plastic Refractory in Duct in OH |
| 243 | FABRICATION WORK IN OH |
| 244 | Trisector APH – Water Washing & Basket Cleaning |
| 245 | Trisector APH Repair in OH. |
| 246 | Trisector APH - DIAPHRAGM Repair (REPLACEMENT/REPAIR OF HOT END DIVISION/DIAPHAGRM PLATES IN APH) IN OH. |
| 247 | Trisector APH (SECT.PLT) Repl (REPAIR/REPLACEMENT OF SECTOR PLATES TOP, BOTTOM, AXIAL IN APH) IN OH. |
| 248 | Gear Boxes SERVICING (REPLACEMENT & SERVICING OF HELICON, PRIMARY & SECONDARY GEAR BOXES IN MAIN APH) IN OH. |
| 249 | APH Fluid Coupling /Gear Box - Repair (SERVICING OF SPEED REDUCTION GEAR BOX & FLUID COUPLING OF ROTOR DRIVE ASSEMBLY IN APH) IN OH. |
| 250 | Trisector APH AIRMOTOR - SERVICING/REPLACEMENT OF AIR MOTOR IN APH-OH |
| 251 | Trisector APH - LABYRINTH SEAL SERVICING OF LABYRINTH SEAL IN MAIN APH-OH |
| 252 | Trisector APH (GUIDE BRG) - INSPECTION /REPLACEMENT OF TOP STEADY/GUIDE BEARING IN APH-OH |
| 253 | Trisector APH (SUP.BRG) - INSPECTION/REPLACEMENT OF BOTTOM/SUPPORT BEARING IN APH-OH |
| 254 | Trisector APH (ROTOR) LEVELLING (ROTOR LEVELING IN APH) IN OH. |
| 255 | Trisector APH (ROTOR POST SEAL) - REPLACEMENT OF ROTOR POST SEAL IN APH-OH. |
| 256 | Trisector APH (ROTOR TYRE) REPLACEMENT OF ROTOR TYRE/ROTOR ANGLE/ T-bar in OH. |
| 257 | Trisector APH (RD. SEAL) - SETTING OF TOP & BOTTOM (HOT & COLD END) RADIAL SEALS IN APH) in OH. |
| 258 | Trisector APH (AX. SEAL) SETTING (SETTING OF AXIAL SEALS IN APH) IN OH. |
| 259 | Trisector APH (BYP SEAL) SETTING (SETTING OF CIRCUMFERENTIAL/ BYPASS SEALS (TOP, BOTTOM) IN APH) IN OH |
| 260 | LUBRICATING OIL SYSTEM SERVICING IN APH-OH |
| 261 | REPLACEMENT/ REPAIR OF SOOT BLOWER IN APH-OH |
| 262 | INSPECTION, REPAIR & REPLACEMENT OF BRACING IN APH-OH. |
| 263 | LP valves repair (REPLACEMENT/SERVICING OF GATE/GLOBE VALVES (40 NB TO 150 NB) IN OH. |
| 264 | Penthouse & Dead Chamber cleaning & Repairing. C Overhauling of Electrostatic precipitator (ESP) 0.08 Description of Activities Qty for U#2 (Refer Annex-IA for UOM) |
| 265 | Water Washing of ESP Fields |
| 266 | Inspection of ESP Fields |
| 267 | Attending Defects and Alignment of ESP Fields |
| 268 | Replacement of Rapping Shaft |
| 269 | Replacement of Shaft Insulator/Support Insulators For EERM |
| 270 | Inner/Outer Arm, Bush Bearing Replacement |
| 271 | Replacement of Plain Bearing in ESP |
| 272 | Replacement of Pin Wheels in ESP |
| 273 | Attending Defects of ESP Manhole Door |
| 274 | Repair/Replacement of Shock Bar in ESP-OH |
| 275 | Replacement of Emitting Electrode in ESP-OH |
| 276 | Repair/ Replacement of Collecting Plate (Electrode) in ESP-OH |
| 277 | ESP Grip Coupling/Clutch coupling Attend Defect in EERM/CERM |
| 278 | ESP Gear Boxes Repair |
| 279 | ESP Gear Boxes Replace D Ex BHEL Experts Supervisory Services 0.04 |
| 280 | Ex-BHEL Experts supervisory services for Burners, ESP, Duct & Gates, APH supervisory services for Boiler E Amount Linked to Safety Aspects 0.02 F Commissioning Support for Scope of work BOQ 10.001 to 10.060 0.02 Sl no: 2.20 of SCH-2 TURBINE AND GENERATOR SECTION OF JOB-B: (BREAK UP OF SCH-2 SL NO 2.20) 1.0 A. TURBINE OVERHAULING 0.64 SECTION – I: LPT MODULE OVERHAULING (LP-1 & LP-2- 2 Nos.) 0.22 |
| 281 | Dismantling of IP-LP cross over pipe & Loosening of L P casing parting plane joints bolts and removal of LP outer shell. Covering of condenser from inside the condenser and prepare platform of LP casing joints plane. Making necessary scaffolding & approach platform for overhauling of LPT whenever required. Arrangement of cover is included in vendor’s scope of work. Loosening of joints plane bolts to remove LP inner-outer casing and LP inner- inner casing by heating process which is induction in nature after roll check during dismantling. Record all necessary radial and axial readings during dismantling of casing. Dismantling of both end cone. |
| 282 | Inspection of LP turbine internals and record radial and axial clearances of fixed and moving blades and rotor gland seals. Inspection/Removal of all balancing weight of LP rotor of both end and assembly of high-density balancing weight. Replacement / repair of damaged sealing rings of rotor and casing. Inspection and repair/replacement of inter-stage fins of LP Rotor as per requirement. Cleaning/flushing of LPT Exhaust hood spray line before final installation. |
| 283 | Removing of LP Rotor and placing it on Rotor stand support. Alumina-blast LP rotors, diaphragms and glands using a suitable dehumidification system. All blasting equipment, Arrangement of alumina (80 grit size), enclosure including proper illumination, dehumidification system and associated consumables shall be in the Contractor's scope. Thorough cleaning of bottom casing halves by manual cleaning. Ovality checking of LP inner-inner and inner outer casing, correction by grinding as per requirement. Tightening and loosening of casing by induction heating equipment. |
| 284 | Visual inspection and DPT of steam inlet bellows, all LP extractions bellows, LP front and rear gland bellows. Arrangement DPT kit along with operator is under vendor’s scope. Repair/Replacement as per requirement including arrangement of filler and welding rods. High pressure welding is also included in vendor’s scope. DPT of welding joints in the condenser stiffening structure/grid structure. Necessary rectification by grinding/welding etc. to be done. Inspection of LP Turbine Expansion Joints/Compensators (Shaft Seal Compensators & LPT Inlet Compensators) by DPT. DP test of LP rotor blades, stationary blades and LP casing in the suspected area /zone. |
| 285 | Placement of LP rotor inside bottom casing. Boxing-up of LP inner- inner and inner- outer casing by heating process which is induction in nature. Boxing- up of LP outer shell. Replace the gaskets in the Cross- Over pipe after thorough cleaning of mating flanges. Assembly of Cross over pipe. Roll check of LP rotor. Correction of internal radial and axial clearances. Assistance during Checking of Stationery blade discharge throat and pitch distribution. Assistance during measurement and recording the pitch chord angle as per the communication of EPRI for last stage blades of rotor and casing. Installation of inner casing thermocouple of LP turbine. |
| 286 | Setting of gland boxes as per recommended clearances. Removal and replacement of gland fins as required is within the scope. Inspection of safety diaphragms and replacement if required. Inspection of LP Turbine 5th stage blades. Inspection of seal steam return header BF valves, calibration, Re-installation & adjustment. |
| 287 | Removal of LP last stage blades (2L,2R, 3L& 3R) of both LP rotors, cleaning of blades at root, assistance during NFT of LP rotor FSB, matching as required to get improved NFT values, MPI (coil method) of all dismantled blades and rotor grooves by coiling process, assembly of blade with technological pieces, removal of blades, final assembly of blades with clamping pieces and locking the blades etc. Replacement of defective blade, if required. Arrangement of MPI kits including operator is included in the vendor’s scope. Transportation of blades from customer store to work area is in vendor’s scope. |
| 288 | Arrangement of NFT team along with operator, technological pieces, for measurement and rectification work for improvement of NFT value. Expert for blade root matching to be arranged by vendor. SECTION – II: TURBINE BEARING INSPECTION & OVERHAULING 0.2 |
| 289 | Remove insulation as required, carry out touch-up/reinstatement of insulation, and shift the generated scrap to the BIFPCL-designated scrap yard. All debris after completion of Overhauling work to be disposed at suitable site identified by customer. Vendor has to arrange necessary material handling equipment, truck etc. as required. Opening of bearing pedestal covers and removal of bearings for Inspection. Recording of rotor and casing control dimensions. Replacement of bearing oil guard fins and machining of the same outside power plant within the quoted price. Vendor has to arrange specialized work shop for machining outside the power houses of the plant. To and fro transportation of items to specialized work-shop for machining is included in vendor’ scope. Preparation of required fixtures if any. Dismantling and re- assembly of TG enclosure. Carrying out repair / replacement of keys, oil guard ring strips, and oil catcher ring strips etc as per requirement. |
| 290 | Catenary checking /measurement of bearing pedestal height of all bearings. Arrangement pots along with pipes for measurement of catenary for all bearings. Coupled run out and float of rotor system to be checked and recorded. Measurement of all reference readings during dismantling and assembly. Measurement of reference readings of rotor system. Measurement of swing values of rotor system during dismantling and reassembly. Decouple LP-2–Generator, LP-2–LP-1, LP-1–IP, IP–HP and HP–Turning Gear. De-Coupling/Coupling of rotor train to be carried out by hydraulic tools/suitable tools. Supply of Hydraulic tools/suitable tools are in Vendor’s scope |
| 291 | DP AND ULTRASONIC test of turbine bearings, thrust pads for cracks metal bonding. Replacement of bearings with new bearings, thrust pads as required. Blue matching of torus piece with base plate if required to the extent possible at site. Replacement of bearings if found not acceptable. Checking will be carried out outside of pedestal by removing support. Carry out DPT/thickness check of all JOP lines, seal oil and Lube oil lines welding joints, support/rubbing areas, bends etc. as per BHEL standard. Any repair work if required will be on the party’s scope. JOP lines (Brg-6,7 & 8) to be removed from position for DPT check and repairs works. Necessary clamping of loose pipelines to be done after DPT check/repair works. |
| 292 | Turbine rotors coupling faces correction. Facial correction of LP1,LP2,IP rotor as may be required. Arrangement of surface plate (6 delta accuracy) suitable for face correction for 660 MW unit is in vendor’s scope. |
| 293 | Alignment check of turbine rotors and corrections. Couple LP-2–Generator, LP-2–LP-1, LP-1–IP, IP–HP and HP–Turning Gear. Reaming and honing of coupling holes and replacement of coupling bolts, machining of coupling bolts as required. Drilling and reaming for Dowels of hydro motor. Final measurement of coupled run out and swing value. |
| 294 | Adjustment of bearing clearances and thrust float, boxing-up of all bearings, resetting of bearing yoke keys, pads and oil guard rings after repair / replacement, if any. Replacement of bearing pedestal oil guards’ fins. Machining of oil guard fins, bearing keys, coupling bolts, oil catchers etc are included in vendor scope. Arrangement of Portable Surface Grinder, as required is included in scope. |
| 295 | Barring gear inspection, repair / replacement, servicing of hand barring assembly, repair/replacement as per requirement. Decoupling, alignment and inspection of Barring Gear hydro motor, if required. Checking of overrun clutch. Servicing of Hydraulic valve block assembly, Solenoid valve and Needle valves of Turning Device. Centering check, roll check, axial bump check, swing check and Horn drop test of HP, IP & LP cylinder, Fixing and Lubrication of all sliding keys and packers of the cylinders etc. maintaining proper clearances. Preparation for platform below HP and IP turbine as required carrying out the job. Removal / dismantling and re-insulation of damaged portion as required. Make up insulation material to be provided by vendor. |
| 296 | Removal of oil throttles from Lube oil supply line bearing pedestals 1 to 7. Fixing of temporary piping for oil flushing from lube oil supply line to lube oil return header. Fixing of line filters /dummy etc. in all Lube oil supply lines if required as per requirement. Carry out oil flushing with intermediate cleaning of line filters, Lube oil duplex filter and MOT basket strainers etc as per requirement. Clean the MOT tank, including oil draining/emptying, internal inspection and refilling. Conduct vacuum inspection and adjustment of MOT and all bearings using a manometer after operation of the vapour exhauster Resetting of throttles including periodic cleaning of bearing filter, basket filter of MOT, duplex filters. Setting of JOP header pressure and checking of individual lift. Inspect, calibrate, reinstall and adjust seal-steam return-header BF valves. Bearings normalization after oil flushing. Lube oil flow measurement of bearing 1 to 8 of by ultrasonic Flow Meter , necessary adjustment if required. Putting the machine on barring gear with proper adjustment of jacking oil and Lube Oil pressure at bearings. |
| 297 | Arrangement of four crane operators duly vetted by customer and BHEL site Engineer in-charge for round the clock basis during entire duration of work. The crane operators should have work experience of minimum five years in TG overhauling work. |
| 298 | Carry out videoscope inspection of HPT, IPT and LP casings through available inspection/endoscopic holes and submit the inspection report. Arrangement of video scope with operator in vendor scope. Boroscopic inspection of HPT, IPT and others as per Standard Overhaul plan is to be ensured. Boroscopic machines & kits and ancillaries are under Party’s scope. |
| 299 | Painting of LPT-1 and LPT-2 outer casing, bearing pedestals, pipelines etc. Arrangement of paint & accessories is in Vendor’s scope. Painting schedule and color scheme attached in Annex -III |
| 300 | Foundation bolt stretching of all bearing pedestal including generator and exciter foundation bolt. Stretching device arrangement device to be arranged by vendor. Ultrasonic inspection of foundation anchor bolts in assembled condition. Pressure grouting of the bearing pedestal structure if required shall be in the party’s scope. SECTION-III: TURBINE VALVES OVERHAULING 0.04 |
| 301 | HPT, IPT stop and control valve, overload valve with servomotors - 2 Sets (Total 2 nos. of HP Control valve with hydraulic actuator / servomotor and 2 nos. of IP Control valve with servomotor. 1 no. of Overload valve and 2 nos. of HP stop valve with hydraulic actuator / servomotor and 2 nos. of IP stop valve with hydraulic actuator / servomotor to overhauled under the bidder.) WORK TO BE DONE AS UNDER: - Making necessary scaffolding & approach platform for servicing. Removal of insulation as required. Draining of oil from valve and hydraulic actuator / servomotor housing. Disconnection of oil pipelines and steam leak off lines. Decoupling of valve and hydraulic actuator / servomotor stem. Removal of hydraulic actuator / servomotor and valve cover with valve cone. Arrangement of induction heating for opening of valve casing studs. Induction heating will be arranged by BHEL. Dismantling of all valve internals of stop and control valves & hydraulic Actuators. Cleaning of all components, repair / replacement of damaged parts. Modification of valve bush and cone clearance, if found necessary. Cleaning and inspection of hydraulic actuator / servomotor assembly. Assembly of valve and hydraulic actuator / servomotor as per the designed clearance after servicing. Blue matching of all valves seats with seating. Lapping to be done with fabrication of lapping devices as per requirement. Placement of valve and servomotors and coupling etc. Dismantling and assembly of C&I probes along with limit switch. Calibration and setting of the strokes. Fixing of oil and steam lines. Setting of valves characteristics. Dismantling and fixing of position transmitter. Checking of governing characteristic and recalibration as per protocols/ standard curves of BHEL. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of bush/liners/cones/seal rings/pistons/spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope. Cleaning of strainer element (MS/IP) & inside of housing. DPT of welding joints & rectification, if required. Assembly of strainer in position with new seal ring. Stress relieving of weld joints, if required. Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Arrangement of MPI along with machines, kits & Technicians of studs/ bolts & nuts of ESV & IPSV, HPCV & IPCV. SECTION- IV: HPBP MAIN AND SPRAY VALVE SERVICING. 0.03 |
| 302 | HPBP main and spray valve with actuators - Total 2 nos. of HPBP main valve with hydraulic actuator / servomotor and 3 nos. of HPBP Spray valve with actuator / servomotor to overhauled under the bidder.) WORK TO BE DONE AS UNDER: - 0.03 Making necessary scaffolding & approach platform for servicing. Removal of insulation as required. Removal of all oil pipes connected to valve actuator of both shut off & Control valve & Decouple of valves from actuator. Dismantling of all valves internals of shut off and control valves after removal of actuator assy. Cleaning and checking of all valve’s components by DP and UT. All necessary assistance including arrangement of UT set up are to be provided by vendor. Repair/ Replacement of defective parts, if required. 100% blue matching is to achieved of valve seat & disc by lapping. Assembly of valves by heat tightening of fixing bolts. Servicing of pilot & liner of valve assy along with replacement of all damage parts and pressure seal ring etc. Mounting of valve hydraulic actuator / servomotor and coupling. Re-fixing of all oil pipe lines Valve stroke setting and commissioning. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Replacement of Valve Seat of Main & Spray Valve included in Scope. Removal of old Valve seat. Re fixing of new seat with re setting tool. Welding of new seat with body as per standard followed by OEM/OES. Assembling of valves. Arrangement & Transportation of machine & tools/tackles to the work place at site & taking back is in vendor’s Scope. Arrangement of necessary approach/ working platform/scaffolding for successful completion of job. All consumables except Valve seat will be in the scope of successful bidder. SECTION- V: SERVICING OF LP BYPASS STOP & CONTROL VALVES 0.04 |
| 303 | SERVICING OF LP BYPASS STOP & CONTROL VALVES (Total 2 nos. of LP Bypass stop valves and 2 nos. of LP Bypass Control valves along with hydraulic actuator / servomotor to be overhauled) Making necessary scaffolding & approach platform for servicing. 0.04 Removal of insulation as required. Removal of all oil pipes connected to valve actuator & Decouple of valves from actuator. Dismantling of all valve internals of stop and control valves &Actuators. Cleaning and checking of all components of valve and hydraulic actuator / servomotor by DP and/or UT. UT, if required, Repair/Replacement of defective parts, if required. 100% blue matching is to be achieved of Stop valve seat & disc by lapping. Checking of all control dimensions and recording. Machining of components, if required Assembly of valves by heat tightening of fixing bolts. Servicing of hydraulic actuator(servomotor), replacement of defective components. Servicing of pilot & liner. Mounting of valve hydraulic actuator / servomotor and coupling. Valve stroke setting and commissioning. Re-fixing of all oil pipe lines. Valve stroke setting and commissioning. Cleaning of the working space and its surrounding from the debris (it may include insulation material, oil, grease, welding spatters etc.) from time to time; generated during the execution of the work Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. Replacement of Valve Seat of Stop & Control Valve included in Scope. Removal of old Valve seat. Re fixing of new seat with re setting tool. Welding of new seat with body as per standard followed by OEM/OES. Assembling of valves. Arrangement & Transportation of machine & tools/tackles to the work place at site & taking back is in vendor’s Scope. Arrangement of necessary approach/ working platform/scaffolding for successful completion of job. All consumables except Valve seat will be in the scope of successful bidder. SECTION-VI: CRH NRV WITH SERVOMOTOR 0.01 |
| 304 | Making necessary scaffolding & approach platform for CRH NRV. Removal of existing insulation cladding sheet and insulation in the top cover area of NRV. Removal of oil pipe line from NRV servomotor, Decoupling of hydraulic actuator / servomotor from valve spindle and Removal of hydraulic actuator / servomotor from position. Opening the top cover of CRH NRV by making proper lifting arrangement and Removal of all internals like flap, spindle etc. Cleaning of all internals including pressure seal area and checking for any erosion mark in gasket seating areas. Carry out DPT as per requirement. Repair and Replacement of defective component. Carry out necessary matching/lapping etc. Build up and repair of eroded portion by grinding and matching/lapping. Box up of NRV with new pressure seal gasket/ components etc. Tightening of the cover to the required torque and hot tightening of the same after charging. Opening of hydraulic actuator / servomotor cover and inspection of hydraulic actuator / servomotor internals. Replacement of hydraulic actuator / servomotor soft parts. Replacement / repair of any defective item of hydraulic actuator / servomotor internals. Box up of servomotor. Fixing the hydraulic actuator / servomotor in position, coupling the hydraulic actuator / servomotor with NRV spindle and Fixing of oil pipes of servomotor. Attending to leakages if any after charging. Removal of temporary platforms and Scaffoldings. Minor repair/ welding/ machining of spindle/ stems/ seats etc as required in specialized work shop outside power plant to get the designed value including to & fro transportation of the items for machining outside the power plant is also under vendor's scope Reapplication of insulation in turbine and valve area. Make up insulation material to be provided by vendor. SECTION VII: CONTROL VALVE SERVICING – UP TO 6\\", & REPLACEMENT/SERVICING OF MAL VALVE – MAXIMUM 10 NOS. 0.025 |
| 305 | For control valves of size up to 6\\", the Contractor shall carry out: a. Decoupling and removal of actuator. b. Inspection and servicing of actuator. c. Dismantling, cleaning and inspection of valve internals. d. DPT of applicable components. e. Lapping of seat/plug, as applicable. f. Repair/replacement of defective components, wherever required. g. Reassembly of valve internals and actuator. h. Coupling of actuator with valve and carrying out necessary adjustment. i. Recommissioning and functional testing of the valve. |
| 306 | Servicing/ Replacement of MAL valves & drip Valves– a. Decoupling and removal of actuator. c. Dismantling, cleaning and inspection of valve internals. d. DPT of applicable components. e. Lapping of seat/plug, as applicable. f. Repair/replacement of defective components, wherever required. g. Reassembly of valve internals and actuator. h. Coupling of actuator with valve and carrying out necessary adjustment. i. Recommissioning and functional testing of the valve. Replacement of high energy turbine drain valves (Mal drains control valves, make: HP valves, Netherland) and drip control valves of heaters (Make: KSB Mil). High pressure welder will be arranged by contractor for cutting old valves from position, fi-up and welding of new valve in position. All the welded joints of P 91/P22 are to be radiographed and stress relieved as required. Required electrode, SR machine etc. is in vendor scope. Removal of the insulation from pipelines and re-insulation after final work is in the Scope of vendor. Vendor has to arrange pipe bending machine for bend preparation, as required. SCTION VIII: HANGER INSPECTION 0.01 |
| 307 | Carrying out hanger setting & adjustment of turbine area hangers of power cycle piping such as MS/HRH/CRH/feed-water system etc. as given below. Hanger cold & hot readings are to be recorded. Scaffolding has to be made by the vendor as per requirement. a. Checking of Freeness of hangers. Cleaning & Servicing of hanger as required. b. Checking of fouling of hanger with the structure/wall. c. Removal of welding of hanger support with surrounding structure for the purpose of temporary supports if any. d. Checking for any visual deviation of hanger elevation noticeable or looseness of hangers. e. Adjustment of necessary hangers & supports as per requirement. 0.01 f. Any modification / rectification for the above job as required to be done by the vendor. g. Measurement of hot value of hanger before unit shut down. h. Measurement of cold value of hanger after unit shut down. i. Setting of cold value of hanger as per hanger schedule if required. Note: - Vendor has to depute one Ex-BHEL expert along with accommodation duly vetted by BHEL Site Engineer In Charge for a period 10 days for inspection and rectification of piping hanger & support. SECTION IX: HPSU, GOVERNING SYSTEM, TSI & LP CASING THERMOCOUPLES 0.01 |
| 308 | a. Carry out complete inspection, servicing, testing, commissioning and characteristic checking of the HP governing system, HPSU, EHA and associated valves through competent BHEL Mechanical/C&I experts, including necessary presence during turbine rolling and synchronization. b. Service the governing components, EHA and HPSU. Replace ion exchanger/oil filters, wherever required, and set R/C and main-pump pressures as per applicable requirements. c. Remove, service, reinstall, calibrate and recommission all trip solenoid, pilot and proportional valves mounted on Stop/Control Valves and HPSU. 0.01 d. Conduct and document all governing-system tests prior to removal/dismantling. e. Clean/replace actuator filters and service/replace servo and seat valves as per Hydraulic Circuit Diagram HS-A11-P592-0-A. f. Carry out TSI-related activities and removal/installation of LP casing thermocouples. g. Prepare and submit recommissioning/test reports as per applicable checklists, including Checklist Nos. CI-MAA001, CL-MAA101, CL-MAA104, TR-MAA010, TR-MAA015, TR-MAB010, CL-MAA111, CL-MAA114, TR-MAA020 and TR-MAB020, including the governing-characteristic report. SECTION X: OH/SERVICING OF GOVERNING SYSTEM OF TDBFP 0.015 |
| 309 | 1) Making necessary scaffolding & approach platform for Main Control Valve and Auxiliary Control Valve whenever required. 2) Removal of grills and canopy whenever required. 3) Removal of oil piping from servomotor, removal of servomotor assembly and pilot assembly from Emergency Stop Valve (ESV), Main Control Valve (MCV), Auxiliary Control Valve (ACV) & all TDBFP Aux steam supply NRV (ASV2). 0.015 4) Dismantling of ESV, MCV, ACV, NRV (ASV2) inspection and cleaning of valve internals. 5) Lapping of Seat and disc as per requirement and to the extent possible of ESV, MCV, ACV, NRV (ASV2) 6) Carryout DPT of valve internals of ESV, MCV, ACV, NRV (ASV2) as per requirement. 7) Carryout DPT of link assembly of MCV and ACV as per requirement. 8) Dismantling of and cleaning of Servo assembly and pilot assembly of ESV, MCV, ACV, NRV (ASV2). Repairing /Replacing the defective components and assembly of all internals of pilot assembly and servomotor assembly including Valve Seat. 9) Putting the valve internals, pilot assembly and servo assembly in position. 10) Fitting of oil piping and coupling of servomotors with valve. 11) Servicing / Inspection the components of governing rack and replacement, if any 12) Charging of system and attending of defects if any. 13) Assisting Governing expert during commissioning of the system. 14) Commissioning of the system and attending of defects if any. 15) Restoration of grills and canopy and removal of scaffolding etc. SECTION XI: OVERHAULING OF AUXILIARY EQUIPMENT AND SYSTEMS OF TG AREA 0.04 Overhauling of MDBFP: 0.015 a. Overhauling of booster pump: Dismantling of booster pump. Cleaning of internals of booster pump and assembling of booster pump b. Inspection of all bearings: Dismantling, cleaning and box-up of all bearings of MDBFP train. Replacement of bearing if necessary c. Total train alignment: Alignment of BFP to Hydraulic coupling, motor to Hydraulic Coupling and motor to booster pump. d. Mechanical seal inspection: Inspection of mechanical seal of booster pump and BFP. Replacement of mechanical seal if required. e. Replacement of MDBFP cartridge if required. Overhauling of TDBFP: 0.02 a. Overhauling of booster pump (2nos): Dismantling of booster pump. Cleaning of internals of booster pump and assembling of booster pump b. Inspection of all bearings (2nos TDBFPs): Dismantling, cleaning and box-up of all bearings of TDBFPs train. Replacement of bearing if necessary. c. Total train alignment (2nos TDBFPs): Alignment of BFP to Turbine, Turbine to Gearbox of booster pump and Gearbox to booster pump. d. Mechanical seal inspection (2nos TDBFPs): Inspection of mechanical seal of booster pump and BFP. Replacement of mechanical seal if required. e. Overhauling of TDBFP main pump (1 no.). Replacement of TDBFP cartridge if required. f. Only 01 BFP cartridge (either MDBFP /TDBFP) replacement is included in scope for 01 Unit. Condensate System: 0.005 a. Overhauling of 1 no. of CEP B. GENERATOR OVERHAULING 0.34 SECTION-I: GENERAL SCOPE 0.04 |
| 310 | Generator hydrogen/air tightness test is to be carried out before dismantling which includes hydrogen/air leakage checking in phase neutral and stator water bushing, joints on generator casing, all gas pipelines defects is to be attended during overhauling. Removal of Exciter dome after removing all electrical and C&I connections. Taking CRO of LP-Gen & Gen-Exciter. Note down alignment reading of LP-Gen as per protocol. Decouple LP-Gen Dismantling and removal of all seal oil, primary water & gas system pipeline and all dismantle pipe lines are to be covered with suitable blanks Dismantling and removal of seal assembly in both TE and EE along with oil catcher. Dismantling and removal of compressor assembly, TE and EE end shields after supporting rotor on skid plate (please ensure that the winding is at atmospheric pressure before transferring rotor weight on stator). Dismantling and removal of generator top & bottom end shields at both TE & EE. Blue matching of the parting plane of both sides’ end shields as well as matching of the faces of the end shields with seating surface on the stator body. Checking and recording of all clearances during dismantling which includes air gap, stator bore, magnetic center axis measurement etc. During dismantling all measurements are to be carried out as per protocol. Fixing arrangements for rotor thread out. Due care should be taken during rotor thread out so that rotor should not rub with stator or collide with stator which may damage the stator or rotor) Rotor thread out Placement of rotor on proper support .Sling for generator rotor thread-out (ENDLESS WIRE ROPE DIA-18 ,L-18m ,2 nos )shall arrange by vendor. SECTION-II: STATOR 0.09 |
| 311 | Dismantling of Stator end shields and replacement of sealing cords. Through Cleaning of stator core, winding and over hang with thinner. All cleaning agent are to be supplied by successful bidder within the quoted price. Through inspection of stator core, steps core packets and overhang, winding and rectification if required. Check condition of Stator support brackets and tightness. Check winding support structure and all other stator bolts and rectify defects. Replace all necessary Generator flange gaskets. Check expansion joint of stator water pipeline. Leakage test of Gas system Carrying out winding Hydraulic test of stator winding as per protocol and attending to leakages in water circuit. |
| 312 | Dismantling, Servicing and cleaning of H2 coolers, replacement of all gaskets and conducting Hydraulic test of all coolers and attending leakages if any. Painting of Water box with anti-rust paint. Anti-rust paint is to be arranged by vendor within the quoted price. |
| 313 | Removal of Generator phase and Neutral Link and replacement of Bushing sealing Gaskets, O rings and bushing Insulator (if required). |
| 314 | Checking of all electrical connections of stator like bushing connection, bar to bar connection and rectification of defects. Assistance in measuring IR value of generator. Complete air tightness test of Generator at the specified pressure out time period. Checking for leakages, if any are to be carried out by soap solution or any other method for the complete generator. All leakage to be arrested and the air tightness test is to be completed successfully. Checking of Seal-off bushing of generator. Replacement of Generator Manhole O-Ring. |
| 315 | Heating of generator stator and rotor with Halogen. Vendor should arrange 20 nos of 1000W halogen for heating. |
| 316 | Thorough cleaning of stator winding, dry out, varnishing of stator winding with Epoxy varnishing by dry oxygen cylinders to be provided by the successful bidder within the quoted price. Insulating varnish will be provide by customer. Assistance during inspection and rectification of all core end teeth packets and ventilation spacer of both end with knife edge. Mica powder mixed with resign and hardener shall be fill if found gap to ensure compactness of core. Mica, resign, hardener will be provided by BHEL. Cleaning agent all other assistance shall be provided by vendor. Fabrication of any special fixture and required for dismantling and assembly of generator. |
| 317 | Vendor has to depute one expert winder along with accommodation duly vetted by BHEL Site Engineer-in-Charge for a period 15 days for generator stator winding work. The successful bidder has to depute a competent C&I technician for the whole duration of the job. Checking of RTD and other C&I jobs. Any special tools fabrication if required to be made by agency with materials supply from customer. SECTION-III: ROTOR 0.04 |
| 318 | Perform Run-out checks as per protocol. Check rotor wedge and retaining rings. Inspect the winding and Gas duct. Dismantle Compressor Assembly. Carry out both fluorescent and normal DPT test of compressor blades and both fluorescent DPT and UT of both retaining rings after removal of paint. Check the IR of the compressor segments and rectify if found less. Surface matching of coupling faces. Surface plate for face matching (both LP-Gen & Gen-Exciter couplings) has to be arranged by the successful bidder within the quoted price. Check bearing surface and shaft Seal surface and rectify any defect. Perform Gas tightness test of rotor with nitrogen; Nitrogen to be arranged by the vendor within the quoted price. Clean all dismantled parts thoroughly before box up. Through cleaning of rotor winding, dry-out & varnishing of rotor winding with insulating varnish by dry oxygen. Oxygen cylinders to be arranged by the successful bidder within the quoted price. Rotor journal polishing as per requirement. |
| 319 | Any leakages from the CC bolt, sealing washers during air leakage are to be attended. Air leakage of Rotor to be done as per norm. Vendor has to arrange expert technician(s) acceptable to BHEL Site Engineer for attending the CC bolt, sealing washers. All T&Ps including Torque wrench (up to 1700 NM) and consumables required for correction like Rubber Compound K and Hardener T-3 7 to be arranged by the vendor. SECTION-IV: ASSEMBLY OF GENERATOR: 0.03 |
| 320 | Rotor thread in & resting the rotor on the bottom end shields. Assembly of end shield and injection of sealing compound/ TITE SEAL/ sealing compound will be supplied by the customer. Assembly of the compressor and air gap seal on both sides. Placement of top end shields on both sides. Assembly of inner oil catcher with maintaining required IR. Assembly of seal and seal bodies on both sides. Boxing up of all dismantled parts as per procedure, seal body IR measurement and bringing the IR value to the recommended value. Replacement of all Hose pipes. Alignment of LP-Gen. (shifting / lifting of stator to be done. Reaming Honing if and as required. Thorough cleaning to be carried out in Generator Bushing chamber and all flexible links and Teflon tube connections to checked and if found loose or damaged to be attended. Checking of shaft grounding brush system, cleaning and polishing of that area, proper alignment and placement of brush rocker assembly to be done. Painting of Generator and exciter cover (Painting to be provided by agency as per BHEL-Engineer in charge specification) SECTION-V: BEARINGS 0.02 |
| 321 | Removal of pedestal cover and bearing yoke and removal of Bearings 5, 6 7 and 8 top and bottom halves. DPT Test and UT of Bearings. The successful bidder has to arrange the full NDT kit along with the operator within the quoted price. Bottom half blue matching of front and rear bearing with bearing liner (saddle). IR measurement of saddle, oil catcher and oil guard rings. Correction of seal bore as per requirement. Bearing clearances yoke key clearances measurement and setting. Replacement of jacking oil hoses as per requirement. Oil guard ring and oil catcher clearances setting. Replacement of oil guard fins as per requirement and machining. Machining of oil labyrinth rings along with to and fro transportation from site to workshop and back to site is in the scope of the bidder within the quoted price. Replacement of half ring support of bearings 5 & 6, if required. Box up Bearings and yoke keys. DPT of coupling bolts of LP-Gen and Gen-Exciter couplings. Placement of pedestal cover of bearings after inspection work. CRO and swing check at bearing #7 to be recorded and to be corrected if found beyond design value. Replacement of Bearings (bearing Nos 5,6& 7) if required. SECTION-VI: EXCITER 0.03 |
| 322 | Decoupling of Gen-Exciter. Excitation cables connection & disconnection. Removal of all pipe lines of Bearing No.8, top cover of bearing No 8 and top half of Bearing shell. Checking of IR value of pedestal and if found less attending the same. Detail inspection of stator and any minor defect to be attended accordingly. Swing check of Exciter rotor for reference. Removal of exciter rotor and placing it on stand. Cleaning of slip ring holes and fan. Polishing of slip ring, rotor journals and coupling face and dimensional measurement of slip ring and rotor journals on OD. Cleaning of all dismantled parts thoroughly. |
| 323 | Cleaning of slip ring holes and fan. Polishing of slip ring, rotor journals and coupling face and dimensional measurement of slip ring and rotor journals on OD. Cleaning of all dismantled parts thoroughly. Inspect the bandage wire for any looseness or damage and rectifying the same found necessary. Exciter cooling fan & for all welding joints of pipelines connected to generator exciter DP test is to be carried out. DPT kit is to be supplied by vendor within the quoted price. Check and blue match the coupling flange. |
| 324 | Heating & varnishing of exciter components with dry oxygen. Dry oxygen cylinders are to be arranged by the successful bidder within the quoted price. Check the multi-contact band and replace the same if found defective. Visually inspect the exciter rotor bearing seating portion and rectify any defect. Check ground fault detection system and rectify any fault. |
| 325 | Replacement of all gaskets and providing proper sealing of exciter dome. Checking tightness of all foundation bolts of exciter bed and achieving stretching value of bolts as per design. Tightening spanner should be arranged by vendor. Alignment of Gen-exciter, swing check and coupling. Arrangement of torque range of suitable size for coupling and de coupling of generator exciter coupling is to be arranged by the successful bidder within the quoted price. Exciter rotor slip ring run-out measurement and if run out is observed then necessary remedial by machining and polishing action if required has to be taken by the successful bidder within the quoted price. SECTION-VII: TESTING: STATOR, GENERATOR AND EXCITER ROTOR-TEST KIT ALONG WITH TESTING EXPERT SHALL ARRANGE BY THE SUB-AGENCY. 0.04 |
| 326 | ROTOR TESTING- IR, AC IMPEDANCE, DC WINDING RESISTANCE and RSO, Voltage balance, BAROSCOPIC test on rotor. Test kit along with operator will be arrange by Sub-agency. TESTS FOR THE STATOR- IR, PI, DC WINDING RESISTANCE, TAN-DELTA, PARTIAL DISCHARGE TEST, ELCID, Baroscopic test on winding and core AND WEDGE DEFLECTION TEST ON STATOR WINDING. Test kit along with operator will be arranged by Sub-agency. EXCITER ROTOR: - IR, PI,WINDING RESISTANCE,VOLTAGE BALANCE TEST. Opening & reconnection of the Generator flexible connection to bus duct (line & neutral side) shall be done. Thorough cleaning & inspection shall be carried out before connection. Fluorescent DPT of Hydrogen compressor blades Retaining ring to be carried out. Test kit along with operator shall be arrange by vendor within the quoted price. SECTION-VIII: SHAFT SEALS 0.02 |
| 327 | Check for oil leakage in seal oil pipelines inside generator and attending the Leakage. Checking clearances of seal rings at both ends as per protocol. If required replacement of seal ring to be done. Transportation of seal ring for machining along with machining is in the scope of successful bidder within the quoted price. Visual inspection of seal rings for any damage. Carrying out DP/UT test on both set of seal rings (old and new) and replacement of the same if found damaged. Thorough cleaning of seal body. |
| 328 | Blue matching of seal body parting plane oil catcher parting plane and seal oil Teflon bush surface. Inspection of all Teflon bushes and replacement of the same if found damaged. Checking of seal oil hoses of impulse lines and replacing the same if found damaged. SECTION-IX: SEAL OIL SYSTEM 0.01 |
| 329 | DPR Servicing and replacement if required Servicing of float valve and if required the replacement of both IOT and seal oil vacuum tanks’ float valves. Cleaning seal oil filter and pipeline checking with dp test at welding joints Flushing of seal oil system and impulse lines, as per requirements and during flushing, cleaning of seal oil filter is to be ensured. SECTION-X: PRIMARY WATER SYSTEM 0.01 |
| 330 | Check and clean conical filter, magnetic filters and Y-strainers. Check complete primary water system for leakage after Hydraulic test and attend the same. Servicing of all valves in primary water system and if defect found then those are to be rectified. Checking of all welding joints through DPT and in case of defects rectification to be done. Check complete primary water system for leakage after Hydraulic test and attend the same. SECTION-XI: GAS SYSTEM 0.01 |
| 331 | Check all valves for leakage and attend the same Check and attend all gas leakages of entire Hydrogen system. Assistance during oil flushing Assistance during rolling & trim balancing (as required) of the machine. Measurement of OD after rectification. C. COMMISSIONING & SAFETY OFFICER DEPLOYMENT 0.02 |
| 332 | Deployment of 4 nos. safety officer (s) having qualification of Diploma in Safety / customer requirement for round the clock operation, arrangement of safety equipment, safety & HSE compliance (customer & BHEL) at site. |
| 333 | Housekeeping at BHEL site office and work place. |
| 334 | ASSISTANCE DURING COMMISSIONING/SYNCHRONIZATION OF THE UNIT AND OBSERVATION FOR 72 HRS AFTER SYNCRONIZATION OF MACHINE Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender